Selection Of Technical Consultancy For Feasibility Study  ,   Preparation Of Detailed Feasibility Report  ,   Basic Design And Preparation Of Tender Documents For Augmenting Yard Infrastructure  , Topographic And Bathemetric Survey Required For  Proposed Facilities Covering All  Areas As Indicated In The Annexure -1 And Submit The Report  , Visual Inspection Of Existing Facilities ,  Ascertain The Actual Condition Of The Slipway-4  & Associated Facilities And Submit The Inception Report Containing The Way Forward , Conducting Land  Based Geotechnical Investigations By Drilling  Boreholes Of 100  Mm To 150 Mm Dia  , Up To Minimum Of  25 Mts From Existing Ground Level Or 3 Mts In To Hard Rock Which Ever Is More For Slipway No;4 ,  Analysing The Spt/Disturbed /Undisturbed Samples  And Submit The Report  , Conducting Land  Based Geotechnical Investigations By Drilling  Boreholes Of 100  Mm To 150 Mm Dia  , Up To Minimum Of  25 Mts From Existing Ground Level Or 3 Mts In To Hard Rock Which Ever Is More For Production Halls & Blasting& Painting Bays  ,  Analysing The Spt/Disturbed /Undisturbed Samples  And Submit Report  , Conducting  Sea  Based Under Water Geotechnical Investigations By Drilling  Boreholes Up To Minimum Of  20 Mts Depth From Existing Seabed Level  Or 3 Mts In To Hard Rock Which Ever Is More  For Slipway No:4 Analysing The Spt/Disturbed /Undisturbed Samples  And Submit Report   , Core Cutting Through  The Existing Rcc/Pcc Of Existing Facilites  ,  Analysing The Data  And Submit Detailed Report On Strenghth And Other Parameters .   , Conducting Ndt Tests Like Rebound Hammer And  Upv Tests For Determining Strength /Densitry /Integrity Of Structural Members Like Slab , Beam ,  Pile Caps & Piles  Of The Existing Structure .  , Conducting  Underwater Survey Of Existing Submerged Structure Of Slip Way No: 4 At Way End And Assess The Load Bering Capacity  & Condition Of The Structure  ,  Develop Feasible Solution For Widening Of Slipway-4 Together With The Proposed 2 X  ( 2X125 )  Tcapacity  ,  45 M Span Goliath Crane Supports Based On Capacity Of Existing Piles And Integrate The New Foundation System .   , Prepare Layout And Sectional Details Of Modifications Including Extension Of Slipway In To The Seaward Side And Land Side  , Analysing The Data Of Existing Facilities ,  Conducting Physical Load Tests ,  Preparing  Structural Load / Capacity Calculations Including Foundation Design As A Composite Solution To The Extent Possible For  Utilising The Existing Facilities And Submit The Report  .  , Conducting Physical Load Test Or Any Other Siutable Methaod For Capacity Evaluation Of Existing Concrete Paved Area Earmarked  For Fabrication Of Mega Blocks And Refurbish , Suggest Solution To Improve The Capacities If Required .  , Study The Condition Of Existing Rcc Service Ducts And Suggest Remedial Measures Or Replacement Design If Required .  ,  Assess The Condition And Evaluate The Load Carrying Capacity Of Existing Rcc Blocks For The Use Of Launching And Suggest And Prepare Modification If Required .  , Prepare Layout And  Other Drawings  Of New Infrastructure Facilitieslisted Below .  Includingindicating The General Arrangements Of Machnery & Equipment  ,  Production Hall - 3 Nos , Humudity Controlled  Blasting And Painting Hall - 4 Nos Accommodating  One Engine Room In Between  ,  Carry Out Preliminary Design Calculations To Derive Structural Capacity Of Foundations And Structures .  , Defining  Scope For Detailed Design And Preparing Tentative Bill Of Quantities And Cost Estimate For The Project And Level 1 Schedule For Engineering ,  Construction And Commissioning .  ,  Ratification Of The Findings From Third Party  Such As Nits /Iits / Bureau Veritas ( I )  As Approved By Hsl .  , Presentation And Discussion On Findings ,  Observations And Recommendations To Hsl And M/S Anadolu Shipyard  ( The Collaborator )  , Prepare Detailed Feasibility Report  ( Dfr )  & Make Presentation Of The Proposed Project Segment Wise And Appraise Hsl Management On Implementation Procedure .  , Preparation Of Tender Documents For Detailed Design And Execution , Note:1 )  All Price Component Entries From Sl No 1 To 21 Are To Be Filled Separately Against The Respective Item . 2 )  To & Fro Travel For Visits To The Required Place Of Work As Per Scope Of Work ,  Lodging And Boarding Charges At Required Place Of Work Are To Be Included .   No Separate Payment Shall Be Entertained . 3 )  No Price Figure Is To Be Placed In The Price Format When Used For Technical Bid .