Setting Up Of Hydrogen Production System And Dispensing Station For Refueling Hydrogen Vehicles , Supply , Pem Electrolyzer: Minimum Capacity Of 45 Nm3/Hr Capacity As Per The Scope Defined In The Tender Specifications ( Annexure-3 ) , Alkaline Electrolyzer: Minimum 45 Nm3/Hr Capacity As Per The Scope Defined In The Tender Specifications ( Annexure-3 ) , Solid Oxide Electrolyzer: Minimum 5 Nm3/Hr Capacity As Per The Scope Defined In The Tender Specifications ( Annexure-3 ) , Buffer Vessel: Minimum 3000 Litres Water Capacity As Per The Scope Defined In The Tender Specifications ( Annexure-3 ) , Hydrogen Compressor: Minimum 95 Nm3/Hr Capacity As Per The Scope Defined In The Tender Specifications ( Annexure-3 ) , High Pressure Hydrogen Storage-Type I: Minimum 4000 Liters Water Capacity As Per The Scope Defined In The Tender Specifications ( Annexure-3 ) , High Pressure Hydrogen Storage-Type Iii: Minimum 1500 Liters Water Capacity As Per The Scope Defined In The Tender Specifications ( Annexure-3 ) , High Pressure Hydrogen Storage-Type Iv: Minimum 1500 Liters Water Capacity As Per The Scope Defined In The Tender Specifications ( Annexure-3 ) , 2 Dispensers , Each Having 2 Nozzles , 350 Bar Dispensing As Per The Scope Defined In The Tender Specifications ( Annexure-3 ) , Dm Water Plant As Per The Scope Defined In The Tender Specifications ( Annexure-3 ) , Regulatory Approvals , Remote Monitoring Features Etc . As Per The Scope Defined In The Tender Specifications ( Annexure-3 ) , Integration Of The Whole System As Per The Scope Defined In The Tender Specifications ( Annexure-3 ) , Onsite Activities , Onsite Activities Of Installation , Commissioning , Training And Site Acceptance Test As Per The Scope Defined In The Tender Specifications ( Annexure-3 )
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 29-Sep-2020 | Technical_Corrigendum | Technical Bid | 16-Oct-2020 |
| 2 | 16-Oct-2020 | Date extended | Date | 23-Oct-2020 |
BOQ
| Name of Work: Setting up of Hydrogen Production System and Dispensing Station for Refueling Hydrogen Vehicles | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Supply | Item1 | ||
| 2 | 1.01 | PEM Electrolyzer: Minimum capacity of 45 Nm3/hr capacity as per the scope defined in the tender specifications (Annexure-3) | Item2 | 1 | Nos |
| 3 | 1.02 | Alkaline Electrolyzer: Minimum 45 Nm3/hr capacity as per the scope defined in the tender specifications (Annexure-3) | Item3 | 1 | Nos |
| 4 | 1.03 | Solid Oxide Electrolyzer: Minimum 5 Nm3/hr capacity as per the scope defined in the tender specifications (Annexure-3) | Item4 | 1 | Nos |
| 5 | 1.04 | Buffer vessel: minimum 3000 litres water capacity as per the scope defined in the tender specifications (Annexure-3) | Item5 | 1 | Nos |
| 6 | 1.05 | Hydrogen compressor: Minimum 95 Nm3/hr capacity as per the scope defined in the tender specifications (Annexure-3) | Item6 | 1 | Nos |
| 7 | 1.06 | High pressure hydrogen storage-Type I: Minimum 4000 Liters Water capacity as per the scope defined in the tender specifications (Annexure-3) | Item7 | 1 | Nos |
| 8 | 1.07 | High pressure hydrogen storage-Type III: Minimum 1500 Liters Water capacity as per the scope defined in the tender specifications (Annexure-3) | Item8 | 1 | Nos |
| 9 | 1.08 | High pressure hydrogen storage-Type IV: Minimum 1500 Liters Water capacity as per the scope defined in the tender specifications (Annexure-3) | Item9 | 1 | Nos |
| 10 | 1.09 | 2 dispensers, each having 2 nozzles, 350 bar dispensing as per the scope defined in the tender specifications (Annexure-3) | Item10 | 1 | Nos |
| 11 | 1.1 | DM water plant as per the scope defined in the tender specifications (Annexure-3) | Item11 | 1 | Nos |
| 12 | 1.11 | Regulatory Approvals, Remote Monitoring Features etc. as per the scope defined in the tender specifications (Annexure-3) | item12 | 1 | Nos |
| 13 | 1.12 | Integration of the whole system as per the scope defined in the tender specifications (Annexure-3) | Item13 | 1 | Nos |
| 14 | 2 | Onsite Activities | Item14 | ||
| 15 | 2.01 | Onsite Activities of installation, commissioning, training and Site Acceptance Test as per the scope defined in the tender specifications (Annexure-3) | Item15 | 1 | Lumpsum |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender