Consultancy Services For Feasibility Study And Detailed Engineering For Rehabilitation And Up-Gradation Of Nh- 154A From Km 84 To 93 And 130 To 172 In The State Of Himachal Pradesh . , CHAMBA-Himachal Pradesh

Ministry Of Road Transport And Highways has published Consultancy Services For Feasibility Study And Detailed Engineering For Rehabilitation And Up-Gradation Of Nh- 154A From Km 84 To 93 And 130 To 172 In The State Of Himachal Pradesh . . Submission Date for this Tender is 09-10-2020. Laser Printers Tenders in CHAMBA Himachal Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

25484134
Consultancy Services For Feasibility Study And Detailed Engineering For Rehabilitation And Up-Gradation Of Nh- 154A From Km 84 To 93 And 130 To 172 In The State Of Himachal Pradesh .
Open Tender
Indian
Himachal Pradesh
CHAMBA
09-10-2020

Tender Details

Consultancy Services For Feasibility Study And Detailed Engineering For Rehabilitation And Up-Gradation Of Nh- 154A From Km 84 To 93 And 130 To 172 In The State Of Himachal Pradesh . , Remuneration For Local Staff ( Inclusive Of Per Diem Allowance ) , Team Leader Cum Senior Highway Engineer , Senior Bridge Engineer , Highway Cum Pavement Engineer , Material-Cum-Geotechnical Engineer- Geologist , Senior Survey Engineer , Traffic And Safety Expert , Environmental Specialist , Quantity Surveyor/ Documentation Expert , Land Acquisition Expert , Utility Expert , Sub Professional Staff ( To Be Assessed By Consultant As Per Requirement Of Assignment And One Sub-Professional Be A Fresh Graduate ) , Position , Position , Position , Position , Position , Position , Position , Support Staff ( Inclusive Of Per Diem Allowance ) Note: To Be Assessed By Consultant As Per Requirement Of Assignment , Office Manager , Typist , Office Boy , Night Watchman , Transportation ( Fixed Costs ) , The Vehicles Hired By The Consultant Shall Include The Cost For Rental , Drivers , Operation , Maintenance , Repairs , Insurance , Etc . , Duty Travel To Site ( Fixed Costs ) , Trips , Office Rent ( Fixed Costs ) The Rent Cost Includes Maintenance , Cleaning , Repairs , Etc . , Office Rent , Office Supplies , Utilities And Communication ( Fixed Costs ) , Office Supplies , Drafting Supplies , Computer Running Costs , Domestic And International Communication , Office Furniture And Equipment ( Rental ) , Office Furniture And Equipment , Reports And Document Printing , Monthly Report ( 3 Copies Per Month ) , Inception Report & Qap , Environment And Social Impact Screening Report , Draft Feasibility Report , Final Feasibility Report , Strip Plan With L . A . Reports , Draft La And Clearances I Report , Final La And Clearances I Report , Draft Environmental Assessment Report& Rap , Final Environmental Assessment Report& Rap , Draft Detailed Design Report & Drawings Etc . , Draft Emp , Draft Bidding Document , Final Detailed Project Report With Bill Of Quantities , Cost Estimates , Updated Drawings Etc . , Final Emp , Final Bidding Documents , Draft 3 ( A ) , 3 ( A ) And 3 ( D ) & 3G Notification For Land Acquisition ( 3 Copies Each ) , La & Clearances Ii Report , Survey And Investigation A . Topographical Survey ( Fixed Rate ) , Topographic Survey Including Hire Charges For Equipment ( Gps , Total Station , Auto Level Etc . ) And Supply Of Survey Teams Comprising Of Project Survey Filed Staff Etc . Inclusive Of Cost Of Materials , Labourer . , Detailed Topographic Surveys Using Mobile/ Aerial Lidar Or Better Technology , Investigation ( Fixed Cost ) ( Lumpsum ) , Road And Bridge Inventory , Fwd Test And Pavement Evaluation , Roughness Survey , Axle Load Survey , Material Survey And Investigation , Sub Grade Investuigation , Traffic Survey , Socio Economic And Census Survey/Studies , Land Acquisition Studies , Any Other Investigations/Surveys , Sub-Soil Investigation ( Boring ) ( Rate/M ) , A ) In Soil Other Than Hard Rock , B ) In Hard Rock , Net Work Survey And Gpr , Net Work Survey Of The Existing Highways As A Repository For Civil Work As Per Directions From Authority . , Gpr Survey For Detection Of Under Ground Utilities , Fixing Boundary Pillars , Procuring And Fixing Boundary Pillars And Its Installation , Complete In All Respect As Per Irc:25 , 1967: Wherever The Proposed Alignment Follows The Existing Alignment , The Boundary Pillars Shall Be Fixed At An Interval Of 200M On Either Side Of Proposed Right Of Way . Wherever There Is A Proposal Of Realignment Of The Existing Highway And/Or Construction Of New Bypasses , Consultant Shall Fix Boundary Pillars Along The Proposed Alignment On The Extreme Boundary On Either Side Of The Project Highway At 50 M Interval , Land Acquisition Team Including Support Staff And Logistics/Transportation , Ex-Land Revenue Inspector/Officer Or Equivalent , Ex-Kanoogo/Girdwar Or Equivalent , Ex-Patwari Or Equivalent , Typist ( 2 Nos . ) , Peon , Logistics For Land Acquisition Team , Computer Including NecessaryPeripherals ( 2 Nos . ) , Printers ( 2 Nos . ) , Vehicles ( Bolero Or Equivalent ) With Monthly Running Limit Of 4000 Km , Estimate Of Expatriateconsultants ( Name And Position To Be Filled In Below Columns By The Bidder ) , Position ( Value= 0 ) , Position ( Value= 0 ) , Position ( Value= 0 ) , Position ( Value= 0 ) , Position ( Value= 0 ) , Position ( Value= 0 ) , Position ( Value= 0 ) , Moblization And Demoblization- International Airfares ( Fixed Costs ) ( To Be Filled By Bidders In Below Columns ) , Position ( Value= 0 ) , Position ( Value= 0 ) , Position ( Value= 0 ) , Position ( Value= 0 ) , Position ( Value= 0 ) , Position ( Value= 0 ) , Moblization And Demoblization-Inland Travel In Home Country ( Fixed Costs ) , Other Miscellaneous Expenses ( Like Da , Internal Travel Expenses Other Incidentals ) ( Fixed Cost )

Key Value

Document Fees
INR 5000 /-
EMD
Refer document
Tender Value
Refer document

BOQ Items

Consultancy services for feasibility study and detailed Engineering for rehabilitation and up-gradation of NH- 154A from Km 84 to 93 and 130 to 172 in the state of Himachal Pradesh.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Remuneration for Local Staff (inclusive of per diem allowance) BI01010001010000000000000515BI0100001112
2 1.01 Team Leader cum Senior Highway Engineer BI01010001010000000000000515BI0100001113 9 Month
3 1.02 Senior Bridge Engineer BI01010001010000000000000515BI0100001114 5 Month
4 1.03 Highway cum Pavement Engineer BI01010001010000000000000515BI0100001115 5 Month
5 1.04 Material-cum-Geotechnical Engineer- Geologist BI01010001010000000000000515BI0100001116 6 Month
6 1.05 Senior Survey Engineer 7 Month
7 1.06 Traffic and Safety Expert 4 Month
8 1.07 Environmental Specialist 3 Month
9 1.08 Quantity Surveyor/ Documentation Expert 6 Month
10 1.09 Land Acquisition Expert 10 Month
11 1.1 Utility Expert 4 Month
12 2 Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
13 2.01 Position 1 Month
14 2.02 Position 1 Month
15 2.03 Position 1 Month
16 2.04 Position 1 Month
17 2.05 Position 1 Month
18 2.06 Position 1 Month
19 2.07 Position 1 Month
20 3 Support Staff (inclusive of per diem allowance)\nNote: To be assessed by consultant as per requirement of assignment
21 3.01 Office Manager 1 Month
22 3.02 Typist 1 Month
23 3.03 Office Boy 1 Month
24 3.04 Night Watchman 1 Month
25 4 Transportation (Fixed Costs)
26 4.01 The vehicles hired by the Consultant shall include the cost For rental, drivers, operation, maintenance, repairs, insurance, etc. 1 Month
27 5 Duty Travel to Site (Fixed Costs)
28 5.01 Trips 1 Trips
29 6 Office Rent (Fixed Costs) \nThe rent cost includes maintenance, cleaning, repairs, etc.
30 6.01 Office Rent 1 Month
31 7 Office Supplies, Utilities and Communication (Fixed Costs)
32 7.01 Office Supplies 1 Month
33 7.02 Drafting Supplies 1 Month
34 7.03 Computer Running Costs 1 Month
35 7.04 Domestic and International Communication 1 Month
36 8 Office Furniture and Equipment (Rental)
37 8.01 Office Furniture and Equipment 1 Lumpsum
38 9 Reports and Document Printing
39 9.01 Monthly Report (3 copies per month) 30 No
40 9.02 Inception Report & QAP 3 No
41 9.03 Environment and Social Impact Screening Report 4 No
42 9.04 Draft Feasibility Report 4 No
43 9.05 Final Feasibility Report 6 No
44 9.06 Strip Plan with L.A. Reports 6 No
45 9.07 Draft LA and Clearances I Report 4 No
46 9.08 Final LA and Clearances I Report 4 No
47 9.09 Draft Environmental Assessment report& RAP 4 No
48 9.1 Final Environmental Assessment report& RAP 6 No
49 9.11 Draft Detailed Design Report & Drawings etc. 4 No
50 9.12 Draft EMP 4 No
51 9.13 Draft Bidding Document 4 No
52 9.14 Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. 6 No
53 9.15 Final EMP 6 No
54 9.16 Final Bidding Documents 6 No
55 9.17 Draft 3(a) ,3(A) and 3(D)& 3G notification for land acquisition (3 copies each) 9 No
56 9.18 LA & Clearances II Report 6 No
57 10 Survey and Investigation A. Topographical Survey (Fixed Rate)
58 10.01 Topographic Survey including hire charges for equipment (GPS, Total Station, Auto Level etc.) and supply of survey Teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer. 1 Km
59 10.02 Detailed topographic surveys using mobile/ aerial LiDAR or better technology 1 Km
60 11 Investigation (Fixed cost)(lumpsum)
61 11.01 Road and Bridge Inventory 1 LumpSum
62 11.02 FWD Test And Pavement Evaluation 1 LumpSum
63 11.03 Roughness Survey 1 LumpSum
64 11.04 Axle load Survey 1 LumpSum
65 11.05 Material Survey and Investigation 1 LumpSum
66 11.06 Sub grade Investuigation 1 LumpSum
67 11.07 Traffic Survey 1 LumpSum
68 11.08 Socio economic and Census Survey/Studies 1 LumpSum
69 11.09 Land Acquisition Studies 1 LumpSum
70 11.1 Any other investigations/surveys 1 LumpSum
71 11.11 Sub-Soil Investigation (Boring) (Rate/m)
72 11.12 a) In soil other than hard rock 1500 Meter
73 11.13 b) In hard rock 200 Meter
74 11.14 Net Work Survey and GPR
75 11.15 Net work Survey of the existing Highways as a repository for civil work as per directions from Authority. 1 Job
76 11.16 GPR Survey for detection of under ground utilities 1 Job
77 12 Fixing Boundary pillars
78 12.01 Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval 1 Lumpsum
79 13 Land Acquisition Team including support staff and logistics/transportation
80 13.01 Ex-Land Revenue Inspector/Officer or equivalent\n 8 Month
81 13.02 Ex-Kanoogo/Girdwar or equivalent 8 Month
82 13.03 Ex-Patwari or equivalent\n 8 Month
83 13.04 Typist (2 nos.) 8 Month
84 13.05 Peon 8 Month
85 14 Logistics for Land acquisition Team
86 14.01 Computer including necessary\nperipherals (2 nos.)\n 8 Month
87 14.02 Printers (2 nos.) 8 Month
88 14.03 Vehicles (Bolero or equivalent)\nwith monthly running limit of 4000 km\n 8 Month
89 15 Estimate of ExpatriateConsultants (Name and position to be filled in below columns by the bidder)
90 15.01 Position (Value= 0)
91 15.02 Position (Value= 0)
92 15.03 Position (Value= 0)
93 15.04 Position (Value= 0)
94 15.05 Position (Value= 0)
95 15.06 Position (Value= 0)
96 15.07 Position (Value= 0)
97 15.08 Moblization and Demoblization- International Airfares (Fixed Costs) (To be filled by bidders in below columns)
98 15.09 Position (Value= 0)
99 15.1 Position (Value= 0)
100 15.11 Position (Value= 0)
101 15.12 Position (Value= 0)
102 15.13 Position (Value= 0)
103 15.14 Position (Value= 0)
104 16 Moblization and Demoblization-Inland Travel in Home country (Fixed Costs) 1 LumpSum
105 17 Other Miscellaneous expenses (Like DA, internal travel expenses other incidentals)(Fixed Cost) 1 LumpSum
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail