}

Job Order For Energy Audit Of Sub Stations And Transformers At Af Stn Sirsa, GE (AF) Sirsa-Haryana

Military Engineer Services-MES has published Job Order For Energy Audit Of Sub Stations And Transformers At Af Stn Sirsa. Submission Date for this Tender is 12-10-2020. Energy Audit Tenders in GE (AF) Sirsa Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

25569946
Job Order For Energy Audit Of Sub Stations And Transformers At Af Stn Sirsa
National Competitive Bid
Indian
Haryana
GE (AF) Sirsa
12-10-2020

Tender Details

Job Order For Energy Audit Of Sub Stations And Transformers At Af Stn Sirsa , checking of electrical system network , it should cover substations , sub station equipments , ac plants , pump houses , reactive power compensation , power factor improvement in metering etc . transformers ( 48 nos ) : the audit scope should include study of 48 transformers with ring main units and vacuum circuit breakers located at air force permises , their loading pattern , reconfiguration , renetworking , load balancing , losses and efficiency and possible suggestion to improve efficiency and life based on life cycle cost . electrical motors & pumps ( above 10hp ) : the operation of electric motors/pumps should be studied using appropriate instrumentation support to assess the loading pattern , power factor , flow operating efficiency and other operational parameters . this should also include detailed study of the mechanical power transmission system to evolve suitable recommendations wherever feasible for energy efficiency improvements . study of cooling towers associated with central ac plants . this should include detailed study of the operational performance of the cooling towers through measurements of temperature difference , air/water flow rate to enable evaluate specific performance parameters like approach , efficiency etc . study of lighting system of hangers and blast pens: a comprehensive study of the entire lighting system covering the light source ( lamps ) , luminiares ( reflectors etc ) , and the gears ( ballsts ) should be taken up . besides this the illumination levels required viz-a-viz available should also be studied . study of air conditioning & refrigeration system: the study should involve name plate details comparison with analysis of various parameters like co-efficient of performance , tonnage delivered , effectiveness of the ducting etc of the air conditioning systems . also the study should include the performance evalution of the allied system . green energy options and feasibility study . energy management policy and strategy . the reports would highlight the energy conservation opportunities ( ecos ) which are practically feasible in the plant along with the investments required and list of suppliers for installation of energy efficient equipments .

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

NAME OF WORK : JOB ORDER FOR ENERGY AUDIT OF SUB STATIONS AND TRANSFORMERS AT AF STN SIRSA
Item Description Item Code / Make Quantity Units
1 Checking of Electrical System Network, it should cover substations, Sub Station equipments, AC Plants, Pump Houses, Reactive Power Compensation, Power Factor improvement in metering etc. \nTransformers (48 Nos): The audit scope should include study of 48 transformers with Ring Main units and Vacuum Circuit Breakers located at Air Force permises, their loading pattern, reconfiguration, renetworking, load balancing, losses and efficiency and possible suggestion to improve efficiency and life based on life cycle cost.\nElectrical motors & pumps (above 10HP): The operation of Electric motors/pumps should be studied using appropriate instrumentation support to assess the loading pattern, power factor, flow operating efficiency and other operational parameters. This should also include detailed study of the mechanical power transmission system to evolve suitable recommendations wherever feasible for energy efficiency improvements. \nStudy of cooling towers associated with central AC plants. This should include detailed study of the operational performance of the cooling towers through measurements of temperature difference, air/water flow rate to enable evaluate specific performance parameters like approach, efficiency etc.\n\nStudy of lighting system of Hangers and Blast Pens: A comprehensive study of the entire lighting system covering the light source (Lamps), luminiares (Reflectors etc), and the gears (ballsts) should be taken up. Besides this the illumination levels required viz-a-viz available should also be studied.\nStudy of air conditioning & refrigeration system: The study should involve name plate details comparison with analysis of various parameters like co-efficient of performance, tonnage delivered, effectiveness of the ducting etc of the air conditioning systems. Also the study should include the performance evalution of the allied system.\nGreen energy options and feasibility study.\nEnergy management policy and strategy.\nThe reports would highlight the energy conservation opportunities (ECO's) which are practically feasible in the plant along with the investments required and list of suppliers for installation of energy efficient equipments.\n BI01010001010000000000000515BI0100001113 1 Each Job
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail