| 1 | 1 | Opening of 400 WA Boiler for taking out steel water heating coil with chain pulley block and refitting of the same after descaling and repairs, including cost of the gaskets, washers etc complets job at J&K High Court Srinagar. | | 2 | No |
|---|
| 2 | 2 | Descaling of 400 W A Boiler with chemicals, pumping out deposits on the surface of steel coils and pipes of hot water circulation at J&K High Court Srinagar. | | 2 | No |
|---|
| 3 | 3 | Opening of 600 W A Boiler for taking out steel water heating coil with chain pulley block and refitting of the same after descaling and repairs, including cost of the gaskets, washers etc complete job at J&K High Court Srinagar. | | 3 | No |
|---|
| 4 | 4 | Descaling of 600 W A Boiler with chemicals, pumping out deposits on the surfaces of steel coils and pipes of hot water circulation at J&K High Court Srinagar. | | 3 | No |
|---|
| 5 | 5 | Opening of 200WA Boiler for taking out steel water heating coil with chain pulley block and refitting of the same after descaling and repairs, including cost of gaskets, washers etc complete job at Chief Engineer Complex R&B Rajbagh. | | 2 | No |
|---|
| 6 | 6 | Descaling of 200WA Boiler with chamicals, pumping out desposits on the suface of steel coils and pipes of hot water circulations at Chief Engineer Complex R&B Rajbagh. | | 2 | No |
|---|
| 7 | 7 | Providing and fixing of refectory cement at the bottom of L.D.O 400 WA Boiler complete job at J&K High Court Srinagar. | | 2 | No |
|---|
| 8 | 8 | Providing and fixing of refectory cement at the back of HSD 600 WA Boiler completes job at J&K High Court Srinagar. | | 2 | No |
|---|
| 9 | 9 | Providing and fixing of refectory cement at back of H.S.D 200 WA Boiler complete job at Chief Engineer Complex Rajbagh Srinagar. | | 1 | No |
|---|
| 10 | 10 | Gerneral check up and cleaning of Air Handling units for free flow of air by opening of radiators/blowers including chemical washing of coils and cleaning of shafts, greasing to bearings includng carriage of coils to work shop after descaling back to site of work including fitting of bearing shaft complete job. includng replacement of AHU bearings of reputed make if required at J&K High Court Srinagar. | | | |
|---|
| 11 | 10.1 | AHU with 5No. Coiles | | 4 | No |
|---|
| 12 | 10.2 | AHU with 6No. Coiles | | 4 | No |
|---|
| 13 | 11 | Providing and fixing of contactors and overloads of approved make. | | | |
|---|
| 14 | 11.01 | A: Contractor's | | | |
|---|
| 15 | 11.02 | ML-1/1.5 (For LDO boilers LNT make. | | 1 | No |
|---|
| 16 | 11.03 | 6-10 Amp (for HSD 200WA of MR simens make) | | 1 | No |
|---|
| 17 | 11.04 | 16 Amp (for 600 WA HSD base MR Simens make. | | 1 | No |
|---|
| 18 | 11.05 | B: Overload | | | |
|---|
| 19 | 11.06 | 35 Amp | | 1 | No |
|---|
| 20 | 11.07 | 20-25 Amp ( For 600 Wa Boiler simens make) | | 1 | No |
|---|
| 21 | 12 | Opening and cleaning of radiator with blowing air and with biocorbonate solution for checking of any leakage, replacement of gaskets if needed etc and connecting back with system at Chief Engineer R&B Rajbagh Complex/ at J&K High Court Engineering Block. | | 90 | No |
|---|
| 22 | 13 | Replacement of MCB TPN of approved Quality at High Court Complex | | | |
|---|
| 23 | 13.01 | 63 Amp | | 1 | No |
|---|
| 24 | 13.02 | 32 Amp | | 1 | No |
|---|
| 25 | 13.03 | 100 Amp | | 1 | No |
|---|
| 26 | 14 | General Check up of water supply motors of different powers by way of replacement of gum metal bushes, runners, greasing etc incl disdmantlling & refixing complete. | | | |
|---|
| 27 | 14.01 | 20 HP at J&K High Court Complex. | | 1 | No |
|---|
| 28 | 14.02 | 15 HP at J&K High Court Complex. | | 2 | No |
|---|
| 29 | 14.03 | 10 HP at J&K High Court Complex. | | 2 | No |
|---|
| 30 | 14.04 | 75 HP at J&K High Court Complex. | | 2 | No |
|---|
| 31 | 14.05 | 3 HP at Chief Engineering Complex Rajbagh Srinagar. | | 2 | No |
|---|
| 32 | 15 | Providing and fixing of polythene to windows and ventilators of entire High Court Complex to prevent heat loss during running of central Heating system and removing of the same after conclusion of winter season to windows/ ventilators of J&K High Court Complex) | | 55 | Kgs |
|---|
| 33 | 16 | Providing and fixing of Blankets o f standard quality for doors to prevent heat loss including removal of the same after conclusion of winter season | | 6 | No |
|---|
| 34 | 17 | providing of wooden beading for fixing of polythiene to windows / ventilators of size 3/4 | | 675 | RFT |
|---|
| 35 | 18 | providing and fixitation of 1 1/4 size wooden beeding fr fixing of door blankets at J&K high court complex/ advocate general administrative litigant block / Engineering block | | 400 | RFT. |
|---|
| 36 | 19 | Replacement of Ahu belt of reputed make of various sizes for Ahu of J&K High Court Complex | | 5 | No |
|---|
| 37 | 20 | Replacement of Pressure Switch for LDO Boiler (400 WA) Type IPSD50 Differential Pressure Switch of standard quality including dismantlling and installation complete at J&K High Court Complex Srinagar. | | 2 | No |
|---|
| 38 | 21 | Rewinding of burnt out motors of different capacities including dismantlling of necessary connections, rewinding by way of replacing damaged copper wiring by suitable guage copper wire including providing and fitting of lathoride sheets, varnishing compound and other consumeable items incl. shifting to workshop by mechanical transport and back to site and installing the same and checking the performance of same in full and idle load in J&K High Court Complex Srinagar. | | | |
|---|
| 39 | 21.01 | 7.5 HP Capacity Motor. | | 1 | No |
|---|
| 40 | 21.02 | 15/20 HP Capacity Motor. | | 1 | No |
|---|
| 41 | 22 | Providing and fixing of 25 Amp Rotary Switch of standard make for 400 WA LDO boiler incl. dismantlling of defunct switch and fixing of new one and making of necessary connections and testing complete at J&K High Court Complex Srinagar. | | 1 | No |
|---|
| 42 | 23 | Providing and fixing of 7.5 nm H.P capacity motor of kridosker make (Mechanical soal) & type KDS- 844+ if RPM-2500/Head -38/ Dia 178/ Kcv/HP-3-5-7.5 with 50n Hz 3pH. 400v incl. Dismentalling of defrant /burned out motionj incl. Testinge and checking for performance of the same on fall and idea load. | | 1 | No |
|---|
| 43 | 24 | Providing of capacity motion of Kridosker motion dismentalling of deferant burned out motion in it. Testing/ checking for reformermer of the same on full side road | | 1 | No |
|---|
| 44 | 25 | Providing of starter 7.5 HP Phase of Havels made | | 2 | No |
|---|
| 45 | 26 | Providing of 4 pole Meb 63 amp of Havles made | | 2 | no |
|---|
| 46 | 27 | Providing of 3 pole MCB 63 Amp of Havels make | | 2 | No |
|---|
| 47 | 28 | Replacement of different Air release valve with wall of approved 1st make | | 3 | No |
|---|
| 48 | 29 | Supply /Fitting fresh filter transformar oil | | 30 | Litters |
|---|
| 49 | 30 | Providing of Ignition tranformer for 40 WA (L.D.Dil) MR of thermal make in it dismentling complete job(Boil) At High court complex | | 1 | No |
|---|