Defence Statutory Bodies & Commissions/Committees Closing in 0 days TDR #25485635

Rendering Of Services For Water Supply Installations At New Leading Ph Sewage Ph Nofra Ph Under Age Em Ii Of Ge Nw Vasco 8292/E8

Issued by Statutory Bodies & Commissions/Committees · VASCO, Goa
Tender Value
23.40 Lakhs
Estimated cost
Bid Submission
08 Oct 2020
0 days left
EMD
46800
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
VASCO → Goa
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Rendering Of Services For Water Supply Installations At New Leading Ph Sewage Ph Nofra Ph Under Age Em Ii Of Ge Nw Vasco 8292/E8 , Rendering Services Round The Clock Ie Three Shifts Including Sunday And Holidays By One Skilled Operator Per Shift And Operation Of Water Supply Installations Including Connected Items Such As Valves Connected To Pumping Mains And Electrical Items Such As Main Switch , Starter , Electro Mechanical Dozing Equipment , Voltmeter , Ammeter , Panel Board All As Specified And Directed At Nofra Pump House Consisiting Of Electric Driven Pump Sets - 06 Nos , Dg Set 125 Kva - 01 No And 200 Kva - 01 No , Dosing Equipment And Panel Board - 02 Nos , Including Operation Of Submersible Pump Set By The Same Operator Near Nofra-I & Ii Approx 600 Mtrs Away From Pump House Including Removing Grass And Bushes , Cutting Branches Of Trees Growing In The Entire Area Of Water Supply Installation And Keep The Installation Neat And Clean Throughout The Period Of Contract All As Directed . , ( I ) Basic Wage , ( Ii ) Employers Contribution Towards Employees Provident Fund ( Epf ) Liability , ( Iii ) Contribution Towards Employees State Insurance Corporation ( Esic ) , ( Iv ) Contribution Towards Bonus , ( V ) Labour Welfare Cess ( Lwc ) , ( Vi ) Overhead And Profit , All As Per Item No . 1 . 00 Herein Before But 02 Shifts By One Skilled Operator Per Shift ( Ist Shift - 0400 - 1200 Hrs And Iind Shift 1200 - 2000 Hrs ) At Varunapuri Main Gate Sewage Pump House Connected With Electric Driven Pump Sets -03 Nos , Ug Sump -01 No And 25 Kva Dg Set - 01 No Etc , Also Operator Has To Clean Choked Pipelines Of Pump And Cleaning Of Impellar Of Pump All As Specified And Directed . One Pump Set Will Run At A Time . , ( I ) Basic Wage , ( Ii ) Employers Contribution Towards Employees Provident Fund ( Epf ) Liability , ( Iii ) Contribution Towards Employees State Insurance Corporation ( Esic ) , ( Iv ) Contribution Towards Bonus , ( V ) Labour Welfare Cess ( Lwc ) , ( Vi ) Overhead And Profit , All As Per Item No . 1 . 00 Herein Before But 02 Shifts By One Skilled Operator Per Shift ( Ist Shift - 0400 - 1200 Hrs Of Next Day And Iind Shift 2000 - 0400 Hrs ) At New Leading Pump House Connected With Electric Driven Pump Sets - 02 Nos , Ug Sump - 01 No , Oh Reservoir - 01 No And 20 Kva Dg Set -01 No , Including Operation Of Submersible Pump Set 01 No By The Same Operator Near Map - Ii Location Approx 300 Metres Away From The Pump House , Etc Complete All As Specified And Directed . One Pump Set Will Run At A Time . , ( I ) Basic Wage , ( Ii ) Employers Contribution Towards Employees Provident Fund ( Epf ) Liability , ( Iii ) Contribution Towards Employees State Insurance Corporation ( Esic ) , ( Iv ) Contribution Towards Bonus , ( V ) Labour Welfare Cess ( Lwc ) , ( Vi ) Overhead And Profit , Note For Item No 1 , 2 & 3 :- ( A ) 24 Hour Period Will Be Considered As A Day , Pump Set Shall Be Operated In Three Shifts Of 08 Hours Each I , E , 1St Shift 0600 To 1400 Hours , 2Nd Shift 1400 To 2200 Hours , And 3Rd Shift 2200 To 0600 Hours Of The Next Day As Directed . Contractor Shall Employ One Operator Per Shift . , ( B ) Daily Maintenance All As Per Manufacturers Instruction Including Greasing , Lubrications , Replacement Of Gland Ropes Etc , Including Area Cleaning Shall Be Included In The Rate Quoted . The Unit Rate Quoted Against Item Shall Deemed To Inclusive Of The Cost Of Items Required For Daily Maintenance Of Minor Nature And Any Repair To The Foot Valve System By Replacing The Leather Flap , Rubber Insertion , Nut & Bolts Etc . Operator Shall Maintain Maintaince Register For Each Installation Showing All Day To Day Maintaince / Activities Carried Out Daily . , ( C ) Log Sheet Showing Daily Running Hours And Maintenance Carried Out Ie Consumption Of Grease , Chlorine Chemical Granules , Lubricants , Dhpp Etc Shall Be Maintained By The Contractor In Their Installations And Same Will Be Checked By The Engr-In-Charge Periodically And Daily By Je . All Log Sheets / Maintaince Register Duly Signed By Operator And Contractor Shall Be Produced For Verification . , ( D ) Consumption Of Dhpp , Bleaching Powder / Chlorine Chemical Granules Will Be Regulated By The Deptt . However , Supply Of The Items Is Out Of The Scope Of Work And Dhpp ( Diesel ) Will Be Issued Under Sch B Free For Operating Dg Sets . ( E ) The Rate Quoted Shall Deemed To Be Inclusive Of Topping Up Of Battery Electrolyte , Cleaning Of Battery Terminals , Charging Of Batteries And Tightening Of Fan Belt , Fuel Cap If Required Etc All As Directed . ( F ) Pumps And Dg Sets Shall Be Operated By The Same Operators As Required And Directed . ( G ) Attendance Register And Duty Roaster Shall Be Maintained In Each Installation . ( H ) Water Testing Solution Shall Be Provided And Maintained At All Time In Each Installation . ( J ) Water Supply Installations & Dg Set Shall Be Operated By The Same Opertaor As Required/Directed . ( K ) The Dg Set Will Be Operated As And When Power Supply Failure Or As Directed .

BOQ

NAME OF WORK : RENDERING OF SERVICES FOR WATER SUPPLY INSTALLATIONS AT NEW LEADING P/H, SEWAGE P/H, NOFRA P/H UNDER AGE E/M - II OF GE (NW) VASCO.
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Rendering services round the clock ie Three Shifts including Sunday and Holidays by One Skilled Operator per shift and operation of water supply installations including connected items such as valves connected to pumping mains and electrical items such as main switch, starter, electro mechanical dozing equipment, voltmeter, ammeter, panel board all as specified and directed at NOFRA PUMP HOUSE consisiting of electric driven pump sets - 06 Nos, DG Set 125 KVA - 01 No and 200 KVA - 01 No, dosing equipment and panel board - 02 Nos, including operation of Submersible pump set by the same operator near NOFRA-I & II approx 600 mtrs away from pump house including removing grass and bushes, cutting branches of trees growing in the entire area of water supply installation and keep the installation neat and clean throughout the period of Contract all as directed.
21.01(i) Basic Wage11Per Month
31.02(ii) Employer's Contribution towards Employees Provident Fund (EPF) liability11Per Month
41.03(iii) Contribution towards Employees State Insurance Corporation (ESIC)11Per Month
51.04(iv) Contribution towards bonus11Per Month
61.05(v) Labour Welfare Cess (LWC)11Per Month
71.06(vi) Overhead and Profit11Per Month
82All as per item No. 1.00 herein before but 02 Shifts by One Skilled Operator per shift ( Ist shift - 0400 - 1200 hrs and IInd shift 1200 - 2000 hrs) at Varunapuri Main Gate Sewage Pump House connected with electric driven pump sets -03 Nos, UG Sump -01 No and 25 KVA DG Set - 01 No etc, also operator has to clean choked pipelines of pump and cleaning of impellar of pump all as specified and directed. One pump set will run at a time.
92.01(i) Basic Wage11Per Month
102.02(ii) Employer's Contribution towards Employees Provident Fund (EPF) liability11Per Month
112.03(iii) Contribution towards Employees State Insurance Corporation (ESIC)11Per Month
122.04(iv) Contribution towards bonus11Per Month
132.05(v) Labour Welfare Cess (LWC)11Per Month
142.06(vi) Overhead and Profit11Per Month
153All as per item No. 1.00 herein before but 02 Shifts by One Skilled Operator per shift (Ist shift - 0400 - 1200 hrs of next day and IInd shift 2000 - 0400 hrs) at New Leading pump house connected with electric driven pump sets - 02 Nos, UG Sump - 01 No, OH reservoir - 01 No and 20 KVA DG Set -01 No, including operation of submersible pump set 01 No by the same operator near MAP - II location approx 300 metres away from the pump house, etc complete all as specified and directed. One pump set will run at a time.
163.01(i) Basic Wage11Per Month
173.02(ii) Employer's Contribution towards Employees Provident Fund (EPF) liability11Per Month
183.03(iii) Contribution towards Employees State Insurance Corporation (ESIC)11Per Month
193.04(iv) Contribution towards bonus11Per Month
203.05(v) Labour Welfare Cess (LWC)11Per Month
213.06(vi) Overhead and Profit11Per Month
224Note for item No 1, 2 & 3 :- \n(a) 24 hour period will be considered as a day, pump set shall be operated in three shifts of 08 hours each i,e, 1st shift 0600 to 1400 hours, 2nd shift 1400 to 2200 hours, and 3rd shift 2200 to 0600 hours of the next day as directed. Contractor shall employ one operator per shift. \n
234.01(b) Daily maintenance all as per manufacturer's instruction including greasing, lubrications, replacement of gland ropes etc, including area cleaning shall be included in the rate quoted. The unit rate quoted against item shall deemed to inclusive of the cost of items required for daily maintenance of minor nature and any repair to the foot valve system by replacing the leather flap, rubber insertion, nut & bolts etc. Operator shall maintain maintaince register for each installation showing all day to day maintaince / activities carried out daily.
244.02(c) Log sheet showing daily running hours and maintenance carried out ie consumption of grease, chlorine chemical granules, lubricants, DHPP etc shall be maintained by the contractor in their installations and same will be checked by the Engr-in-charge periodically and daily by JE. All log sheets / maintaince register duly signed by operator and contractor shall be produced for verification.
254.03(d) Consumption of DHPP, bleaching powder / chlorine chemical granules will be regulated by the deptt. However, supply of the items is out of the scope of work and DHPP (Diesel) will be issued under Sch 'B' free for operating DG sets.\n(e) The rate quoted shall deemed to be inclusive of topping up of battery electrolyte, cleaning of battery terminals, charging of batteries and tightening of fan belt, fuel cap if required etc all as directed.\n(f) Pumps and DG sets shall be operated by the same operators as required and directed.\n(g) Attendance register and duty roaster shall be maintained in each installation.\n(h) Water testing solution shall be provided and maintained at all time in each installation.\n(j) Water supply installations & DG set shall be operated by the same opertaor as required/directed. \n(k) The DG set will be operated as and when power supply failure or as directed. \n

AI Tender Summary

OUR REF NO 25485635
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 23.40 Lakhs
LAST DATE 08-10-2020
Authority
Authority Name Military Engineer Services
Work Description Rendering Of Services For Water Supply Installations At New Leading Ph Sewage Ph Nofra Ph Under Age Em Ii Of Ge Nw Vasco 8292/E8 , Rendering Services Round The Clock Ie Three Shifts Including Sunday And Holidays By One Skilled Operator Per Shift And Operation Of Water Supply Installations Including Connected Items Such As Valves Connected To Pumping Mains And Electrical Items Such As Main Switch , Starter , Electro Mechanical Dozing Equipment , Voltmeter , Ammeter , Panel Board All As Specified And Directed At Nofra Pump House Consisiting Of Electric Driven Pump Sets - 06 Nos , Dg Set 125 Kva - 01 No And 200 Kva - 01 No , Dosing Equipment And Panel Board - 02 Nos , Including Operation Of Submersible Pump Set By The Same Operator Near Nofra-I & Ii Approx 600 Mtrs Away From Pump House Including Removing Grass And Bushes , Cutting Branches Of Trees Growing In The Entire Area Of Water Supply Installation And Keep The Installation Neat And Clean Throughout The Period Of Contract All As Directed . , ( I ) Basic Wage , ( Ii ) Employers Contribution Towards Employees Provident Fund ( Epf ) Liability , ( Iii ) Contribution Towards Employees State Insurance Corporation ( Esic ) , ( Iv ) Contribution Towards Bonus , ( V ) Labour Welfare Cess ( Lwc ) , ( Vi ) Overhead And Profit , All As Per Item No . 1 . 00 Herein Before But 02 Shifts By One Skilled Operator Per Shift ( Ist Shift - 0400 - 1200 Hrs And Iind Shift 1200 - 2000 Hrs ) At Varunapuri Main Gate Sewage Pump House Connected With Electric Driven Pump Sets -03 Nos , Ug Sump -01 No And 25 Kva Dg Set - 01 No Etc , Also Operator Has To Clean Choked Pipelines Of Pump And Cleaning Of Impellar Of Pump All As Specified And Directed . One Pump Set Will Run At A Time . , ( I ) Basic Wage , ( Ii ) Employers Contribution Towards Employees Provident Fund ( Epf ) Liability , ( Iii ) Contribution Towards Employees State Insurance Corporation ( Esic ) , ( Iv ) Contribution Towards Bonus , ( V ) Labour Welfare Cess ( Lwc ) , ( Vi ) Overhead And Profit , All As Per Item No . 1 . 00 Herein Before But 02 Shifts By One Skilled Operator Per Shift ( Ist Shift - 0400 - 1200 Hrs Of Next Day And Iind Shift 2000 - 0400 Hrs ) At New Leading Pump House Connected With Electric Driven Pump Sets - 02 Nos , Ug Sump - 01 No , Oh Reservoir - 01 No And 20 Kva Dg Set -01 No , Including Operation Of Submersible Pump Set 01 No By The Same Operator Near Map - Ii Location Approx 300 Metres Away From The Pump House , Etc Complete All As Specified And Directed . One Pump Set Will Run At A Time . , ( I ) Basic Wage , ( Ii ) Employers Contribution Towards Employees Provident Fund ( Epf ) Liability , ( Iii ) Contribution Towards Employees State Insurance Corporation ( Esic ) , ( Iv ) Contribution Towards Bonus , ( V ) Labour Welfare Cess ( Lwc ) , ( Vi ) Overhead And Profit , Note For Item No 1 , 2 & 3 :- ( A ) 24 Hour Period Will Be Considered As A Day , Pump Set Shall Be Operated In Three Shifts Of 08 Hours Each I , E , 1St Shift 0600 To 1400 Hours , 2Nd Shift 1400 To 2200 Hours , And 3Rd Shift 2200 To 0600 Hours Of The Next Day As Directed . Contractor Shall Employ One Operator Per Shift . , ( B ) Daily Maintenance All As Per Manufacturers Instruction Including Greasing , Lubrications , Replacement Of Gland Ropes Etc , Including Area Cleaning Shall Be Included In The Rate Quoted . The Unit Rate Quoted Against Item Shall Deemed To Inclusive Of The Cost Of Items Required For Daily Maintenance Of Minor Nature And Any Repair To The Foot Valve System By Replacing The Leather Flap , Rubber Insertion , Nut & Bolts Etc . Operator Shall Maintain Maintaince Register For Each Installation Showing All Day To Day Maintaince / Activities Carried Out Daily . , ( C ) Log Sheet Showing Daily Running Hours And Maintenance Carried Out Ie Consumption Of Grease , Chlorine Chemical Granules , Lubricants , Dhpp Etc Shall Be Maintained By The Contractor In Their Installations And Same Will Be Checked By The Engr-In-Charge Periodically And Daily By Je . All Log Sheets / Maintaince Register Duly Signed By Operator And Contractor Shall Be Produced For Verification . , ( D ) Consumption Of Dhpp , Bleaching Powder / Chlorine Chemical Granules Will Be Regulated By The Deptt . However , Supply Of The Items Is Out Of The Scope Of Work And Dhpp ( Diesel ) Will Be Issued Under Sch B Free For Operating Dg Sets . ( E ) The Rate Quoted Shall Deemed To Be Inclusive Of Topping Up Of Battery Electrolyte , Cleaning Of Battery Terminals , Charging Of Batteries And Tightening Of Fan Belt , Fuel Cap If Required Etc All As Directed . ( F ) Pumps And Dg Sets Shall Be Operated By The Same Operators As Required And Directed . ( G ) Attendance Register And Duty Roaster Shall Be Maintained In Each Installation . ( H ) Water Testing Solution Shall Be Provided And Maintained At All Time In Each Installation . ( J ) Water Supply Installations & Dg Set Shall Be Operated By The Same Opertaor As Required/Directed . ( K ) The Dg Set Will Be Operated As And When Power Supply Failure Or As Directed .
Basic Detail
Tender No 8292/E8
Bidding Type Tender
Location
City VASCO
State Goa
Key Dates
Publish Date 18 Sep 2020
Submission Date 08 Oct 2020
Open Date 10 Oct 2020
Finance
Tender Value 23.40 Lakhs
Tender Fee 500
EMD 46800
Exemption Not Available
Document List
1A4D3735-85FA-4AAA-9B4E-BCDDD83B841B.html
Tendernotice_1.pdf
8292TenderDocumentsRe.pdf
BOQ_422496.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 18, 2020
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 08, 2020
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Oct 10, 2020

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

1A4D3735-85FA-4AAA-9B4E-BCDDD83B841B.html

pdf

Tendernotice_1.pdf

pdf

8292TenderDocumentsRe.pdf

xls

BOQ_422496.xls

TenderDetail
Loading tenders