Lump Sump Provision For Survey Investigation Of Sewerage Under Iph Jal Shakti Division Rpeo Distt . Kinnaur H . P . Survey Investigation For Preparation Of Dpr For Providing Sewerage System To Village Pangi In Gp Pangi Tehsil Kalpa Distt . Kinnaur H .
Tender Overview
Project Description
Lump Sump Provision For Survey Investigation Of Sewerage Under Iph Jal Shakti Division Rpeo Distt . Kinnaur H . P . Survey Investigation For Preparation Of Dpr For Providing Sewerage System To Village Pangi In Gp Pangi Tehsil Kalpa Distt . Kinnaur H . P .
BOQ
| Name of Work: Lump Sum Provision for survey investigation of Sewerage under I&PH Division R/Peo Distt. Kinnaur H.P. SH:- Survey investigation for prepration of DPR for Providing Sewerage System to Village Pangi in G.P. Pangi Tehsil Kalpa Distt. Kinnaur H.P. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Providing consultancy service and preparation of DPR of Sewerage System to Village Pangi in G.P. Pangi Tehsil Kalpa Distt. Kinnaur H.P. • Structural and hydraulic design of all components of STPs and Sewer Network and proposed structures as necessary.\n• Detailed design and drawings of all electromechanical equipment proposed as necessary.\n• Preparation and submission of all required drawings and DPRs.\n• Detailed Estimate of Project including O&M.\n• Bid document prepare after approval of final DPR.\n• Interaction / discussion with client for getting DPR approval.\n• Getting all the relevant approvals of the competent authorities.\n• The scope of this work is broadly as follows: | |||
| 2 | 1.01 | • To reconfirm all proposed project components and identify, specify and undertake required surveys and investigations as necessary.\n• To conduct site visits, perform situation analysis and preliminary assessment based on available information, present ground status and prepare Inception Report with proposed design criteria / Plan.\n• To confirm land acquisition requirements and assess each site’s environmental aspects for detailed design of the project component.\n• To carry out detailed topographical surveys for producing digitalized drawings using Total Station for contouring on a grid of 15m x 15m or smaller; for preparation of plans of built-up areas, for longitudinal sections, cross sections and detailed alignment plans; and for fly leveling.\n• To carry out preliminary surveys, geo-technical & other investigations including sewage analysis reports.\n• To carry out DDPR as per CPHEEO Manuals and other relevant guidelines covering Feasibility Studies, Conceptual Plans and Preliminary Engineering Designs with estimates.\n• Detailed designs in accordance with best engineering practice, drawings, cost estimates and for all components in close coordination with all stakeholders. The designs shall meet the particular requirements and shall be sufficiently detailed to ensure clarity and understanding by the contractors and will be incorporated into DPR to be submitted for approval at competent level. All the components as delineated in the project scope will require detailed engineering design survey, and water and wastewater analysis shall be carried out. All surveys and investigations shall be accurate and plotted for review of the Department.\n• The estimate shall be prepared on the basis of prevailing Analysis of Rates (AOR) of the Jal Shakti Department. For Non-SOR items, if any, adopting market rate, proper rate analysis will be carried out in consultation with Department’s officials.\n• Bidding Documents: After approval of Detailed Project Reports at all competent levels, the Consultant will prepare Bid Packaging plan in accordance with the project phasing / sequencing approved in final DPR. The Bidding Documents shall be prepared as per Standard Procurement Manual (under approval stage) of the Department; along with tender specifications, tender drawings, and bill of quantities (BOQ) etc. complete. The Bid Documents shall be got approved at competent level.\n• To prepare action plan for O&M of the new and upgraded (if any) infrastructures.\n• To prepare a detailed implementation schedule, PERT Chart and management plan covering all stages of the implementation process to ensure coordination and minimization of disruption to the general public. | 2.23 | Sqkm |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender