Ministry Of Road Transport And Highways has published Consultancy Services For Rehabilitation And Upgradation To Two Lane With Paved Shoulder Configuration Of Araku ( Bhalluguda ) To Bowdara Section Of Nh-516E In The State Of Andhra Pradesh. Submission Date for this Tender is 16-11-2020. Road Work Tenders in New Delhi Delhi. Bidders can get complete Tender details and download the document.
Name of Work: Consultancy services for Rehabilitation and Upgradation to two lane with paved shoulder configuration of Araku (Bhalluguda) to Bowdara section of NH-516E in the State of Andhra Pradesh. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | KEY PERSONNEL : | item1 | ||
2 | 1.01 | Team Leader cum Senior Highway Engineer | item2 | 10 | Nos |
3 | 1.02 | Senior Bridge Engineer | item3 | 10 | Nos |
4 | 1.03 | Highway cum Pavement Engineer | item4 | 150 | Nos |
5 | 1.04 | Meterial cum Geotechnical Engineer - Geologist | item5 | 12 | Nos |
6 | 1.05 | Senior Survey Engineer | item6 | 1 | Nos |
7 | 1.06 | Traffic and Safety Expert | item7 | 10 | Nos |
8 | 1.07 | Environmental Specilist | item8 | 10 | Nos |
9 | 1.08 | Quantity Surveyor / Documentation Expert | item9 | 150 | Nos |
10 | 1.09 | Land Acquistion Expert | item10 | 12 | Nos |
11 | 1.1 | Utility Expert | item11 | 1 | Nos |
12 | 2 | SUB-PROFESSIONAL STAFF :(To be assessed by consultant as per requirement of assignment and one sub professional be a fresh graduate) | item12 | ||
13 | 2.01 | .. | item13 | 10 | Nos |
14 | 2.02 | .. | item14 | 10 | Nos |
15 | 2.03 | .. | item15 | 150 | Nos |
16 | 2.04 | .. | item16 | 12 | Nos |
17 | 2.05 | .. | item17 | 1 | Nos |
18 | 2.06 | .. | item18 | 10 | Nos |
19 | 2.07 | .. | item19 | 10 | Nos |
20 | 3 | SUPPORT STAFF : | item20 | ||
21 | 3.01 | Office Manager | item21 | 10 | Nos |
22 | 3.02 | Typist | item22 | 10 | Nos |
23 | 3.03 | Office Boy | item23 | 150 | Nos |
24 | 3.04 | Night Watchman | item24 | 12 | Nos |
25 | 4 | Transportation (Fixed Costs) | item25 | ||
26 | 4.01 | The Vehicles Provided by the consultants shall include the cost for rental drivers operation, maintenance, Repairs, insurance etc., A. For use of Consultant | item26 | 10 | Nos |
27 | 5 | Duty Travel to Site(Fixed Costs): | item27 | 1 | Nos |
28 | 6 | Office Rent (Fixed Costs) The rent includes maintenance, cleaning, repairing etc., | item28 | ||
29 | 6.01 | .. | item29 | 10 | Nos |
30 | 7 | OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs) | item30 | ||
31 | 7.01 | Office Supplies | item31 | 10 | Nos |
32 | 7.02 | Drafting Supplies | item32 | 10 | Nos |
33 | 7.03 | Computer Running Costs | item33 | 150 | Nos |
34 | 7.04 | Domestic and International Communication | item34 | 12 | Nos |
35 | 8 | OFFICE FURNITURE AND EQUIPMENT (Rental) | item35 | ||
36 | 8.01 | Office Furniture and Ecquipment ( L.S) | item36 | 10 | Nos |
37 | 9 | REPORTS & DOCUMENTS PRINTING ( For Clubbed Projects) | item37 | ||
38 | 9.01 | Monthly report (3copies per Month) | item38 | 10 | Nos |
39 | 9.02 | Inception Report & QAP | item39 | 10 | Nos |
40 | 9.03 | Environment and Social Impact Screening Report | item40 | 150 | Nos |
41 | 9.04 | Draft Feasibility Report | item41 | 12 | Nos |
42 | 9.05 | Final Feasibility Report | item42 | 1 | Nos |
43 | 9.06 | Strip Plan with LA Reports | item43 | 10 | Nos |
44 | 9.07 | Draft LA and Clearances I Report | item44 | 10 | Nos |
45 | 9.08 | Final LA and Clearances I Report | item45 | 150 | Nos |
46 | 9.09 | Draft Environmental Assessment Report & RAP | item46 | 12 | Nos |
47 | 9.1 | Final Environmental Assessment Report and RAP | item47 | 1 | Nos |
48 | 9.11 | Draft Detailed Design Report & Drawings etc. | item48 | 10 | Nos |
49 | 9.12 | Draft EMP | item49 | 10 | Nos |
50 | 9.13 | Draft Bidding Documents | item50 | 150 | Nos |
51 | 9.14 | Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. | item51 | 12 | Nos |
52 | 9.15 | Final EMP. | item52 | 1 | Nos |
53 | 9.16 | Final Bidding Documents | item53 | 10 | Nos |
54 | 9.17 | Draft 3(a),3(A) and 3(D) notification for land acquisition (3 copies each) | item54 | 10 | Nos |
55 | 9.18 | LA & Clearances II Report | item55 | 150 | Nos |
56 | 10 | Survey and Investigation | item56 | ||
57 | 10.01 | Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer. | item57 | 10 | Nos |
58 | 10.02 | Detailed topographic surveys using mobile / aerial LiDAR or better Technology | item58 | 10 | Nos |
59 | 11 | Investigation (Fixed Cost) | item59 | ||
60 | 11.01 | Road and Bridge Inventory | item60 | 10 | Nos |
61 | 11.02 | FWD Test and Pavement Evaluation | item61 | 10 | Nos |
62 | 11.03 | Roughness Survey | item62 | 150 | Nos |
63 | 11.04 | Axle Load Survey | item63 | 12 | Nos |
64 | 11.05 | Material Survey and Investigation | item64 | 1 | Nos |
65 | 11.06 | Sub-grade Investigation | item65 | 10 | Nos |
66 | 11.07 | Traffice Survey | item66 | 10 | Nos |
67 | 11.08 | Socio-economic & Census Survey/Studies | item67 | 150 | Nos |
68 | 11.09 | Land Acquisition Studies | item68 | 12 | Nos |
69 | 11.1 | Any other Investigations/Surveys | item69 | 1 | Nos |
70 | 12 | Sub-Soil Investigation (Boring) | item70 | ||
71 | 12.01 | a) Boring in all type of soils (other than hard rock) | item71 | 10 | Nos |
72 | 12.02 | b) Boring in hard rock | item72 | 10 | Nos |
73 | 13 | Network Survey and GPR | item73 | ||
74 | 13.01 | Network Survey of the existing Highways as a repository for civil works as per directions from Authority | item74 | 10 | Nos |
75 | 13.02 | GPR Survey for detection of under ground utilities | item75 | 10 | Nos |
76 | 14 | Cost of Supply and Fixing Boundary pillars | item76 | ||
77 | 14.01 | Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed atan interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/ or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum ) | item77 | 10 | Nos |
78 | 15 | Land Acquisition Team including support staff and logistics/ transportation | item78 | ||
79 | 15.01 | Ex-Land Revenue Inspector/ Officer or equivalent | item79 | 10 | Nos |
80 | 15.02 | Ex-Kanoogo/Girdwar or equivalent | item80 | 10 | Nos |
81 | 15.03 | Ex-Patwari or Equivalent | item81 | 10 | Nos |
82 | 15.04 | Typist | item82 | 10 | Nos |
83 | 15.05 | Peon | item83 | 10 | Nos |
84 | 16 | B. Logistics for Land Acquisition Team | item84 | ||
85 | 16.01 | Computer including necessary peripherals | item85 | 10 | Nos |
86 | 16.02 | Printers | item86 | 10 | Nos |
87 | 16.03 | Vehicles (Bolero or Equivalent) with monthly running limit of 4000 km | item87 | 10 | Nos |
88 | 17 | Estimate of Costs for Expatriate Consultants (in Indian Rupees) | item88 | ||
89 | 17.01 | I. Remuneration of Expatriate Staff including per diem allwances | item89 | 10 | Nos |
90 | 17.02 | II. Mobiliation and Demobilization | item90 | 10 | Nos |
91 | 17.03 | 1. International Airfares (Fixed Costs) | item91 | 10 | Nos |
92 | 18 | Total Cost Net of Tax: | item92 | ||
93 | 18.01 | I. Income Tax (Expatriate Staff) | item93 | 10 | Nos |
94 | 18.02 | II. Other Taxes/ duties (if any) Specify Clearly | item94 | 10 | Nos |
95 | 19 | Goods and Service Taxes @ 18% | item95 | 1 | Nos |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail