| 1 | 1 | Field Investigation | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.1 | Drilling of bore hole in all types of strata. | BI01010001010000000000000515BI0100001113 | | |
|---|
| 3 | 1.11 | a) G.L. to 10 m | BI01010001010000000000000515BI0100001114 | 40 | M |
|---|
| 4 | 1.12 | b) 10 to 20 m | BI01010001010000000000000515BI0100001115 | 10 | M |
|---|
| 5 | 1.13 | c) more than 20 m | BI01010001010000000000000515BI0100001116 | 10 | M |
|---|
| 6 | 1.2 | Drilling in rock required cutting by diamond bits / cutters | BI01010001010000000000000515BI0100001117 | | |
|---|
| 7 | 1.21 | a) In weathered rock | BI01010001010000000000000515BI0100001118 | 75 | M |
|---|
| 8 | 1.22 | b) In hard rock | BI01010001010000000000000515BI0100001119 | 75 | M |
|---|
| 9 | 1.3 | Carry out SPT tests | BI01010001010000000000000515BI0100001120 | 40 | Nos |
|---|
| 10 | 1.4 | Collecting disturbed samples | BI01010001010000000000000515BI0100001121 | 40 | Nos |
|---|
| 11 | 1.5 | Collecting Undisturbed samples | BI01010001010000000000000515BI0100001122 | 30 | Nos |
|---|
| 12 | 1.6 | Conducting Permeability test | BI01010001010000000000000515BI0100001123 | | |
|---|
| 13 | 1.61 | a) In over burden using falling head | BI01010001010000000000000515BI0100001124 | 2 | Nos |
|---|
| 14 | 1.62 | b) In Rock with Packers | BI01010001010000000000000515BI0100001125 | 1 | Nos |
|---|
| 15 | 1.7 | Collecting water samples | BI01010001010000000000000515BI0100001126 | 15 | Nos |
|---|
| 16 | 2 | LABORATOTORY TEST | BI01010001010000000000000515BI0100001127 | | |
|---|
| 17 | 2.1 | Soil Samples | BI01010001010000000000000515BI0100001128 | | |
|---|
| 18 | 2.11 | Sieve analysis | BI01010001010000000000000515BI0100001129 | 40 | Nos |
|---|
| 19 | 2.12 | Hydrometer analysis | BI01010001010000000000000515BI0100001130 | 40 | Nos |
|---|
| 20 | 2.13 | Specific Gravity | BI01010001010000000000000515BI0100001131 | 40 | Nos |
|---|
| 21 | 2.14 | Moisture Content | BI01010001010000000000000515BI0100001132 | 40 | Nos |
|---|
| 22 | 2.15 | Dry density | BI01010001010000000000000515BI0100001133 | 30 | Nos |
|---|
| 23 | 2.16 | Atterberg Limits | BI01010001010000000000000515BI0100001134 | 40 | Nos |
|---|
| 24 | 2.17 | Direct Shear Tests. | BI01010001010000000000000515BI0100001135 | 30 | Nos |
|---|
| 25 | 2.18 | Traixial Shear Test | BI01010001010000000000000515BI0100001136 | 30 | Nos |
|---|
| 26 | 2.19 | Chemical Analysis | BI01010001010000000000000515BI0100001137 | | |
|---|
| 27 | 2.191 | a) Soil | BI01010001010000000000000515BI0100001138 | 15 | Nos |
|---|
| 28 | 2.192 | b) Water | BI01010001010000000000000515BI0100001139 | 15 | Nos |
|---|
| 29 | 2.2 | Rock Samples | BI01010001010000000000000515BI0100001140 | | |
|---|
| 30 | 2.21 | Density tests | BI01010001010000000000000515BI0100001141 | 15 | Nos |
|---|
| 31 | 2.22 | Water absorption and Porosity | BI01010001010000000000000515BI0100001142 | 15 | Nos |
|---|
| 32 | 2.23 | Determination of Hardness | BI01010001010000000000000515BI0100001143 | 15 | Nos |
|---|
| 33 | 2.24 | Unconfined compression tests | BI01010001010000000000000515BI0100001144 | 15 | Nos |
|---|
| 34 | 2.25 | Carry out point load index | BI01010001010000000000000515BI0100001145 | 15 | Nos |
|---|
| 35 | 2.26 | Modulus of elasticity | BI01010001010000000000000515BI0100001146 | 15 | Nos |
|---|
| 36 | 2.27 | Abrasion Testing | BI01010001010000000000000515BI0100001147 | 15 | Nos |
|---|
| 37 | 3 | Report | BI01010001010000000000000515BI0100001148 | | |
|---|
| 38 | 3.1 | Provide final report 1 set (7 copies) | BI01010001010000000000000515BI0100001149 | 1 | Nos |
|---|