| 1 | 1 | APPENDIX A CULVERT CONSTRUCTION | BI01010001010000000000000515BI0100001113 | | |
|---|
| 2 | 1.001 | 11.1.1.1 : Excavation for StructuresEarthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.I.Ordinary soil(i)Upto 3 m depth | BI01010001010000000000000515BI0100001114 | 5.544 | cum |
|---|
| 3 | 1.002 | 11.4.1.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203I.P.C.C grade M 10(i)Nominal mix 1:3:6 | BI01010001010000000000000515BI0100001115 | 5.544 | cum |
|---|
| 4 | 1.003 | 11.4.2.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 II.P.C.C grade M 15(i)Nominal mix (1:2.5:5) | BI01010001010000000000000515BI0100001116 | 6.24 | cum |
|---|
| 5 | 1.004 | 11.4.4 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203IV.R.C.C grade M 20 | BI01010001010000000000000515BI0100001117 | 3.15 | cum |
|---|
| 6 | 1.005 | 11.8 : Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | BI01010001010000000000000515BI0100001118 | 0.683 | tonne |
|---|
| 7 | 1.006 | od756998/2020_2021 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203r|nIV.R.C.C grade M 20 | BI01010001010000000000000515BI0100001119 | 0.45 | cum |
|---|
| 8 | 1.007 | 14.1 : Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301 | BI01010001010000000000000515BI0100001120 | 1.8 | cum |
|---|
| 9 | 1.008 | 3.3 : Construction of Embankment with Material Obtained from Roadway Cutting\t\t<br>\t\nConstruction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | BI01010001010000000000000515BI0100001121 | 2.4 | cum |
|---|
| 10 | 1.009 | od757483/2020_2021 : Construction of Embankment with Material Obtained from Borrow Pits<br><br>Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting by ramming<br> | BI01010001010000000000000515BI0100001122 | 8.1 | cum |
|---|
| 11 | 1.01 | 10.5 : Painting Two Coats on New Concrete SurfacesPainting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701 | BI01010001010000000000000515BI0100001123 | 8.75 | sqm |
|---|
| 12 | 1.011 | od757186/2020_2021 : Supplying and fixing of GI name board as per directed | BI01010001010000000000000515BI0100001124 | 1 | each |
|---|