Package 43 Widening Improvements To Riding Quality Cd Works To Government Roads In Ambasamudram H C Andm Sub Division Package 43 Widening Improvements To Riding Quality Construction Of Retaining Wall Reconstruction Of Culvert Paver Block Including Cd Wo
Tender Overview
Project Description
Package 43 Widening Improvements To Riding Quality Cd Works To Government Roads In Ambasamudram H C Andm Sub Division Package 43 Widening Improvements To Riding Quality Construction Of Retaining Wall Reconstruction Of Culvert Paver Block Including Cd Works To Government Roads In Ambasamudram H C Andm Sub Division Including Upkeeping For A Period
BOQ
| PACKAGE - 43 Widening, Improvements, Improvements to Riding Quality, Construction of Retaining Wall, Reconstruction of Culvert, Paver block including CD works to Government Roads in Ambasamudram (H) C&M, Sub – Division including upkeeping for a period of 60 months Name of Roads 1.Construction of Retaining wall at km 4/4 of Cheranmahadevi River Road2.Reconstruction of Culvert at km 1.2 of Venkatrengapuram Road3.Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months4.Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months5.Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months6.Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months 7.Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months8.Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months9.Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months10.Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer (Box cutting) as per SS20B for 97% Compaction for widening the lane as per MORTH Rev. V Clause No. 111, 112, 301 to 305, 900 | Item Code / Make1 | ||
| 2 | 2 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make2 | 820.75 | Cubic Metre |
| 3 | 3 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make3 | 1054.28 | Cubic Metre |
| 4 | 4 | Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for grading-V Material | Item Code / Make4 | ||
| 5 | 5 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make5 | 37.85 | Cubic Metre |
| 6 | 6 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make6 | 453.25 | Cubic Metre |
| 7 | 7 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make7 | 401.63 | Cubic Metre |
| 8 | 8 | Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for grading-III Material | Item Code / Make8 | ||
| 9 | 9 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make9 | 351.43 | Cubic Metre |
| 10 | 10 | Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed of the work and including all other incidental charges etc., complete as per standard specifications as per MORTH Rev. V Clause No. 111, 112, 202 | Item Code / Make10 | ||
| 11 | 11 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make11 | 1750 | Square Metre |
| 12 | 12 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make12 | 2022.1 | Square Metre |
| 13 | 13 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make13 | 1529.17 | Square Metre |
| 14 | 14 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make14 | 350 | Square Metre |
| 15 | 15 | Wet Mix Macadam (Table 400-13) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406) as per MORTH Rev. V Clause No. 111, 112, 406 & 900. | Item Code / Make15 | ||
| 16 | 16 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make16 | 28.39 | Cubic Metre |
| 17 | 17 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make17 | 1137.5 | Cubic Metre |
| 18 | 18 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make18 | 624.63 | Cubic Metre |
| 19 | 19 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make19 | 960.79 | Cubic Metre |
| 20 | 20 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make20 | 105 | Cubic Metre |
| 21 | 21 | Prime Coat (Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502) - over WMM/ WBM as per MORTH Rev. V Clause No. 111, 112,501,502 &900 . | Item Code / Make21 | ||
| 22 | 22 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make22 | 189.25 | Square Metre |
| 23 | 23 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make23 | 7700 | Square Metre |
| 24 | 24 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make24 | 6066.3 | Square Metre |
| 25 | 25 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make25 | 6595.65 | Square Metre |
| 26 | 26 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make26 | 1050 | Square Metre |
| 27 | 27 | Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over granular surfaces treated with primer as per MORTH Rev. V Clause No. 111, 112,501, 503 & 900. | Item Code / Make27 | ||
| 28 | 28 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make28 | 189.25 | Square Metre |
| 29 | 29 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make29 | 7700 | Square Metre |
| 30 | 30 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make30 | 6066.3 | Square Metre |
| 31 | 31 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make31 | 6595.65 | Square Metre |
| 32 | 32 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make32 | 1050 | Square Metre |
| 33 | 33 | Filling quarry dust from approved quarry including cost and conveyance of quarry dust and labour charges for filling the quarry dust etc., complete. | Item Code / Make33 | ||
| 34 | 34 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make34 | 3.6 | Cubic Metre |
| 35 | 35 | Providing colour designed concrete paver block floor finish used with concrete block of 40mm which has a compressive strength of 16.00 Mt/sqm. The rate including the cost concrete concrete block loading and conveyance to site and cost of labour for fixing in position the joints should be filled with sand including compacting by using power compactor etc.,complete complying with standard specification and also the rate including the labour charges for clearing the heavy and scrub,jungle,levelling the sites, diversion of water and sanitary pipe lines,dismantling the existing masonry structures etc.,complete complying as directed by the departmental officers. | Item Code / Make35 | ||
| 36 | 36 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make36 | 120 | Square Metre |
| 37 | 37 | Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per SS20B for 97% Compaction for widening the lane as per MORTH Rev. V Clause No. 111, 112, 301 to 305, 900 for protective wall | Item Code / Make37 | ||
| 38 | 38 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make38 | 16.95 | Cubic Metre |
| 39 | 39 | Cement Concrete of Grade M15 1:2:4 Nominal mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for foundation of protective wall | Item Code / Make39 | ||
| 40 | 40 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make40 | 7.35 | Cubic Metre |
| 41 | 41 | Vibrated Cement Concrete of Grade M15 1:2:4 Nominal mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for protective wall | Item Code / Make41 | ||
| 42 | 42 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make42 | 12.74 | Cubic Metre |
| 43 | 43 | Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces as per MORTH Rev. V Clause No. 111, 112, 503 & 900. | Item Code / Make43 | ||
| 44 | 44 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make44 | 4262.5 | Square Metre |
| 45 | 45 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make45 | 9750 | Square Metre |
| 46 | 46 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make46 | 8530 | Square Metre |
| 47 | 47 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make47 | 5680 | Square Metre |
| 48 | 48 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make48 | 3000 | Square Metre |
| 49 | 49 | Bituminous Macadam (Providing and laying 50mm bituminous macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as directed by the Engineeper clause 504) - as per MORTH Rev. V Clause No. 111, 112, 501, 504 & 900. | Item Code / Make49 | ||
| 50 | 50 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make50 | 9.47 | Cubic Metre |
| 51 | 51 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make51 | 385 | Cubic Metre |
| 52 | 52 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make52 | 303.32 | Cubic Metre |
| 53 | 53 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make53 | 329.78 | Cubic Metre |
| 54 | 54 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make54 | 52.5 | Cubic Metre |
| 55 | 55 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make55 | 97.5 | Cubic Metre |
| 56 | 56 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make56 | 82.25 | Cubic Metre |
| 57 | 57 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make57 | 56 | Cubic Metre |
| 58 | 58 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make58 | 29.06 | Cubic Metre |
| 59 | 59 | Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II as per MORTH Rev. V Clause No. 111, 112, 501, 507 & 900. | Item Code / Make59 | ||
| 60 | 60 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make60 | 5.68 | Cubic Metre |
| 61 | 61 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make61 | 231 | Cubic Metre |
| 62 | 62 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make62 | 181.99 | Cubic Metre |
| 63 | 63 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make63 | 197.87 | Cubic Metre |
| 64 | 64 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make64 | 159.38 | Cubic Metre |
| 65 | 65 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make65 | 292.5 | Cubic Metre |
| 66 | 66 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make66 | 255.9 | Cubic Metre |
| 67 | 67 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make67 | 170.4 | Cubic Metre |
| 68 | 68 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make68 | 90 | Cubic Metre |
| 69 | 69 | Excavation for Roadway and Drainage\nExcavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer \nd) Formation of embankment using Box Cutting earth for filling Berms | Item Code / Make69 | ||
| 70 | 70 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make70 | 400 | Cubic Metre |
| 71 | 71 | Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer.\na. Formation of embankment using Side Earth including compaction by Power Roller as per MORTH Rev. V Clause No. 111, 112, 301 to 305, 900 | Item Code / Make71 | ||
| 72 | 72 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make72 | 471.6 | Cubic Metre |
| 73 | 73 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make73 | 432 | Cubic Metre |
| 74 | 74 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make74 | 280 | Cubic Metre |
| 75 | 75 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make75 | 449 | Cubic Metre |
| 76 | 76 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make76 | 174 | Cubic Metre |
| 77 | 77 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make77 | 120 | Cubic Metre |
| 78 | 78 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make78 | 160 | Cubic Metre |
| 79 | 79 | Providing RCC M15 grade Precast KM Stones of standard design as per IRC 8-1980 and fixing in position including painting and printing etc. complete. | Item Code / Make79 | ||
| 80 | 80 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make80 | 1 | Nos |
| 81 | 81 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make81 | 1 | Nos |
| 82 | 82 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make82 | 1 | Nos |
| 83 | 83 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make83 | 1 | Nos |
| 84 | 84 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make84 | 2 | Nos |
| 85 | 85 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make85 | 1 | Nos |
| 86 | 86 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make86 | 1 | Nos |
| 87 | 87 | Providing RCC M15 grade Precast HM Stones of standard design as per IRC 8-1980 and fixing in position including painting and printing etc. complete. | Item Code / Make87 | ||
| 88 | 88 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make88 | 6 | Nos |
| 89 | 89 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make89 | 7 | Nos |
| 90 | 90 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make90 | 5 | Nos |
| 91 | 91 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make91 | 5 | Nos |
| 92 | 92 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make92 | 10 | Nos |
| 93 | 93 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make93 | 5 | Nos |
| 94 | 94 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make94 | 4 | Nos |
| 95 | 95 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make95 | 3 | Nos |
| 96 | 96 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectoring glass beads @ 250 gms per sqm area thickness of 2.5 mm exclusive of surface applied glass beads as per IRC:35. The finished surface to be level uniform and free from streaks and holes | Item Code / Make96 | ||
| 97 | 97 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make97 | 293 | Square Metre |
| 98 | 98 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make98 | 403.89 | Square Metre |
| 99 | 99 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make99 | 269.37 | Square Metre |
| 100 | 100 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials tool and equipments and all other incidental charges such as baling our water,sheeting, shoring, bracing and their subsequent removal, removal and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., indicated by the Engineer for Foundation of Retaining Wall | Item Code / Make100 | ||
| 101 | 101 | Construction of Retaining wall at km 4/4 of Cheranmahadevi River Road | Item Code / Make101 | 270 | Cubic Metre |
| 102 | 102 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make102 | 548.1 | Cubic Metre |
| 103 | 103 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make103 | 324 | Cubic Metre |
| 104 | 104 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make104 | 64.86 | Cubic Metre |
| 105 | 105 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make105 | 159.84 | Cubic Metre |
| 106 | 106 | Cement Concrete of Grade M15 1:2:4 Nominal mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for foundation of retaining wall | Item Code / Make106 | ||
| 107 | 107 | Construction of Retaining wall at km 4/4 of Cheranmahadevi River Road | Item Code / Make107 | 81 | Cubic Metre |
| 108 | 108 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make108 | 234.9 | Cubic Metre |
| 109 | 109 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make109 | 108 | Cubic Metre |
| 110 | 110 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make110 | 32.43 | Cubic Metre |
| 111 | 111 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make111 | 53.28 | Cubic Metre |
| 112 | 112 | Vibrated Cement Concrete of Grade M20 1:1.5:3 Nominal mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for retaining wall - below sill level | Item Code / Make112 | ||
| 113 | 113 | Construction of Retaining wall at km 4/4 of Cheranmahadevi River Road | Item Code / Make113 | 123.9 | Cubic Metre |
| 114 | 114 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make114 | 182.7 | Cubic Metre |
| 115 | 115 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make115 | 140.4 | Cubic Metre |
| 116 | 116 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make116 | 20.73 | Cubic Metre |
| 117 | 117 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make117 | 69.26 | Cubic Metre |
| 118 | 118 | Vibrated Cement Concrete of Grade M20 1:1.5:3 Nominal mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for retaining wall - above sill level | Item Code / Make118 | ||
| 119 | 119 | Construction of Retaining wall at km 4/4 of Cheranmahadevi River Road | Item Code / Make119 | 147 | Cubic Metre |
| 120 | 120 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make120 | 259.91 | Cubic Metre |
| 121 | 121 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make121 | 173.25 | Cubic Metre |
| 122 | 122 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make122 | 40.89 | Cubic Metre |
| 123 | 123 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make123 | 85.47 | Cubic Metre |
| 124 | 124 | Filling with clean good gritty gravel including cost and conveyance to site including labour charges for filling in layers, watering, tamping under optimum moisture content to get the maximum density all incidental charges etc., complete as per MORTH Rev.V Clause No.304 (deducting excavated earth for foundation) | Item Code / Make124 | ||
| 125 | 125 | Construction of Retaining wall at km 4/4 of Cheranmahadevi River Road | Item Code / Make125 | 307 | Cubic Metre |
| 126 | 126 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make126 | 121.8 | Cubic Metre |
| 127 | 127 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make127 | 24 | Cubic Metre |
| 128 | 128 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make128 | 28.86 | Cubic Metre |
| 129 | 129 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make129 | 11.84 | Cubic Metre |
| 130 | 130 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials tool and equipments and all other incidental charges such as baling our water,sheeting, shoring, bracing and their subsequent removal, removal and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., indicated by the Engineer for Foundation of Abutments and piers | Item Code / Make130 | ||
| 131 | 131 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make131 | 148 | Cubic Metre |
| 132 | 132 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make132 | 56 | Cubic Metre |
| 133 | 133 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make133 | 153 | Cubic Metre |
| 134 | 134 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make134 | 56 | Cubic Metre |
| 135 | 135 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make135 | 56 | Cubic Metre |
| 136 | 136 | Plain Cement concrete M15 Grade (Nominal Mix 1:2:4) using 40 mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for laying, compacting, curing, and all incidental charges etc., complete for Leveling Course Box Culvert and Wing wall | Item Code / Make136 | ||
| 137 | 137 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make137 | 8 | Cubic Metre |
| 138 | 138 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make138 | 5 | Cubic Metre |
| 139 | 139 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make139 | 8 | Cubic Metre |
| 140 | 140 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make140 | 5 | Cubic Metre |
| 141 | 141 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make141 | 5 | Cubic Metre |
| 142 | 142 | Vibrated Reinforced Cement Concrete of Grade M25Design mix using 20mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost and fabrication of steel and cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for Box culvert | Item Code / Make142 | ||
| 143 | 143 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make143 | 29 | Cubic Metre |
| 144 | 144 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make144 | 17 | Cubic Metre |
| 145 | 145 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make145 | 33 | Cubic Metre |
| 146 | 146 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make146 | 17 | Cubic Metre |
| 147 | 147 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make147 | 17 | Cubic Metre |
| 148 | 148 | Dismantling Culvert and other structures \nDismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc., as per MORTH Rev, V Clause No.111, 112 & 202. \na) Dismantling existing RR Masonry. | Item Code / Make148 | ||
| 149 | 149 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make149 | 22.44 | Cubic Metre |
| 150 | 150 | Removal of cutstone slab with a lead of 1000 metre stacking serviceable and unserviceable materials separately ats per MORT&H specification 202 etc., complete as per specification No.111, 112, 202 MORT&H IVth Revision. | Item Code / Make150 | ||
| 151 | 151 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make151 | 35 | Square Metre |
| 152 | 152 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials tool and equipments and all other incidental charges such as baling our water,sheeting, shoring, bracing and their subsequent removal, removal and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., indicated by the Engineer as per DRESSING THE BED UPTO SILL LEVEL | Item Code / Make152 | ||
| 153 | 153 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make153 | 59.66 | Cubic Metre |
| 154 | 154 | Earthwork excavation in all classes of soils weathered rock, soft rock, SDR, rock without blasting and depositing on bank, with all leads and lifts as per SS 20B, including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams sheting, shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifation for Foundation | Item Code / Make154 | ||
| 155 | 155 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make155 | 191.84 | Cubic Metre |
| 156 | 156 | Vibrated Cement concrete M10 Grade (Nominal Mix 1:3:6) using 40 mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for laying, compacting, curing, and all incidental charges etc., complete for Leveling Course | Item Code / Make156 | ||
| 157 | 157 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make157 | 12.38 | Cubic Metre |
| 158 | 158 | Vibrated Cement Concrete of Grade M20 1:1:5:3 Nominal Mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for Below sill level. | Item Code / Make158 | ||
| 159 | 159 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make159 | 126.23 | Cubic Metre |
| 160 | 160 | Vibrated Cement Concrete of Grade M20 1:1:5:3 Nominal mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for Body wall (Above sill level). | Item Code / Make160 | ||
| 161 | 161 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make161 | 49.59 | Cubic Metre |
| 162 | 162 | Vibrated Reinforced Cement Concrete of Grade M30 Design mix using 20mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost and fabrication of steel and cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for DIRT WALL CUM BED BLOCK | Item Code / Make162 | ||
| 163 | 163 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make163 | 4.32 | Cubic Metre |
| 164 | 164 | Providing and fixing PVC seepage pipes of 110mm dia 6kg/sqm of required lengths for abutments and wings including cost and conveyance of all materials to worksite and labour for 900mm dia semipherical backfill arrangements with 100cm size broken granite chips at the periphery and labour charges for fixing etc., complete to drain the backfill. | Item Code / Make164 | ||
| 165 | 165 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make165 | 30 | Running Metre |
| 166 | 166 | Providing and Fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to work site labour for fixing the same in correct position and all other incidental charges etc., complete as per MORTH Rev. V Clause No. 2600. | Item Code / Make166 | ||
| 167 | 167 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make167 | 8.86 | Square Metre |
| 168 | 168 | Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule and cost of TOR steel conforming to IS:1786 at site, including fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, including overlapping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings,including cost of binding wire, provision of spacer bars, cover blocks and all other incidential charges etc., complete as per standard specifications Slab culvert. Fe-500 Grade as per MORTH Rev. V Clause No. 1900. | Item Code / Make168 | ||
| 169 | 169 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make169 | 4.36 | Metric Tonne |
| 170 | 170 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make170 | 2.2 | Cubic Metre |
| 171 | 171 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make171 | 1.5 | Cubic Metre |
| 172 | 172 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make172 | 2.4 | Cubic Metre |
| 173 | 173 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make173 | 1.5 | Cubic Metre |
| 174 | 174 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make174 | 1.5 | Cubic Metre |
| 175 | 175 | Providing and fixing Bitumen Felt Expansion Joints including cost and conveyance of expansion joints, shamiler pad and joint sealants and fixing them in position etc., complete in deck slab over abutment and pier as per MORTH Rev. V Clause No. 2600. | Item Code / Make175 | ||
| 176 | 176 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make176 | 2.79 | Square Metre |
| 177 | 177 | Providing and fixing of GI drainage spouts 100mm dia as per GOI drawig SD / 205th grating arrangements at top as shown in the drawing and 100mm dia drainage spouts projecting atleast 300mm beyond the bottom of Deck slab as shown in the drawing including cost and conveyance of Galvanized Iron pipes and flats and fixing them in position etc., complete | Item Code / Make177 | ||
| 178 | 178 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make178 | 2 | Nos |
| 179 | 179 | Vibrated Reinforced Cement Concrete of Grade M30 Design mix using 20mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost and fabrication of steel and cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for DECK SLAB | Item Code / Make179 | ||
| 180 | 180 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make180 | 36.08 | Cubic Metre |
| 181 | 181 | Vibrated Cement Concrete of Grade M15 1:2:4 Nominal Mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for Base Course below approach slab | Item Code / Make181 | ||
| 182 | 182 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make182 | 8.64 | Cubic Metre |
| 183 | 183 | Vibrated Reinforced Cement Concrete of Grade M30 Design mix using 20mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost and fabrication of steel and cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for APPROACH SLAB | Item Code / Make183 | ||
| 184 | 184 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make184 | 22.05 | Cubic Metre |
| 185 | 185 | Gravel Filling behind the Abutments and Wings with clean good gritty gravel including cost and conveyance to site including labour charges for filling in layers, watering tamping under optimum moisture content to get the maximum density including watering, with all leads for Filling, Laying & Tamping charges etc., complete behind abutments and wings. | Item Code / Make185 | ||
| 186 | 186 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make186 | 90.24 | Cubic Metre |
| 187 | 187 | Vibrated Cement Concrete of Grade M20 1:1.5:3 Nominal mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for PCC Parapet | Item Code / Make187 | ||
| 188 | 188 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make188 | 3.33 | Cubic Metre |
| 189 | 189 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make189 | 44 | Cubic Metre |
| 190 | 190 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make190 | 17 | Cubic Metre |
| 191 | 191 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make191 | 44 | Cubic Metre |
| 192 | 192 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make192 | 17 | Cubic Metre |
| 193 | 193 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make193 | 17 | Cubic Metre |
| 194 | 194 | Vibrated Cement Concrete of M30 Grade design mix using ISS graded hard granite broken metal including cost and conveyance of all materials to site including cost of cement at site, cost of formwork, soft water, labour charges for mixing, transporting, laying and curing of concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for wearing coat of 75mm uniform thickness over deck slab | Item Code / Make194 | ||
| 195 | 195 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make195 | 129.6 | Square Metre |
| 196 | 196 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials tool and equipments and all other incidental charges such as baling our water,sheeting, shoring, bracing and their subsequent removal, removal and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DIVERSION ROAD. | Item Code / Make196 | ||
| 197 | 197 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make197 | 90 | Cubic Metre |
| 198 | 198 | Providing and laying and Compacting Well gravel including cost and conveyance to work site laying handling charges for filling in layers, rolling including watering with all leads for water and all other incidental charges etc., complete for Diversion road | Item Code / Make198 | ||
| 199 | 199 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make199 | 45 | Cubic Metre |
| 200 | 200 | Supplying and fixing of RCC NP3 ISI clause pipes and collars of 1000mm dia of standard length including cost and conveyance to the worksite and all other incidental charges etc., complete for Diversion road | Item Code / Make200 | ||
| 201 | 201 | Reconstruction of Culvert at km 1/2 of Venkatrengapuram Road | Item Code / Make201 | 10 | Running Metre |
| 202 | 202 | SUB - ESTIMATE | Item Code / Make202 | ||
| 203 | 203 | Sub - Estimate for Upkeeping | Item Code / Make203 | ||
| 204 | 204 | Clearing the Light jungles including weeding out shrubs, bushes, vegetable growth, etc. as per specifications & directions of Engineer-in-charge | Item Code / Make204 | ||
| 205 | 205 | I Year | Item Code / Make205 | ||
| 206 | 206 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make206 | 1572 | Cubic Metre |
| 207 | 207 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make207 | 1212 | Cubic Metre |
| 208 | 208 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make208 | 1356 | Cubic Metre |
| 209 | 209 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make209 | 1680 | Cubic Metre |
| 210 | 210 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make210 | 2202 | Cubic Metre |
| 211 | 211 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make211 | 1044 | Cubic Metre |
| 212 | 212 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make212 | 720 | Cubic Metre |
| 213 | 213 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make213 | 960 | Cubic Metre |
| 214 | 214 | II Year | Item Code / Make214 | ||
| 215 | 215 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make215 | 1572 | Cubic Metre |
| 216 | 216 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make216 | 1212 | Cubic Metre |
| 217 | 217 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make217 | 1356 | Cubic Metre |
| 218 | 218 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make218 | 1680 | Cubic Metre |
| 219 | 219 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make219 | 2202 | Cubic Metre |
| 220 | 220 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make220 | 1044 | Cubic Metre |
| 221 | 221 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make221 | 720 | Cubic Metre |
| 222 | 222 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make222 | 960 | Cubic Metre |
| 223 | 223 | III Year | Item Code / Make223 | ||
| 224 | 224 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make224 | 1572 | Cubic Metre |
| 225 | 225 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make225 | 1212 | Cubic Metre |
| 226 | 226 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make226 | 1356 | Cubic Metre |
| 227 | 227 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make227 | 1680 | Cubic Metre |
| 228 | 228 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make228 | 2202 | Cubic Metre |
| 229 | 229 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make229 | 1044 | Cubic Metre |
| 230 | 230 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make230 | 720 | Cubic Metre |
| 231 | 231 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make231 | 960 | Cubic Metre |
| 232 | 232 | IV Year | Item Code / Make232 | ||
| 233 | 233 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make233 | 1572 | Cubic Metre |
| 234 | 234 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make234 | 1212 | Cubic Metre |
| 235 | 235 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make235 | 1356 | Cubic Metre |
| 236 | 236 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make236 | 1680 | Cubic Metre |
| 237 | 237 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make237 | 2202 | Cubic Metre |
| 238 | 238 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make238 | 1044 | Cubic Metre |
| 239 | 239 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make239 | 720 | Cubic Metre |
| 240 | 240 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make240 | 960 | Cubic Metre |
| 241 | 241 | V Year | Item Code / Make241 | ||
| 242 | 242 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make242 | 1572 | Cubic Metre |
| 243 | 243 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make243 | 1212 | Cubic Metre |
| 244 | 244 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make244 | 1356 | Cubic Metre |
| 245 | 245 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make245 | 1680 | Cubic Metre |
| 246 | 246 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make246 | 2202 | Cubic Metre |
| 247 | 247 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make247 | 1044 | Cubic Metre |
| 248 | 248 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make248 | 720 | Cubic Metre |
| 249 | 249 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make249 | 960 | Cubic Metre |
| 250 | 250 | Forming and raising the Berms with side earth with side earth with a lead of 1 km from the approved source to work site including cost of earth, conveyance charges and filling levelling to the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for making up the berms as directed by the dept. officers as per MORT&H Rev. V specifications No. 100, 111, 112, 202, 301, to 305, 900 | Item Code / Make250 | ||
| 251 | 251 | I Year | Item Code / Make251 | ||
| 252 | 252 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make252 | 168 | Cubic Metre |
| 253 | 253 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make253 | 141.48 | Cubic Metre |
| 254 | 254 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make254 | 129.6 | Cubic Metre |
| 255 | 255 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make255 | 84 | Cubic Metre |
| 256 | 256 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make256 | 134.7 | Cubic Metre |
| 257 | 257 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make257 | 52.2 | Cubic Metre |
| 258 | 258 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make258 | 36 | Cubic Metre |
| 259 | 259 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make259 | 48 | Cubic Metre |
| 260 | 260 | II Year | Item Code / Make260 | ||
| 261 | 261 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make261 | 168 | Cubic Metre |
| 262 | 262 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make262 | 141.48 | Cubic Metre |
| 263 | 263 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make263 | 129.6 | Cubic Metre |
| 264 | 264 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make264 | 84 | Cubic Metre |
| 265 | 265 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make265 | 134.7 | Cubic Metre |
| 266 | 266 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make266 | 52.2 | Cubic Metre |
| 267 | 267 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make267 | 36 | Cubic Metre |
| 268 | 268 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make268 | 48 | Cubic Metre |
| 269 | 269 | III Year | Item Code / Make269 | ||
| 270 | 270 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make270 | 168 | Cubic Metre |
| 271 | 271 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make271 | 141.48 | Cubic Metre |
| 272 | 272 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make272 | 129.6 | Cubic Metre |
| 273 | 273 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make273 | 84 | Cubic Metre |
| 274 | 274 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make274 | 134.7 | Cubic Metre |
| 275 | 275 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make275 | 52.2 | Cubic Metre |
| 276 | 276 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make276 | 36 | Cubic Metre |
| 277 | 277 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make277 | 48 | Cubic Metre |
| 278 | 278 | IV Year | Item Code / Make278 | ||
| 279 | 279 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make279 | 168 | Cubic Metre |
| 280 | 280 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make280 | 141.48 | Cubic Metre |
| 281 | 281 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make281 | 129.6 | Cubic Metre |
| 282 | 282 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make282 | 84 | Cubic Metre |
| 283 | 283 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make283 | 134.7 | Cubic Metre |
| 284 | 284 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make284 | 52.2 | Cubic Metre |
| 285 | 285 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make285 | 36 | Cubic Metre |
| 286 | 286 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make286 | 48 | Cubic Metre |
| 287 | 287 | V Year | Item Code / Make287 | ||
| 288 | 288 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make288 | 168 | Cubic Metre |
| 289 | 289 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make289 | 141.48 | Cubic Metre |
| 290 | 290 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make290 | 129.6 | Cubic Metre |
| 291 | 291 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make291 | 84 | Cubic Metre |
| 292 | 292 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make292 | 134.7 | Cubic Metre |
| 293 | 293 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make293 | 52.2 | Cubic Metre |
| 294 | 294 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make294 | 36 | Cubic Metre |
| 295 | 295 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make295 | 48 | Cubic Metre |
| 296 | 296 | Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer for Clearing the vent way of CD works as per MORT&H Rev. V specifications No. 100, 111, 112, 301 to 305 (One time per year) | Item Code / Make296 | ||
| 297 | 297 | I Year | Item Code / Make297 | ||
| 298 | 298 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make298 | 6 | Hours |
| 299 | 299 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make299 | 10 | Hours |
| 300 | 300 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make300 | 8 | Hours |
| 301 | 301 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make301 | 4 | Hours |
| 302 | 302 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make302 | 12 | Hours |
| 303 | 303 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make303 | 8 | Hours |
| 304 | 304 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make304 | 4 | Hours |
| 305 | 305 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make305 | 4 | Hours |
| 306 | 306 | II Year | Item Code / Make306 | ||
| 307 | 307 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make307 | 6 | Hours |
| 308 | 308 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make308 | 10 | Hours |
| 309 | 309 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make309 | 8 | Hours |
| 310 | 310 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make310 | 4 | Hours |
| 311 | 311 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make311 | 12 | Hours |
| 312 | 312 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make312 | 8 | Hours |
| 313 | 313 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make313 | 4 | Hours |
| 314 | 314 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make314 | 4 | Hours |
| 315 | 315 | III Year | Item Code / Make315 | ||
| 316 | 316 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make316 | 6 | Hours |
| 317 | 317 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make317 | 10 | Hours |
| 318 | 318 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make318 | 8 | Hours |
| 319 | 319 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make319 | 4 | Hours |
| 320 | 320 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make320 | 12 | Hours |
| 321 | 321 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make321 | 8 | Hours |
| 322 | 322 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make322 | 4 | Hours |
| 323 | 323 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make323 | 4 | Hours |
| 324 | 324 | IV Year | Item Code / Make324 | ||
| 325 | 325 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make325 | 6 | Hours |
| 326 | 326 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make326 | 10 | Hours |
| 327 | 327 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make327 | 8 | Hours |
| 328 | 328 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make328 | 4 | Hours |
| 329 | 329 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make329 | 12 | Hours |
| 330 | 330 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make330 | 8 | Hours |
| 331 | 331 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make331 | 4 | Hours |
| 332 | 332 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make332 | 4 | Hours |
| 333 | 333 | V Year | Item Code / Make333 | ||
| 334 | 334 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make334 | 6 | Hours |
| 335 | 335 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make335 | 10 | Hours |
| 336 | 336 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make336 | 8 | Hours |
| 337 | 337 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make337 | 4 | Hours |
| 338 | 338 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make338 | 12 | Hours |
| 339 | 339 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make339 | 8 | Hours |
| 340 | 340 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make340 | 4 | Hours |
| 341 | 341 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make341 | 4 | Hours |
| 342 | 342 | Painting the existing KM stone as per IRC standard including the cost of labour charges and Materials etc., complete | Item Code / Make342 | ||
| 343 | 343 | I Year | Item Code / Make343 | ||
| 344 | 344 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make344 | 1 | Nos |
| 345 | 345 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make345 | 1 | Nos |
| 346 | 346 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make346 | 1 | Nos |
| 347 | 347 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make347 | 1 | Nos |
| 348 | 348 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make348 | 2 | Nos |
| 349 | 349 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make349 | 1 | Nos |
| 350 | 350 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make350 | 1 | Nos |
| 351 | 351 | II Year | Item Code / Make351 | ||
| 352 | 352 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make352 | 1 | Nos |
| 353 | 353 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make353 | 1 | Nos |
| 354 | 354 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make354 | 1 | Nos |
| 355 | 355 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make355 | 1 | Nos |
| 356 | 356 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make356 | 2 | Nos |
| 357 | 357 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make357 | 1 | Nos |
| 358 | 358 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make358 | 1 | Nos |
| 359 | 359 | III Year | Item Code / Make359 | ||
| 360 | 360 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make360 | 1 | Nos |
| 361 | 361 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make361 | 1 | Nos |
| 362 | 362 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make362 | 1 | Nos |
| 363 | 363 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make363 | 1 | Nos |
| 364 | 364 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make364 | 2 | Nos |
| 365 | 365 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make365 | 1 | Nos |
| 366 | 366 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make366 | 1 | Nos |
| 367 | 367 | IV Year | Item Code / Make367 | ||
| 368 | 368 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make368 | 1 | Nos |
| 369 | 369 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make369 | 1 | Nos |
| 370 | 370 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make370 | 1 | Nos |
| 371 | 371 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make371 | 1 | Nos |
| 372 | 372 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make372 | 2 | Nos |
| 373 | 373 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make373 | 1 | Nos |
| 374 | 374 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make374 | 1 | Nos |
| 375 | 375 | V Year | Item Code / Make375 | ||
| 376 | 376 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make376 | 1 | Nos |
| 377 | 377 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make377 | 1 | Nos |
| 378 | 378 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make378 | 1 | Nos |
| 379 | 379 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make379 | 1 | Nos |
| 380 | 380 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make380 | 2 | Nos |
| 381 | 381 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make381 | 1 | Nos |
| 382 | 382 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make382 | 1 | Nos |
| 383 | 383 | Painting the existing HM stone as per IRC standard including the cost of labour charges and Materials etc., complete | Item Code / Make383 | ||
| 384 | 384 | I Year | Item Code / Make384 | ||
| 385 | 385 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make385 | 6 | Nos |
| 386 | 386 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make386 | 7 | Nos |
| 387 | 387 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make387 | 5 | Nos |
| 388 | 388 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make388 | 5 | Nos |
| 389 | 389 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make389 | 10 | Nos |
| 390 | 390 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make390 | 5 | Nos |
| 391 | 391 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make391 | 4 | Nos |
| 392 | 392 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make392 | 3 | Nos |
| 393 | 393 | II Year | Item Code / Make393 | ||
| 394 | 394 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make394 | 6 | Nos |
| 395 | 395 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make395 | 7 | Nos |
| 396 | 396 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make396 | 5 | Nos |
| 397 | 397 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make397 | 5 | Nos |
| 398 | 398 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make398 | 10 | Nos |
| 399 | 399 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make399 | 5 | Nos |
| 400 | 400 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make400 | 4 | Nos |
| 401 | 401 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make401 | 3 | Nos |
| 402 | 402 | III Year | Item Code / Make402 | ||
| 403 | 403 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make403 | 6 | Nos |
| 404 | 404 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make404 | 7 | Nos |
| 405 | 405 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make405 | 5 | Nos |
| 406 | 406 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make406 | 5 | Nos |
| 407 | 407 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make407 | 10 | Nos |
| 408 | 408 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make408 | 5 | Nos |
| 409 | 409 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make409 | 4 | Nos |
| 410 | 410 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make410 | 3 | Nos |
| 411 | 411 | IV Year | Item Code / Make411 | ||
| 412 | 412 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make412 | 6 | Nos |
| 413 | 413 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make413 | 7 | Nos |
| 414 | 414 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make414 | 5 | Nos |
| 415 | 415 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make415 | 5 | Nos |
| 416 | 416 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make416 | 10 | Nos |
| 417 | 417 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make417 | 5 | Nos |
| 418 | 418 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make418 | 4 | Nos |
| 419 | 419 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make419 | 3 | Nos |
| 420 | 420 | V Year | Item Code / Make420 | ||
| 421 | 421 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make421 | 6 | Nos |
| 422 | 422 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make422 | 7 | Nos |
| 423 | 423 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make423 | 5 | Nos |
| 424 | 424 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make424 | 5 | Nos |
| 425 | 425 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make425 | 10 | Nos |
| 426 | 426 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make426 | 5 | Nos |
| 427 | 427 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make427 | 4 | Nos |
| 428 | 428 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make428 | 3 | Nos |
| 429 | 429 | Lettering the existing KM stone as per IRC standard including the cost of labour charges and Materials etc., complete., | Item Code / Make429 | ||
| 430 | 430 | I Year | Item Code / Make430 | ||
| 431 | 431 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make431 | 1 | Nos |
| 432 | 432 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make432 | 1 | Nos |
| 433 | 433 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make433 | 1 | Nos |
| 434 | 434 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make434 | 1 | Nos |
| 435 | 435 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make435 | 2 | Nos |
| 436 | 436 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make436 | 1 | Nos |
| 437 | 437 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make437 | 1 | Nos |
| 438 | 438 | II Year | Item Code / Make438 | ||
| 439 | 439 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make439 | 1 | Nos |
| 440 | 440 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make440 | 1 | Nos |
| 441 | 441 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make441 | 1 | Nos |
| 442 | 442 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make442 | 1 | Nos |
| 443 | 443 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make443 | 2 | Nos |
| 444 | 444 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make444 | 1 | Nos |
| 445 | 445 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make445 | 1 | Nos |
| 446 | 446 | III Year | Item Code / Make446 | ||
| 447 | 447 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make447 | 1 | Nos |
| 448 | 448 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make448 | 1 | Nos |
| 449 | 449 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make449 | 1 | Nos |
| 450 | 450 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make450 | 1 | Nos |
| 451 | 451 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make451 | 2 | Nos |
| 452 | 452 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make452 | 1 | Nos |
| 453 | 453 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make453 | 1 | Nos |
| 454 | 454 | IV Year | Item Code / Make454 | ||
| 455 | 455 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make455 | 1 | Nos |
| 456 | 456 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make456 | 1 | Nos |
| 457 | 457 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make457 | 1 | Nos |
| 458 | 458 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make458 | 1 | Nos |
| 459 | 459 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make459 | 2 | Nos |
| 460 | 460 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make460 | 1 | Nos |
| 461 | 461 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make461 | 1 | Nos |
| 462 | 462 | V Year | Item Code / Make462 | ||
| 463 | 463 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make463 | 1 | Nos |
| 464 | 464 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make464 | 1 | Nos |
| 465 | 465 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make465 | 1 | Nos |
| 466 | 466 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make466 | 1 | Nos |
| 467 | 467 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make467 | 2 | Nos |
| 468 | 468 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make468 | 1 | Nos |
| 469 | 469 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make469 | 1 | Nos |
| 470 | 470 | Lettering the existing HM stone as per IRC standard including the cost of labour charges and Materials etc., complete., | Item Code / Make470 | ||
| 471 | 471 | I Year | Item Code / Make471 | ||
| 472 | 472 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make472 | 6 | Nos |
| 473 | 473 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make473 | 7 | Nos |
| 474 | 474 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make474 | 5 | Nos |
| 475 | 475 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make475 | 5 | Nos |
| 476 | 476 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make476 | 10 | Nos |
| 477 | 477 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make477 | 5 | Nos |
| 478 | 478 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make478 | 4 | Nos |
| 479 | 479 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make479 | 3 | Nos |
| 480 | 480 | II Year | Item Code / Make480 | ||
| 481 | 481 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make481 | 6 | Nos |
| 482 | 482 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make482 | 7 | Nos |
| 483 | 483 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make483 | 5 | Nos |
| 484 | 484 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make484 | 5 | Nos |
| 485 | 485 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make485 | 10 | Nos |
| 486 | 486 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make486 | 5 | Nos |
| 487 | 487 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make487 | 4 | Nos |
| 488 | 488 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make488 | 3 | Nos |
| 489 | 489 | III Year | Item Code / Make489 | ||
| 490 | 490 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make490 | 6 | Nos |
| 491 | 491 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make491 | 7 | Nos |
| 492 | 492 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make492 | 5 | Nos |
| 493 | 493 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make493 | 5 | Nos |
| 494 | 494 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make494 | 10 | Nos |
| 495 | 495 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make495 | 5 | Nos |
| 496 | 496 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make496 | 4 | Nos |
| 497 | 497 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make497 | 3 | Nos |
| 498 | 498 | IV Year | Item Code / Make498 | ||
| 499 | 499 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make499 | 6 | Nos |
| 500 | 500 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make500 | 7 | Nos |
| 501 | 501 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make501 | 5 | Nos |
| 502 | 502 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make502 | 5 | Nos |
| 503 | 503 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make503 | 10 | Nos |
| 504 | 504 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make504 | 5 | Nos |
| 505 | 505 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make505 | 4 | Nos |
| 506 | 506 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make506 | 3 | Nos |
| 507 | 507 | V Year | Item Code / Make507 | ||
| 508 | 508 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make508 | 6 | Nos |
| 509 | 509 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make509 | 7 | Nos |
| 510 | 510 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make510 | 5 | Nos |
| 511 | 511 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make511 | 5 | Nos |
| 512 | 512 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make512 | 10 | Nos |
| 513 | 513 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make513 | 5 | Nos |
| 514 | 514 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make514 | 4 | Nos |
| 515 | 515 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make515 | 3 | Nos |
| 516 | 516 | White washing over the existing Culverts, parapets, avenues and Guide post including cost of Materials and Labour charges etc., complete | Item Code / Make516 | ||
| 517 | 517 | I Year | Item Code / Make517 | ||
| 518 | 518 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make518 | 18.7 | Square Metre |
| 519 | 519 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make519 | 35.7 | Square Metre |
| 520 | 520 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make520 | 19.6 | Square Metre |
| 521 | 521 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make521 | 6.24 | Square Metre |
| 522 | 522 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make522 | 25.8 | Square Metre |
| 523 | 523 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make523 | 28.12 | Square Metre |
| 524 | 524 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make524 | 20.36 | Square Metre |
| 525 | 525 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make525 | 108 | Square Metre |
| 526 | 526 | II Year | Item Code / Make526 | ||
| 527 | 527 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make527 | 18.7 | Square Metre |
| 528 | 528 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make528 | 35.7 | Square Metre |
| 529 | 529 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make529 | 19.6 | Square Metre |
| 530 | 530 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make530 | 6.24 | Square Metre |
| 531 | 531 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make531 | 25.8 | Square Metre |
| 532 | 532 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make532 | 28.12 | Square Metre |
| 533 | 533 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make533 | 20.36 | Square Metre |
| 534 | 534 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make534 | 108 | Square Metre |
| 535 | 535 | III Year | Item Code / Make535 | ||
| 536 | 536 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make536 | 18.7 | Square Metre |
| 537 | 537 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make537 | 35.7 | Square Metre |
| 538 | 538 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make538 | 19.6 | Square Metre |
| 539 | 539 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make539 | 6.24 | Square Metre |
| 540 | 540 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make540 | 25.8 | Square Metre |
| 541 | 541 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make541 | 28.12 | Square Metre |
| 542 | 542 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make542 | 20.36 | Square Metre |
| 543 | 543 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make543 | 108 | Square Metre |
| 544 | 544 | IV Year | Item Code / Make544 | ||
| 545 | 545 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make545 | 18.7 | Square Metre |
| 546 | 546 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make546 | 35.7 | Square Metre |
| 547 | 547 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make547 | 19.6 | Square Metre |
| 548 | 548 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make548 | 6.24 | Square Metre |
| 549 | 549 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make549 | 25.8 | Square Metre |
| 550 | 550 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make550 | 28.12 | Square Metre |
| 551 | 551 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make551 | 20.36 | Square Metre |
| 552 | 552 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make552 | 108 | Square Metre |
| 553 | 553 | V Year | Item Code / Make553 | ||
| 554 | 554 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make554 | 18.7 | Square Metre |
| 555 | 555 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make555 | 35.7 | Square Metre |
| 556 | 556 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make556 | 19.6 | Square Metre |
| 557 | 557 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make557 | 6.24 | Square Metre |
| 558 | 558 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make558 | 25.8 | Square Metre |
| 559 | 559 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make559 | 28.12 | Square Metre |
| 560 | 560 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make560 | 20.36 | Square Metre |
| 561 | 561 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make561 | 108 | Square Metre |
| 562 | 562 | Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces as per MORTH Rev. V Clause No. 111, 112, 503 & 900. | Item Code / Make562 | ||
| 563 | 563 | IV Year | Item Code / Make563 | ||
| 564 | 564 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make564 | 231 | Square Metre |
| 565 | 565 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make565 | 181.99 | Square Metre |
| 566 | 566 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make566 | 197.87 | Square Metre |
| 567 | 567 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make567 | 255.9 | Square Metre |
| 568 | 568 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make568 | 292.5 | Square Metre |
| 569 | 569 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make569 | 255.9 | Square Metre |
| 570 | 570 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make570 | 170.4 | Square Metre |
| 571 | 571 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make571 | 90 | Square Metre |
| 572 | 572 | V Year | Item Code / Make572 | ||
| 573 | 573 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make573 | 385 | Square Metre |
| 574 | 574 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make574 | 303.32 | Square Metre |
| 575 | 575 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make575 | 329.78 | Square Metre |
| 576 | 576 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make576 | 426.5 | Square Metre |
| 577 | 577 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make577 | 487.5 | Square Metre |
| 578 | 578 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make578 | 426.5 | Square Metre |
| 579 | 579 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make579 | 284 | Square Metre |
| 580 | 580 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make580 | 150 | Square Metre |
| 581 | 581 | Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II as per MORTH Rev. V Clause No. 111, 112, 501, 507 & 900. | Item Code / Make581 | ||
| 582 | 582 | IV Year | Item Code / Make582 | ||
| 583 | 583 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make583 | 6.93 | Cubic Metre |
| 584 | 584 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make584 | 5.46 | Cubic Metre |
| 585 | 585 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make585 | 5.94 | Cubic Metre |
| 586 | 586 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make586 | 7.68 | Cubic Metre |
| 587 | 587 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make587 | 8.78 | Cubic Metre |
| 588 | 588 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make588 | 7.68 | Cubic Metre |
| 589 | 589 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make589 | 5.11 | Cubic Metre |
| 590 | 590 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make590 | 2.7 | Cubic Metre |
| 591 | 591 | V Year | Item Code / Make591 | ||
| 592 | 592 | Widening from Single lane to Intermediate lane and Improvements of Melathidiyur - Suthamalli Road at km 0/0 - 1/4 including construction of retaining wall including upkeeping for a period of 60 months | Item Code / Make592 | 11.55 | Cubic Metre |
| 593 | 593 | Improvements of Valuthur - Sengulam Road at km 0/0 - 1/6 including CD works and paver block including upkeeping for a period of 60 months | Item Code / Make593 | 9.1 | Cubic Metre |
| 594 | 594 | Widening from Single lane to Intermediate lane and Improvements of Gopalasamudram Road at km 2/0 - 3/2 including upkeeping for a period of 60 months | Item Code / Make594 | 9.89 | Cubic Metre |
| 595 | 595 | Improvements to Riding Quality at km 0/0 - 1/4 of Veeravanallur - Pudur Road including upkeeping for a period of 60 months | Item Code / Make595 | 12.8 | Cubic Metre |
| 596 | 596 | Improvements to Riding Quality at km 0/0 - 2/6 of Kaniyankudiyiruppu Road including upkeeping for a period of 60 months | Item Code / Make596 | 14.63 | Cubic Metre |
| 597 | 597 | Improvements to Riding Quality at km 0/0 - 1/2 of Veeravanallur - Thiruppudaimaruthur Road including upkeeping for a period of 60 months | Item Code / Make597 | 12.8 | Cubic Metre |
| 598 | 598 | Improvements to Riding Quality at km 0/0 - 0/8 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make598 | 8.52 | Cubic Metre |
| 599 | 599 | Improvements to Riding Quality at km 0/8 - 1/6 of Veeravanallur - Giriammalpuram Road including upkeeping for a period of 60 months | Item Code / Make599 | 4.5 | Cubic Metre |
| 600 | 600 | Calculation of SubTotal, GST and Total Amount carried out by system automatically | |||
| 601 | 601 | Basic cost of value put to tender as per estimate | 1 | (A) | |
| 602 | 602 | Add GST at 12% | 1 | (B) | |
| 603 | 603 | Total Value put to Tender | 1 | (A+B) | |
| 604 | 604 | Negotiated Percentage | 1 | (D) | |
| 605 | 605 | Final Negotiated Value | 1 | (E) | |
| 606 | 606 | Add GST at 12% of Final Negotiated Value | 1 | (F) | |
| 607 | 607 | Total Value of Contract Including 12% of GST | 1 | (E+F) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender