National Aluminium Company Limited-NALCO has published Miscellaneous Repair / Maintenance Of Various Mobile Equipments / Vehicles In Mobile Equipment Shop Of Smelter Plant ( For Package-A ). Submission Date for this Tender is 19-10-2020. Spare Part Tenders in MES SMELTER PLANT, NALCO, ANGUL. Odisha. Bidders can get complete Tender details and download the document.
Name of Work: Miscellaneous Repair / Maintenance of Various Mobile Equipments / Vehicles in Mobile Equipment Shop of Smelter Plant (For Package-A). | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | ATV cabin Leaf spring repair | BI01010001010000000000000515BI0100001113 | 2 | SET |
2 | 2 | ATV cabin Leaf spring repair with supply | BI01010001010000000000000515BI0100001114 | 2 | SET |
3 | 3 | ATV reduction gearbox opening/fitting | BI01010001010000000000000515BI0100001115 | 4 | NO |
4 | 4 | ATV pallet carrier widening repair wrk | BI01010001010000000000000515BI0100001116 | 2 | NO |
5 | 5 | ATV cabin Removing / fitting work | BI01010001010000000000000515BI0100001117 | 2 | NO |
6 | 6 | ATV cabin opening/ fitting with supply | BI01010001010000000000000515BI0100001118 | 2 | NO |
7 | 7 | ATV Pallet lifting frame opening/fitting | BI01010001010000000000000515BI0100001119 | 8 | NO |
8 | 8 | ATV Pallet lifting frame denting work | BI01010001010000000000000515BI0100001120 | 2 | NO |
9 | 9 | ATV pallet bar opening/fitting | BI01010001010000000000000515BI0100001121 | 2 | NO |
10 | 10 | Pivot assembly opening /fitting work | BI01010001010000000000000515BI0100001122 | 2 | NO |
11 | 11 | ATV Steering arm opening/ fitting | 2 | NO | |
12 | 12 | ATV Steering cylinder pin fitting | 2 | NO | |
13 | 13 | On-site Door lock repair work | 154 | NO | |
14 | 14 | On-Site Door lock repair with supply | 6 | NO | |
15 | 15 | MTPM,CBPM, PFT, Tipper Cabin/fitting | 4 | NO | |
16 | 16 | Leaf spring repair | 46 | SET | |
17 | 17 | Leaf spring repair with supply | 8 | SET | |
18 | 18 | Hub servicing / replacement | 44 | NO | |
19 | 19 | Hub servicing /repl. with minor supply | 24 | NO | |
20 | 20 | Hub servicing / repl. with major supply | 26 | NO | |
21 | 21 | New stud fitting in hubs | 62 | NO | |
22 | 22 | GMAW Linear welding - up to 8 mm | 9015 | Foot | |
23 | 23 | GMAW Linear welding - 9 to 16 mm | 746.9 | Foot | |
24 | 24 | GMAW Linear welding - 17 to 32 mm | 2420 | Foot | |
25 | 25 | Linear ARC welding - up to 8mm | 1064.5 | Foot | |
26 | 26 | Linear ARC welding - up to 8mm- Outside | 163 | Foot | |
27 | 27 | Linear cutting - up to 8 mm | 10420 | Foot | |
28 | 28 | Linear cutting - 9 mm to 16 mm | 1009.9 | Foot | |
29 | 29 | Linear cutting - 17 mm to 32 mm | 2430 | Foot | |
30 | 30 | Gas welding/brazing | 299.58 | Foot | |
31 | 31 | Linear gouging - up to 8mm | 36 | Foot | |
32 | 32 | Linear gouging - 9 mm to 16mm | 11 | Foot | |
33 | 33 | Linear gouging - 17 mm to 32 mm | 37.96 | Foot | |
34 | 34 | Fabrication of misc items | 18 | Tonne | |
35 | 35 | Denting of vehicle bodies(below 5mm) | 1756 | Square foot | |
36 | 36 | Denting of vehicle bodies(above 5mm) | 524.82 | Square foot | |
37 | 37 | Aluminium/Fiber body riveting work | 142 | Square foot | |
38 | 38 | Scrapping of vehicle bodies | 8290 | Square foot | |
39 | 39 | Grinding of metal bodies | 1715.32 | Square foot | |
40 | 40 | Putty finishing | 5280 | Square foot | |
41 | 41 | Primer coating | 19743.2 | Square foot | |
42 | 42 | Automotive painting | 19187.2 | Square foot | |
43 | 43 | Painting of oil water separators | 2 | NO | |
44 | 44 | Painting of Vehicle washing floor | 2 | NO | |
45 | 45 | Painting of drains | 2 | Meter | |
46 | 46 | Cutting of Fiber glass | 1464.9 | Square foot | |
47 | 47 | Fitting of glass | 1463.96 | Square foot | |
48 | 48 | Fitting of glass with beading supply | 661 | Square foot | |
49 | 49 | Pasting of glass with supply of paste | 110 | Square foot | |
50 | 50 | Fitting of glass with glass,beading sup. | 214 | Square foot | |
51 | 51 | Heat resistant glass fitting with supply | 2 | Square foot | |
52 | 52 | Punching of chassis numbers (1/2") | 2 | NO | |
53 | 53 | Washing of 3T,5T Forklifts | 3810 | NO | |
54 | 54 | Washing of 3T,5T FLT with cleaning agent | 450 | NO | |
55 | 55 | Washing of 7T,8T,10T, Forklifts | 1750 | NO | |
56 | 56 | Washing of 7T,8T,10T FLT incl. Cl Agt | 730 | NO | |
57 | 57 | Washing of ATV, MTPM,CBPM, PL. | 1048 | NO | |
58 | 58 | Washing of ATV,MTPM,CBPM, PL-incl.CL agt | 294 | NO | |
59 | 59 | Washing of Excavator | 6 | NO | |
60 | 60 | Washing of Excavator with cleaning agent | 2 | NO | |
61 | 61 | Washing of 407,709 Trucks, BEML, Trailer | 16 | NO | |
62 | 62 | Washing-407,709 Trucks, BEML-incl.Cl agt | 2 | NO | |
63 | 63 | Eng oil change of water servicing pump | 8 | NO | |
64 | 64 | Servicing water hose fitting | 8 | NO | |
65 | 65 | Work assist in repair of water servicing | 4 | Hour | |
66 | 66 | Broken stud removal | 732 | NO | |
67 | 67 | Scraping of pneumatic tyres,tubes &flaps | 32 | Trip | |
68 | 68 | Scraping of Solid tyre | 18 | Trip | |
69 | 69 | Scraping of Waste Oil barrels | 8 | Trip | |
70 | 70 | Scraping of Metallic scraps | 32 | Trip | |
71 | 71 | Collection of Waste Oil | 8 | NO | |
72 | 72 | Collection rejected filters | 2 | Trip | |
73 | 73 | Scraping of empty barrels | 12 | Trip | |
74 | 74 | collection of rejected spares | 2260 | Kilogram | |
75 | 75 | Operation of Floor Scrubbing machine | 224594 | Square meter | |
76 | 76 | Replacement of Scrubbing brushes | 18 | NO | |
77 | 77 | Spreading of saw dust over oily areas | 110403 | Square foot | |
78 | 78 | Cleaning of bins | 46 | NO | |
79 | 79 | Removal of hazard waste | 2 | Trip | |
80 | 80 | Shop floor sweeping | 1.72554e+06 | Square meter | |
81 | 81 | Cleaning of oil water separator tank. | 18 | NO | |
82 | 82 | Cleaning of drains | 6011 | Meter | |
83 | 83 | Number and letter writing Sz: 6" | 2874 | NO | |
84 | 84 | Number and letter writing Sz: 3" | 4152 | NO | |
85 | 85 | Assistance in printing of forms | 24 | NO | |
86 | 86 | Assistance in supply of consumables | 26 | NO | |
87 | 87 | Steel mat. transp. - From steel yard | 22 | Metric Tonne | |
88 | 88 | Work assistance in general shift | 11362 | Man Days | |
89 | 89 | Extra Man-hour for USW-Beyod working Hr | 1708 | Hour | |
90 | 90 | Extra Man-hour for SW-Beyond working Hr | 46 | Hour | |
91 | 91 | Making of new seat | 52 | Square foot | |
92 | 92 | Making of new seat for Bolero front | 1 | SET | |
93 | 93 | Making of new seat for Bolero rear(4pie) | 1 | SET | |
94 | 94 | Making of new M&M van driver seat & back | 1 | SET | |
95 | 95 | Making of new seat for Rajood,Hero Honda | 1 | SET | |
96 | 96 | Making of new seat for ATV | 6 | SET | |
97 | 97 | Making of new seat for MTPM/CBPM | 5 | SET | |
98 | 98 | Making of new seat for two pieceForklift | 132 | SET | |
99 | 99 | Making of new seat for two piece TATA BU | 16 | SET | |
100 | 100 | Making of new seat for two Seater Bus | 13 | SET | |
101 | 101 | Making of new seat for three seater Bus | 33 | SET | |
102 | 102 | Supply of good quality 12mms ply wood | 607.82 | Square foot | |
103 | 103 | Making of new hood for Tata-709 | 2 | Each | |
104 | 104 | Making of new hood for tractor | 2 | Each | |
105 | 105 | Making of new roof ceiling | 2 | Square foot | |
106 | 106 | Making of new door pad | 2 | Square foot | |
107 | 107 | Hydra rope fitting | 10 | NO | |
108 | 108 | Oil water separator operation | 48 | NO | |
109 | 109 | Wet scrubbing | 28800 | Square meter | |
110 | 110 | Enamel painting | 1000 | Square foot | |
111 | 111 | Transportation of seats | 12 | Each | |
112 | Total in Figures |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail