}

Laying Of 250/150/100Mm Dia Di Line Distribution Network For Providing Water Supply To Sree Enclave Under Yapral Section, Sd-I, O&M Divn.No.Xiii., MEDCHAL-MALKAJGIRI-Telangana

Hyderabad Metropolitan Water Supply And Sewerage Board-HMWSSB has published Laying Of 250/150/100Mm Dia Di Line Distribution Network For Providing Water Supply To Sree Enclave Under Yapral Section, Sd-I, O&M Divn.No.Xiii.. Submission Date for this Tender is 01-10-2020. Pipe Laying Tenders in MEDCHAL-MALKAJGIRI Telangana. Bidders can get complete Tender details and download the document.




Tender Notice

25541082
Laying Of 250/150/100Mm Dia Di Line Distribution Network For Providing Water Supply To Sree Enclave Under Yapral Section, Sd-I, O&M Divn.No.Xiii.
Open Tender
Indian
Telangana
MEDCHAL-MALKAJGIRI
01-10-2020

Tender Details

Laying Of 250/150/100Mm Dia Di Line Distribution Network For Providing Water Supply To Sree Enclave Under Yapral Section, Sd-I, O&M Divn.No.Xiii.

Key Value

Document Fees
Refer document
EMD
INR 12410.0 /-
Tender Value
INR 12.41 Lakhs /-

BOQ Items

S.No Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)
1 Laying of 250/150/100mm dia DI line distribution --- 3.60 One Cum 5948.00 21412.80
Cement Concrete (1:2:4) With 400Kgs Cement/M3 mix with 20mm gauge hard granite machine crushed metal including cost and conveyance of all material to site, machine mixing of concrete, lifts, leads from work laying in positing, vibrating, compacting, curing, all labour charges, tools and plants and all other incidental and operational charges etc.,complete as directed by the H.M.W.S.&.S. Board Engineers.
2 Laying of 250/150/100mm dia DI line distribution --- 1.00 Each 4485.00 4485.00
Making Dummy arrangements with sockt Tail piece and MS dummy plate including nuts and bolts all labour charges tools and plants and all other incidental charges etc complete as directed by departmental; officers. For 150mm dia
3 Laying of 250/150/100mm dia DI line distribution --- 10.00 Each 3066.00 30660.00
Making Dummy arrangements with sockt Tail piece and MS dummy plate including nuts and bolts all labour charges tools and plants and all other incidental charges etc complete as directed by departmental; officers. For 100mm dia
4 Laying of 250/150/100mm dia DI line distribution --- 820.69 One Cum 34.90 28642.08
Refilling the pipe line trenches with selected excavated soils complying with standard specification after the pipe line is laid, joined and tested as etc., complete as directed by the H.M.W.S.&.S. Board Engineers including breaking of clods, watering, tamping and inclusive of all incidental and operational charges etc., complete as directed by the H.M.W.S.&. S. Board Engineers.
5 Laying of 250/150/100mm dia DI line distribution --- 12.00 Each 7411.00 88932.00
Supply and fixing of precasted RCC manhole chamber having the size of 36" at bottom 21" dia at top with tappers exluding cost of FRC cover and frame and inlcuding laying in CC (1:2:4) prop. Incuding cost of materials, labour charges, curing coveyance etc., complete as directed by the H.M.W.S.&. S. Board Engineers.
6 Laying of 250/150/100mm dia DI line distribution --- 126.00 One Cum 132.40 16682.40
Carting the excavated earthwhich is not useful to refilling the pipe line trenching including 10KM loading, unloading, incidental and labour charges,incidental and operational charges etc., complete as directed by the HMWSSB Officers.
7 Laying of 250/150/100mm dia DI line distribution --- 18.00 Each 265.00 4770.00
Jointing the CI/DI K7 D/F pipes and specials and vavles including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water and testing to required field test including pressure labour charges and all other operational & incidental charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers. For 100mm dias Svs
8 Laying of 250/150/100mm dia DI line distribution --- 2.00 Each 399.00 798.00
Jointing the CI/DI K7 D/F pipes and specials and vavles including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water and testing to required field test including pressure labour charges and all other operational & incidental charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers. For 150mm dias Svs
9 Laying of 250/150/100mm dia DI line distribution --- 4.00 Each 610.00 2440.00
Jointing the CI/DI K7 D/F pipes and specials and vavles including cost of jointing materials such as bolts, nuts, rubber insertion, white lead and including filling with water and testing to required field test including pressure labour charges and all other operational & incidental charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers. For 250mm dias Svs
10 Laying of 250/150/100mm dia DI line distribution --- 9.00 Each 138.00 1242.00
Labour charges for lowering and keeping in position DI/CI Sluice valves including all incidental and optional charges to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers. For 100mm dia Svs
11 Laying of 250/150/100mm dia DI line distribution --- 1.00 Each 233.00 233.00
Labour charges for lowering and keeping in position DI/CI Sluice valves including all incidental and optional charges to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers. For 150mm dia Svs
12 Laying of 250/150/100mm dia DI line distribution --- 2.00 Each 546.00 1092.00
Labour charges for lowering and keeping in position DI/CI Sluice valves including all incidental and optional charges to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers. For 250mm dia Svs
13 Laying of 250/150/100mm dia DI line distribution --- 217.00 Each 136.00 29512.00
Jointing the CI/DI (K7) pipes and specials with S/S ends (Tyton rubber joints) excluding cost of jointing materials such as rubber gasket and filling with water and testing to required field pressure of 8kg/Sqcm, including labour charges and all other operational & incidental charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers. For 100mm dia DI K7 Pipes
14 Laying of 250/150/100mm dia DI line distribution --- 32.00 Each 166.00 5312.00
Jointing the CI/DI (K7) pipes and specials with S/S ends (Tyton rubber joints) excluding cost of jointing materials such as rubber gasket and filling with water and testing to required field pressure of 8kg/Sqcm, including labour charges and all other operational & incidental charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers. For 150mm dia DI K7 Pipes
15 Laying of 250/150/100mm dia DI line distribution --- 53.00 Each 206.00 10918.00
Jointing the CI/DI (K7) pipes and specials with S/S ends (Tyton rubber joints) excluding cost of jointing materials such as rubber gasket and filling with water and testing to required field pressure of 8kg/Sqcm, including labour charges and all other operational & incidental charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers. For 250mm dia DI K7 Pipes
16 Laying of 250/150/100mm dia DI line distribution --- 3.00 Each 235.00 705.00
Jointing the CI/DI (K7) pipes and specials with S/S ends (Tyton rubber joints) excluding cost of jointing materials such as rubber gasket and filling with water and testing to required field pressure of 8kg/Sqcm, including labour charges and all other operational & incidental charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers. For 300mm dia DI K7 Pipes
17 Laying of 250/150/100mm dia DI line distribution --- 10.00 Each 111.00 1110.00
Cutting of dia DI K7 class Pipe and special without water in the main, including incidental and operational charges etc., complete as directed by departmental officers. For 100mm dia DI K7 pipes
18 Laying of 250/150/100mm dia DI line distribution --- 6.00 Each 209.00 1254.00
Cutting of dia DI K7 class Pipe and special without water in the main, including incidental and operational charges etc., complete as directed by departmental officers. For 150mm dia DI K7 pipes
19 Laying of 250/150/100mm dia DI line distribution --- 8.00 Each 348.00 2784.00
Cutting of dia DI K7 class Pipe and special without water in the main, including incidental and operational charges etc., complete as directed by departmental officers. For 250mm dia DI K7 pipes
20 Laying of 250/150/100mm dia DI line distribution --- 2.00 Each 32282.00 64564.00
Manufacture, supply and delivery of Single chamber DI Air Valve with Body and cover in Ductile iron of grade GGG40/SG-400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S3896-part2-1985 and subseuent revisions. All internal parts such as float, shell etc., allcover bolts, of stainless steel, and Gaskets and seals of EPDM food grade quality Epoxy powder coating(EP-P) inside and outside colour blue. drilled as per IS:1538. For 50 mm dia.
21 Laying of 250/150/100mm dia DI line distribution --- 946.00 One Rmt 49.00 46354.00
Lowering the CI/DI(K7) Pipes and specials S/S ends LA class excluding cost of CI pipes specials and carefully into the pipeline trenches and laying them true to alignment and gradient including labour charges and all incidental and operational charges to work site etc., as directed by departmental officers. For 100mm dia DI K7 Pipes
22 Laying of 250/150/100mm dia DI line distribution --- 115.50 One Rmt 80.00 9240.00
Lowering the CI/DI(K7) Pipes and specials S/S ends LA class excluding cost of CI pipes specials and carefully into the pipeline trenches and laying them true to alignment and gradient including labour charges and all incidental and operational charges to work site etc., as directed by departmental officers. For 150mm dia DI K7 Pipes
23 Laying of 250/150/100mm dia DI line distribution --- 170.00 One Rmt 157.00 26690.00
Lowering the CI/DI(K7) Pipes and specials S/S ends LA class excluding cost of CI pipes specials and carefully into the pipeline trenches and laying them true to alignment and gradient including labour charges and all incidental and operational charges to work site etc., as directed by departmental officers. For 250mm dia DI K7 Pipes
24 Laying of 250/150/100mm dia DI line distribution --- 93.59 One Cum 3124.00 292375.16
RBR -FNDN-1 Excavation in Hard rock (blasting prohibited) with benching, chiselling and wedging such as hard rock, sheet rock and boulders in habitant areas where controlled blasting can not be done with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and excluding backfilling for pipeline trenches for laying sewer/ Water supply lines / Foundations including all incidental and operational charges etc., complete.
25 Laying of 250/150/100mm dia DI line distribution --- 842.28 One Cum 343.00 288902.04
Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, soft disintegrated rock,hard disintegrated rock,Conglomerated rock , stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and excluding backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete..
26 Laying of 250/150/100mm dia DI line distribution --- 1231.50 One Rmt 128.69 158481.73
Barricading, bording, lighting & watching etc for water supply & sewerage works for trenches of depths upto 2m below ground level.
27 Laying of 250/150/100mm dia DI line distribution --- 23.84 One MT 1215.00 28965.60
Conveyance of following dia Ductile iron (K7) Pipes from departmental stores at Hydernagar to work site including loading, unloading stacking at site and watch and ward at site as directed by department officers including all incidental &operational charges etc complete.
28 Laying of 250/150/100mm dia DI line distribution --- 54.00 One Cum 1342.00 72468.00
Cutting Open BT Road surface ( as well as asphalt concrete up to 75mm thick ) including water bound macadam and stacking excavated materials including all initial leads and lifts and conveyance of all materials labour charges and other incidental & operational charges, tools & plants etc for pipe line trenches. By manual Means
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail