Ministry Of Road Transport And Highways has published Annual Maintenance Of Road From Km 537 . 50 To Km 581 . 70 Of Nh-373 During The Year 2020-21. Submission Date for this Tender is 01-10-2020. Road Work Tenders in K R Nagar Karnataka. Bidders can get complete Tender details and download the document.
Name of Work: Annual Maintenance of road from Km:537.50 to Km:581.70 of NH-373 during the Year 2020-21. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials by tractor and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness including all labour, hire charges of all machineries etc., complete. The direction and instructions of engineer in charge of work. | 6 | Hectare | |
2 | 2 | Filling Pot-holes and Patch Repairs with open-Graded Premix surfacing, 40mm.\nRemoval of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 509, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2, including cost of all materials, labour, hire charges of machinery, lead, lift loading, unloading stacking, transporting etc., complete except lead for Bitumen & Emulsion. The direction and instructions of engineer in charge of work. \nI) Using Grading I Material | 4990.83 | Sqm | |
3 | 3 | Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/irregularities on shoulder to the design level by adding fresh approved soil upto 150mm excavated by excavator, carriage by tipper and compacting it with plate compactor including cost of all materials, labour, hire charges of machinery, loading, unloading, lead up to 1km, lift etc., complete. The direction and instructions of engineer in charge of work. | 15200 | Sqm |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail