| 1 | Durga Bhavani nagar | Standard Specification | 19.88 | cum | 132.40 | 2632.11 |
| Carting away the surplus excavated materials such as rock / earth the site to a suitable distance of about 10 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges all leads and lifts all other incidental and operational charges etc complete as directed by the HMWSSB Engineers |
| 2 | Durga Bhavani nagar | Standard Specification | 13.62 | cum | 923.00 | 12571.26 |
| Supply, delivery and filling quarry dust wherever required as directed by the Deptl officers including cost and conveyance of quarry dust stacking levelling, watering and tamping, rolling all leads labour charges and other incidental and operational charges etc complete as directed by the HMWSSB Engineers |
| 3 | Durga Bhavani nagar | Standard Specification | 62.65 | cum | 34.90 | 2186.48 |
| Refilling the pipe line trenches with using excavated soils other than sand with standard specification including watering and tamping in layers of 225mm etc., complete to the finished item as directed by the H.M.W.S.&.S. Board Engineers. |
| 4 | Durga Bhavani nagar | Standard Specification | 16.00 | One Hp Hr | 264.00 | 4224.00 |
| Bailing out of water including hire charges of diesel pump set, fuel and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers. |
| 5 | Durga Bhavani nagar | Standard Specification | 2.00 | Each | 7411.00 | 14822.00 |
| Supply and delivery fixing of RCC precast manholes chambers having the size of 36\" at bottom tappering to 21\"dia at top fixing in CC 1:4:8 prop along with FRC cover and frame laying CC 1:2:4 prop including cost of materials labour charges earth work curing conveyance etc complete as directed by the HMWSSB Engineers |
| 6 | Durga Bhavani nagar | Standard Specification | 7.80 | Rmt | 423.00 | 3299.40 |
| Supply, laying jointing and testing 100mm SWG 1st class pipes with airtight cement joints in CM 1:5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) upto 3? depth and refilling with watering and tamping etc., complete as directed by the H.M.W.S.&.S. Board Engineers. |
| 7 | Durga Bhavani nagar | Standard Specification | 33.00 | Rmt | 201.00 | 6633.00 |
| Supply, Laying and jointing of 15mm dia MDPE pipes including fitting cost and conveyance of all materials including all other incidental and operation charges etc., complete as directed by the HMWS&SB Engineer. |
| 8 | Durga Bhavani nagar | Standard Specification | 15.00 | Each | 80.00 | 1200.00 |
| Drilling and tapping CI/DI main and fixing of brass scrue and required etc., complete as directed by the HMWS&SB Engineer. |
| 9 | Durga Bhavani nagar | Standard Specification | 2.00 | Each | 4485.00 | 8970.00 |
| Making dummy arrangement to 200mm dia DI and CI including cost of CI socket tail piece with MS dummy plate and of pig lead spun yarn and cost of jointing material and all labour charges etc complete as directed by the HMWSSB Engineers |
| 10 | Durga Bhavani nagar | Standard Specification | 4.00 | Each | 267.00 | 1068.00 |
| Jointing DI/CI pipes and fittings with S/S ends excluding cost of jointing materials such as lead wool and hump yarn but including cost of sundries such as cost of fuel for melting lead, filling with water lead upto 500mtrs and tested to required pressure , incidental and operational charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers. |
| 11 | Durga Bhavani nagar | Standard Specification | 4.00 | Each | 399.00 | 1596.00 |
| Jointing CI/DI 150mm dia pipes and valaves with Flanged ends including the cost of jointing material such as bolts, nuts, rubber insertion white lead and including filling with a water lead upto 500m and testing to required pressure etc. complete as directed by the H.M.W.S.&.S. Board Engineers. |
| 12 | Durga Bhavani nagar | Standard Specification | 2.00 | Each | 233.00 | 466.00 |
| Labour charges for lowering and keeping in position 150mm dia D.I. Sluice valves including cost and conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers. |
| 13 | Durga Bhavani nagar | Standard Specification | 4.00 | Each | 209.00 | 836.00 |
| Cutting of 150mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers. |
| 14 | Durga Bhavani nagar | Standard Specification | 25.00 | Each | 166.00 | 4150.00 |
| Joitning 150mm dia CI/DI pipes of plain spigot modified socket end with rubber gaskets excluding the cost of rubber gasket but including all sundries filling with a water lead upto 500m and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers. |
| 15 | Durga Bhavani nagar | Standard Specification | 80.00 | Rmt | 80.00 | 6400.00 |
| Lowering the 150mm dia CI/DI pipes ( all classes) and specials (Fittings) with S/S ends carefully into the ready made trenches and laying them true to alignment and gradient including all labour charges, all operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers. |
| 16 | Durga Bhavani nagar | Standard Specification | 51.90 | cum | 343.00 | 17801.70 |
| Earth work excavation and depositing on banks with an initial lead of 10 m. and lift of 2 m in all available soils like red earth and ordinary gravel soils mixture of gravel and soft disintegrated rock, stoney earth and earth mixed with fair size boulders, SRD removable by pick axes and crow bars, stone matrix, hard disintegrated rock and conglomerate rock by pick axed and crowbars etc, complete for external staircase excluding dewatering for colomns and valve chambers including labour charges, all operational and incidental charges etc., complete as directed by the H.M.W.S.& S. Board Engineers. |
| 17 | Durga Bhavani nagar | Standard Specification | 160.00 | Rmt | 128.69 | 20590.40 |
| Barricading, hoarding, lighting and Watching etc., for water supply pipe (WS pipe) and sewerage line trenches etc., complete as directed by the HMWS&SB Engineers. |
| 18 | Durga Bhavani nagar | Standard Specification | 17.01 | cum | 2793.00 | 47508.93 |
| Cutting open C.C Road surface including labour charges all leads and other incidental and operational charges tool and plants etc. complete to the finished item of work as directed by the HMWS&SB Engineers. |
| 19 | Durga Bhavani nagar | Standard Specification | 1.82 | MT | 1215.00 | 2211.30 |
| Conveyance of pipes from the departmental stores to work site including loading, unloading and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers. (150mm dia pipes) |