| 1 | 1 | Excavation for foundation / pipeline trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50m and lifts as below, stacking and spreading as directed, manual dewatering, preparing the bed for foundation and excluding back filling etc. complete.\n | BI01010001010000000000000515BI0100001113 | 157.5 | cu.mt |
|---|
| 2 | 2 | Excavation for foundation / pipeline trenches in hard murum including removing the excavated material upto a distance 01 50m and lifts as below, stacking and spreading as directed, manual dewatering, preparing the bed for foundation and excluding back filling etc. complete. | | 157.5 | cu.mt |
|---|
| 3 | 3 | Filling in plinth floors murum bedding in trenches with murum from excavated material from foundation 15 to 20 cm layers including watering and complete.. | | 47.25 | cu.mt |
|---|
| 4 | 4 | Providing and supplying in standard length IS! mark rigid unpiasticised PVC pipes suitable for potable water with solvent cement joints including cost of couplers as per IS specification No.4985/I988 including all local and central taxes,transpoftatiC)fl. freight charges, inspection argcs,loading.unloading conceyancc to the departmental store / site and stacking the same in closed shade duly protected from sun rays and rains including cost of jointing material i.e. solvent cement etc.complctc.\nA) 75 mm dia.PVC 4KG/cm2 | | 450 | rmt |
|---|
| 5 | 5 | lowering,laying and jointing of P.V.C. pipe of following class and dia including all local and central taxes octroi, inspection charges, transportation to store etc.complete.\nA) 75 mm dia.PVC 4KG/cm2 | | 450 | rmt |
|---|
| 6 | 6 | Providing and fixing P.V.CJ G.I. specials of following class and dia including all taxes,freight charges,inspection charges, loand,unloading charges e.comp1ete.s1uice valve as per IS-780 and 2906-1984 | | 1 | job |
|---|
| 7 | 7 | Providing and fixing ISI mark CIDF sluice valves and Air valve of following class and dia including all taxes,freight charges, inspection charges,Ioand,unloading charges etc.complete.sluice valve as per !S-780 and 2906 -1984 \nA) 65mm dia sluice valve P.N.1 | | 3 | NO |
|---|
| 8 | 8 | laying and fixing ISI mark CIDF sluice valves and air valve of following class and dia including all taxes, freight charges , inspection charges, loand, unloading charges etc..complete.. A) 65mm dia sluice valve P.N.1 | | 3 | NO |
|---|
| 9 | 9 | Refilling the trenches with available excavated stuff with sofi tnaiczial first over pipe line and then hard material in 15 cm\nlayers with all leads and lits including\nconsolidation,surcharin elc.compclte.\n | | 265.76 | CUM |
|---|
| 10 | 10 | GST 12% | | 1 | NO |
|---|