Providing , Installing , Commissioning And Making Go Live The Smart Instruction Center And Training Infrastructure And Its Amc Along With Other Miscellaneous Work For Faculty Development Academy In New Administrative Building Of Msbte At Pune
Tender Overview
Project Description
Providing , Installing , Commissioning And Making Go Live The Smart Instruction Center And Training Infrastructure And Its Amc Along With Other Miscellaneous Work For Faculty Development Academy In New Administrative Building Of Msbte At Pune
BOQ
| Name of Work: PROVIDING, INSTALLING, COMMISSIONING AND MAKING GO LIVE THE SMART INSTRUCTION CENTER & TRAINING INFRASTRUCTURE & ITS AMC ALONG WITH OTHER MISCELLANEOUS WORK FOR FACULTY DEVELOPMENT ACADEMY IN NEW ADMINISTRATIVE BUILDING OF MSBTE AT PUNE | |||||
|---|---|---|---|---|---|
| Sr.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Networking Requirement Specifications | |||
| 2 | 1.01 | Access Layer Switch | item1 | 4 | Nos |
| 3 | 1.02 | Core/Distribution Layer Switch | item2 | 4 | Nos |
| 4 | 1.03 | Firewall | item3 | 1 | Nos |
| 5 | 1.04 | 42 U Rack | item4 | 2 | Nos |
| 6 | 1.05 | 12 U Rack | item5 | 6 | Nos |
| 7 | 1.06 | Patch Panal | item6 | 8 | Nos |
| 8 | 1.07 | I/O Box Set | item7 | 200 | Nos |
| 9 | 1.08 | Patch Cord 1 Meter | item8 | 200 | Nos |
| 10 | 1.09 | Patch Cord 3 Meter | item9 | 200 | Nos |
| 11 | 1.1 | Router ( VPN) | item10 | 1 | Nos |
| 12 | 2 | Smart Classroom (Audio-Video Classroom) Requirement Specifications | |||
| 13 | 2.01 | Interactive display | item11 | 1 | Nos |
| 14 | 2.02 | Interactive Projector | item12 | 4 | Nos |
| 15 | 2.03 | Digital visualizer / Document Camera | item13 | 4 | Nos |
| 16 | 2.04 | Non-magnetic White board | item14 | 4 | Nos |
| 17 | 2.05 | Air conditioning unit | item15 | 1 | Nos |
| 18 | 2.06 | levier mic | item16 | 4 | Nos |
| 19 | 2.07 | Studio Monitor (Speakers) system | item17 | 4 | Nos |
| 20 | 3 | FDA Computer Lab Requirement Specification | |||
| 21 | 3.01 | High End Desktop PC | item18 | 100 | Nos |
| 22 | 3.02 | Multimedia PC | item19 | 50 | Nos |
| 23 | 3.03 | Professional Laptop | item20 | 20 | Nos |
| 24 | 3.04 | Printer A4 | item21 | 10 | Nos |
| 25 | 3.05 | Printer A3 | item22 | 2 | Nos |
| 26 | 3.06 | Server | item23 | 2 | Nos |
| 27 | 3.07 | All in One Computer System | item24 | 10 | Nos |
| 28 | 4 | STUDIO REQUIREMENTS | |||
| 29 | 4.01 | [A] Studio Equipment Requirement Specifications | |||
| 30 | 4.011 | Camera / Camcorder | item25 | 3 | Nos |
| 31 | 4.012 | Smart Television set with CPU and monitoring accessories | item26 | 2 | Nos |
| 32 | 4.013 | Interactive display | item27 | 1 | Nos |
| 33 | 4.014 | Podium mic/ Desk Mic | item28 | 1 | Nos |
| 34 | 4.015 | Digital visualizer / Document Camera | item29 | 1 | Nos |
| 35 | 4.016 | Non magnetic White board | item30 | 1 | Nos |
| 36 | 4.017 | Air conditioning unit | item31 | 2 | Nos |
| 37 | 4.018 | Multimedia Software | item32 | 1 | Subscription per Year |
| 38 | 4.019 | Sound(Audio) mixing and control board | item33 | 1 | Nos |
| 39 | 4.02 | KVM switch | item34 | 2 | Nos |
| 40 | 4.021 | Cables, connectors, switchers and splitters | item35 | 1 | Nos |
| 41 | 4.022 | Echo cancellation device | item36 | 1 | Nos |
| 42 | 4.023 | Studio Monitor (Speakers) system | item37 | 4 | Nos |
| 43 | 4.024 | Lavier mic | item38 | 1 | Nos |
| 44 | 4.025 | Android Tablet | item39 | 1 | Nos |
| 45 | 4.026 | HDMI Capture Card | item40 | 1 | Nos |
| 46 | 4.027 | Professional Computer System for Recording, Editing, Controling the setup | item41 | 2 | Nos |
| 47 | 4.028 | HDMI Switcher | item42 | 1 | Nos |
| 48 | 4.029 | 6KVA UPS | item43 | 1 | Nos |
| 49 | 4.03 | Remote set up VSAT | item44 | 1 | Unit set |
| 50 | 4.031 | Digital Podium | item45 | 1 | Nos |
| 51 | 4.032 | Software Platform for Video conferencing ( 100 users) | item46 | 1 | Nos |
| 52 | 4.033 | Voice detection Camera for Video Conference | item47 | 1 | Nos |
| 53 | 4.2 | [B] Studio Infrastructure Requirement Specifications | |||
| 54 | 4.201 | Acoustic Wall (2400 X 900mm) Thickness 12.5 mm (behind Channel section, glass wool, gypsum board, paint) (0.9 NRC) | item48 | 2000 | Sq.ft |
| 55 | 4.202 | Acoustic Ceiling (2x2 ft) Thickness 12.5 mm (0.9 NRC) | item49 | 950 | Sq.ft |
| 56 | 4.203 | Supply and installation off \"Acoustic Door\" | item50 | 2 | No. |
| 57 | 5 | PART [II] : Estimated cost of Operational Expenditure (For Three Year) | |||
| 58 | 5.1 | Cost of Operational Expenditure (For First Year) | |||
| 59 | 5.11 | Satellite Bandwidth/ Internet service: with Lease line charges (HuB) -32 Mbps VDSL/ dedicated Internet lease line 1:1 connectivity and 256 Mbps additional internet lease line for users for 3 years, upgradable up to 1Gbps, | item51 | 1 | 1 Year subscription charges |
| 60 | 5.12 | MANPOWER | |||
| 61 | 5.121 | 1. Studio Engineer | item52 | 1 | 1 Year subscription charges |
| 62 | 5.122 | 2. Recording Engineer | item53 | 1 | 1 Year subscription charges |
| 63 | 5.123 | 3. Asst Studio Engineer | item54 | 1 | 1 Year subscription charges |
| 64 | 5.124 | 4. IT support Engineer | item55 | 1 | 1 Year subscription charges |
| 65 | 5.2 | Cost of Operational Expenditure (For Second Year) | |||
| 66 | 5.21 | Satellite Bandwidth/ Internet service: with Lease line charges (HuB) -32 Mbps VDSL/ dedicated Internet lease line 1:1 connectivity and 256 Mbps additional internet lease line for users for 3 years, upgradable up to 1Gbps, | item 56 | 1 | 1 Year subscription charges |
| 67 | 5.22 | MANPOWER | |||
| 68 | 5.221 | 1. Studio Engineer | item57 | 1 | 1 Year subscription charges |
| 69 | 5.222 | 2. Recording Engineer | item58 | 1 | 1 Year subscription charges |
| 70 | 5.223 | 3. Asst Studio Engineer | item59 | 1 | 1 Year subscription charges |
| 71 | 5.224 | 4. IT support Engineer | item60 | 1 | 1 Year subscription charges |
| 72 | 5.3 | Cost of Operational Expenditure (For Third Year) | |||
| 73 | 5.31 | Satellite Bandwidth/ Internet service: with Lease line charges (HuB) -32 Mbps VDSL/ dedicated Internet lease line 1:1 connectivity and 256 Mbps additional internet lease line for users for 3 years, upgradable up to 1Gbps, | item61 | 1 | 1 Year subscription charges |
| 74 | 5.32 | MANPOWER | |||
| 75 | 5.321 | 1. Studio Engineer | item62 | 1 | 1 Year subscription charges |
| 76 | 5.322 | 2. Recording Engineer | item63 | 1 | 1 Year subscription charges |
| 77 | 5.323 | 3. Asst Studio Engineer | item64 | 1 | 1 Year subscription charges |
| 78 | 5.324 | 4. IT support Engineer | item65 | 1 | 1 Year subscription charges |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender