| 1 | 1 | Beppu Watershed Under PMKSY - Drainage line treatment work | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.01 | 2.6.1. Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. All kinds of soil. | BI01010001010000000000000515BI0100001113 | 151.21 | m3 |
|---|
| 3 | 1.02 | 2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil and directed, within a lead of 50m. All kinds of soil. | BI01010001010000000000000515BI0100001114 | 175.77 | m3 |
|---|
| 4 | 1.03 | 2.26.1 Extra for every additional lift 1.50m or part there of in excavation/banking excavated or stacked materials.All kinds of soil. | BI01010001010000000000000515BI0100001115 | 188.85 | m3 |
|---|
| 5 | 1.04 | od1391/2018_19 Dry stone masonry using laterite boulders including all coast,conveyance and labour charges etc.complete.(Obsrved Data) | BI01010001010000000000000515BI0100001116 | 356.92 | m3 |
|---|
| 6 | 1.05 | od1392/2018_19 Rough stone dry packing for aprons and revetment using laterite boulders including all cost,conveyance and labour charges etc.complete.(Observed Data) | BI01010001010000000000000515BI0100001117 | 17.66 | m3 |
|---|
| 7 | 1.06 | 4.1.5 Providing and laying cement concrete in 1:3:6 grade excluding cost of centering and shuttering | BI01010001010000000000000515BI0100001118 | 43.58 | m3 |
|---|
| 8 | 1.07 | 5.9.5 Centering and shuttering including strutting, propping etc. and removal of form work for: | BI01010001010000000000000515BI0100001119 | 73.12 | m2 |
|---|
| 9 | 1.08 | 60.7.1 DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site. | BI01010001010000000000000515BI0100001120 | 10.07 | m3 |
|---|
| 10 | 1.09 | 60.7.4 DR PACKING FOR APRONS-Rough stone dry packing for apron with good quality blasted rubble including packing to compactness to lines levels,cost and conveyance of all materials labour charges etc.complete as per direction of Departmental officers at site. | BI01010001010000000000000515BI0100001121 | 5.52 | m3 |
|---|
| 11 | 1.1 | 4.1.3 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001122 | 8.78 | m3 |
|---|
| 12 | 1.11 | 4.3.2 Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls,return walls,(any thickness)including attached pilasters,buttresses,plinth and string courses fillets,kerbs and steps etc. | BI01010001010000000000000515BI0100001123 | 59.06 | m2 |
|---|
| 13 | 1.12 | od1395/2018_19 Supplying and fixing of Thampakam wood shutter for concrete checkdam including all charges of matrials and all labour charges etc.(Observed Data) | BI01010001010000000000000515BI0100001124 | 120 | dm3 |
|---|