Municipal Corporation-MC has published Balance Work Of Path From Pwd Main Road To Jhimbu Ram House And Foot Path To Asha Rani House And Other In Ward No . 17 Balance Work Of Path From Pwd Main Road To Jhimbu Ram House And Foot Path To Asha Rani House And Other In Ward No . 17 Sub Head - P/L . Submission Date for this Tender is 08-10-2020. Road Work Tenders in Dharamshala Himachal Pradesh. Bidders can get complete Tender details and download the document.
Name of Work-:-Name of work:- Balance work of Path from PWD main road to Jhimbu Ram house & foot path to Asha Rani house & other in Ward No.17 (Sub head :- P/L inter locking paver block , CC work from RD 0/08 to 0/096 | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Excavation in foundations, trenches etc., in earth work, lift upto 1.50 Metres stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15cm. layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres. Pick Work. and jumper work including carriage of material in all leads and lift and direction of Engineer-in-charge. | 84.32 | Per Cubic meter | |
2 | 2 | Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x5mm. so as to give a fair finish including centring, shuutering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of the same for in situ-reinforced concrete & plain concrete work in Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters buttresses, plinth and string courses and the like including carriage of material in all leads and lifts as per direction of engineer- incharg | 35.2 | Per Square meter | |
3 | 3 | Stone soling propely hand packed under the floor. including carriage of material in all leads and lifts as per direction of engineer- incharg | 44.64 | Per Cubic meter | |
4 | 4 | Providing and laying cement concrete 1:6:12 (1cement:6sand:12graded stone aggregate 40mm nominal size) excluding cost of centring and shuttering in: Foundations and plinth: Cu.M including carriage of material in all leads and lifts as per direction of engineer- incharg | 19.84 | Per Cubic meter | |
5 | 5 | Providing and laying cement concrete 1:2:4 (1cement:2sand:4graded stone aggregate 20mm nominal size) excluding cost of centring and shuttering in: Foundations and plinth: Cu.M. including carriage of material in all leads and lifts as per direction of engineer- incharg | 19.84 | Per Cubic meter | |
6 | 6 | Providing and laying heavy dutyprecast cement conrete inter lockingpaver blocks vibro compacted upto M-50 grade i/c border or kurb block greyor coloured over sub-base of concretewith 25mm thick average thickness ofcement mortar 1:4 (1 cement : 4sand) laid over and jointed with neatcement slurry mixed with pigment tomatch the shade of blocks i/c curingrubbing & polishing complete (Subbase concrete floor to be paid for 60mm thick inter locking blocks including carriage of material in all leads and lifts as per direction of engineer- incharg | 198.42 | Per Square meter |