| 1 | 1 | Servicing and maintanance of Split AC 1.5/2.0 ton capacity complete indoor/outdoor unit for routine check up for smoth functioning checking of refrigerant gas, gas leakage, cheking the functioning of compressor, blower motor, all electrical/electronic circuit, functioning of remote, functioning cooling system, cleaning and washing by using liquid of air filters, cooling coil, condensor coil, blower motor, fan motor complete indoor/outdoor unit all as directed by Engr-in-charge. NOTE Spares required will be measured and paid separately | | 10 | Each Job |
|---|
| 2 | 2 | Taking out existing burnt / unserviceable compressor unit from 1.5 ton capacity of window/split type air conditioner and replacing the same with factory built hermetically sealed rotary compressor unit including necessary accessories and mounting materials, welding, leak testing by charging with CO2/dry nitrogen gas. Evacuating the system and charging of R-22 Refrigerant gas after ensure leak proof condition and testing complete all as directed by Engineer-in-Charge etc. of make - Godrej/Techmesh/Blue star/Hitachi. Note - Refrigerant gas shall be measured and paid separately. | | 6 | Each Job |
|---|
| 3 | 3 | All as per item No 2 here-in- before but of capacity 2.0 ton | | 4 | Each Job |
|---|
| 4 | 4 | Taking Down of existing damaged / burnt blower motor from split/window AC and supply & fixing of new blower motor with capacitor & mounting materials single phase, 230 Volts 50 Hz suitable for 1.5 ton & 2 ton capacity of window/Split type AC | | 4 | Each Job |
|---|
| 5 | 5 | Taking Down of existing damaged / oudoor fan motor from split/window AC and replace the burnt unserviceable parts,rewinding , refixing the same after repair and testing its proper function all as directed by Engr -In - Charge | | 3 | Each Job |
|---|
| 6 | 6 | Taking out the defective thermo static switch, supply and fix new thermostatic switch for 1.5/2 ton window/split type AC | | 6 | Each Job |
|---|
| 7 | 7 | Taking out the defective over load protector relay, supply and fix new over load protector for1.5 ton window/split type AC | | 8 | Each Job |
|---|
| 8 | 8 | Taking out the defective starting relay, supply and fix new starting relay for 1.5 ton window type AC | | 8 | Each Job |
|---|
| 9 | 9 | Taking out the existing defective starting capacitor, supply and fix new starting capacitor suitable for 1.5 ton & 2 ton window/split type AC. | | 20 | Each Job |
|---|
| 10 | 10 | Taking out the faulty selector switch, supply and fix new selector switch for 1.5 ton window type AC. | | 3 | Each Job |
|---|
| 11 | 11 | Taking out the unserviceable running capacitor, supply and fix new running capacitor suitable for 1.5/2.0 ton window/split type AC | | 12 | Each Job |
|---|
| 12 | 12 | M&L for charging of refrigerant R-22 including cost of leak detection, welding, and refitting the same in entire system as required, including replacing defective liquid strainer, capillary tube and testing complete all as directed by Engineer-in-Charge | | 20 | Kg |
|---|
| 13 | 13 | M&L for taking out unserviceable PCB unit from split/window AC 1.5/2.0 capacity and replace the burnt unserviceable electronic parts, refixing the same after repair and testing its proper function all as directed by Engr -In - Charge | | 6 | Each Job |
|---|
| 14 | 14 | S & F of blower fan blade set for window/split AC as per exixting make including taking down old one complete all as directed | | 3 | Each Job |
|---|
| 15 | 15 | Taking out unserviceable existing cooling coil from window/split AC of 1.5/2.0 ton capacity and supply and fixing of new cooling coil with thermostat complete all as directed | | 2 | Each Job |
|---|
| 16 | 16 | Taking out existing burnt / unserviceable compressor unit from Refrigerator & replacing the same with factory built hermetically sealed compressor unit including necessary accessories and mounting material, welding, leak testing by charging dry Nitrogen gas, charging of refrigerant R-134 A after ensuring leak proof condition. Testing complete all as directed by Engineer-in-Charge. Note Refrigerant gas shall be measured and paid separately. Refrigerator of 165 ltrs to 240 ltrs capacity | | 7 | Each Job |
|---|
| 17 | 17 | All as per item No 16 above but of capacity 260 to 315 ltrs refrigerator | | 7 | Each Job |
|---|
| 18 | 18 | Taking out defective thermostatic switch, supply and fix new thermostatic switch for refrigerator of capacity 165 ltrs to 315 ltrs | | 4 | Each Job |
|---|
| 19 | 19 | Taking out defective Refrigerator freezer chamber , supply and fix new Refrigerator freezer chamber of capacity 165 ltrs to 315 ltrs | | 3 | Each Job |
|---|
| 20 | 20 | Taking out faulty starting relay cum over load protector, supply and fix new starting relay cum over load protector for refrigerator upto 315 ltrs capacity as per existing refrigerator | | 5 | Each Job |
|---|
| 21 | 21 | Taking out existing burnt / unserviceable compressor unit from water cooler & replacing the same with factory built hermetically sealed rotary compressor unit including necessary accessories and maintaining material, welding, leak testing by dry Nitrogen gas and charging R-134A refrigerant gas after ensuring leak proof condition and testing of water cooler 40 / 80 ltrs capacity all as directed by Engineer-in-Charge | | 6 | Each Job |
|---|
| 22 | 22 | Taking out existing burnt / unserviceable compressor unit from Deep Freezer & replacing the same with factory built hermetically sealed compressor unit including necessary accessories and mounting material, welding, leak testing by charging dry Nitrogen gas, charging of refrigerant R-134 A after ensuring leak proof condition. Testing complete all as directed by Engineer-in-Charge. Note Refrigerant gas shall be measured and paid separately. Deep Freezer of 300 ltrs to 400 ltrs capacity | | 3 | Each Job |
|---|
| 23 | 23 | Taking out defective / unserviceable starting relay , supply and fixing of starting relay suitable for water cooler of capacity 40 / 80 ltrs | | 4 | Each Job |
|---|
| 24 | 24 | Taking out defective / unserviceable starting capacitor , supply and fixing of starting capacitor suitable for water cooler of capacity 40 / 80 ltrs | | 10 | Each Job |
|---|
| 25 | 25 | Taking out defective / unserviceable running capacitor , supply and fixing of running capacitor suitable for water cooler of capacity 40 / 80 ltrs | | 10 | Each Job |
|---|
| 26 | 26 | Taking out defective / unserviceable over load protector , supply and fixing of over load protector suitable for water cooler of capacity 40 / 80 ltrs | | 2 | Each Job |
|---|
| 27 | 27 | Taking out defective / unserviceable thermostatic switch , supply and fixing of thermostatic switch suitable for water cooler of capacity 40 / 80 ltrs | | 4 | Each Job |
|---|
| 28 | 28 | Taking out unserviceable PVC ball valve with polythene float & fly nut of 15 mm dia , supply and fixing of PVC ball valve of high pressure with polythene float & fly nut of 15 mm dia suitable for water cooler of capacity 40 / 80 ltrs | | 6 | Each Job |
|---|
| 29 | 29 | Supply and charging of refrigerant R-134A including cost of welding, leak detection and rectification in the entire system with replacement of liquid strainer and capillary tube including testing of water cooler of capacity 40 / 80 ltrs , including toping up in centralised AC plant all as directed by Engineer-in-charge. | | 10 | Kg |
|---|
| 30 | 30 | Taking out of existing damaged / burnt blower motor, supply and fixing of new blower motor, single phase, 230 Volts, 50 Hz suitable for water cooler of capacity 40/80 ltrs including fixing arrangement all as directed by Engineer-in-charge. | | 2 | Each Job |
|---|
| 31 | 31 | Taking down, opening and dismantling storage type water heaters (geysers) of capacity 25/50 ltrs vertical/horizontal type cleaning, descaling, re-assembling and re-installation in the existing place and container by hand operated hydraulic pump complete after necessary repair/replacement of unserviceable items all as directed . (Note : Spare as required shall be measured and paid under relevant items) | | 50 | Each Job |
|---|
| 32 | 32 | S & F heating element of rating 2000 W circular/triangular shape push/thread type with rubber washers of make Bajaj/Theeta/Johnson/Racold | | 72 | Each |
|---|
| 33 | 33 | S & F thermostat for geyser of capacities 25/50 Ltrs of make Bajaj/Elcon/Johnson/Racold | | 50 | Each |
|---|
| 34 | 34 | Supply and fix safety valve/high pressure air release valve ISI marked. | | 20 | Each |
|---|
| 35 | 35 | Supply and fix hot/cold water PVC armoured heavy duty connection pipe suitable for hot water of size 15 mm dia with PTMT nuts of length 450 mm including taking down old/damage PVC connection pipe all as directed | | 50 | Each |
|---|
| 36 | 36 | Supply and fix angular stop cock fancy type chromium plated of size 15 mm dia | | 10 | Each |
|---|