| 1 | 1 | Appendix.A-Working charges - Pipe Line Extension | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.01 | Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffice diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | BI01010001010000000000000515BI0100001113 | 500 | metre |
|---|
| 3 | 1.02 | Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | BI01010001010000000000000515BI0100001114 | 75 | cum |
|---|
| 4 | 1.03 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidatingeach deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :All kinds of soil . | BI01010001010000000000000515BI0100001115 | 625 | cum |
|---|
| 5 | 1.04 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidatingeach deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : Ordinary Rock. | BI01010001010000000000000515BI0100001116 | 562.5 | cum |
|---|
| 6 | 1.05 | \"Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidatingeach deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :Medium Rock (blasting prohibited) | BI01010001010000000000000515BI0100001117 | 62.5 | cum |
|---|
| 7 | 1.06 | Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. | BI01010001010000000000000515BI0100001118 | 1250 | metre |
|---|
| 8 | 1.07 | Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals | BI01010001010000000000000515BI0100001119 | 1000 | metre |
|---|
| 9 | 1.08 | Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).75 mm nominal outer dia pipes. | BI01010001010000000000000515BI0100001120 | 1000 | metre |
|---|
| 10 | 1.09 | Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials). 90 mm nominal outer dia pipes.\" | BI01010001010000000000000515BI0100001121 | 1500 | metre |
|---|
| 11 | 1.1 | Supply and fitting 75 / 90 / 110 mm best quality P.V.C. End Cap in position | BI01010001010000000000000515BI0100001122 | 40 | No |
|---|
| 12 | 1.11 | providing interconnection between lines of sizes 160/140/110 mm PVC lines including cost of specials . | BI01010001010000000000000515BI0100001123 | 40 | No |
|---|
| 13 | 1.12 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001124 | 145 | cum |
|---|
| 14 | 2 | Appendix.B - Providing Functional Household Tap Connections | BI01010001010000000000000515BI0100001125 | | |
|---|
| 15 | 2.01 | Providing 20mm (3/4 inch) house connection with 15mm water meter from existing PVC / HDPE mains up to 110 mm dia., up to a length of 5m using 25mm ( 3/4 inch ) MDPE Pipe, PE80, PN16, Conforming to IS 4984: 2016 or later edition and PP PN 16 Compression / GM / Brass specials viz. brass ferrule, brass hexagonal nipple, GM full way wheel valve, bend, MTA, FTA, couplers, PVC Service Saddle of suitable size etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, fixing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges,including the cost of tested Class B Multijet water meter and weather with ISI mark resistant PP / PE meter box of minimum size 300mm x 200mm x 150mm, but excluding charges for cutting the concrete / tarred / bituminous roads etc, and as per the direction of the departmental officers. | BI01010001010000000000000515BI0100001126 | 215 | Nos |
|---|
| 16 | 2.02 | Providing 20mm (3/4 inch) house connection with 15mm water meter from existing AC / GI mains up to 125 mm dia., up to a length of 5 m using 25mm ( 3/4 inch ) MDPE Pipe, PE80, PN16, Conforming to IS 4984: 2016 or later edition and PP PN 16 Compression / GM / Brass specials viz. brass ferrule, brass hexagonal nipple, GM full way wheel valve, bend, MTA, FTA, couplers, GI / MS Service Saddle of suitable size etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, fixing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges, including the cost of tested Class B Multijet water meter with ISI mark and weather resistant PP / PE meter box of minimum size 300mm x 200mm x 150mm, but excluding charges for cutting the concrete / tarred / bituminous roads etc, and as per the direction of the departmental officers. | BI01010001010000000000000515BI0100001127 | 100 | Nos |
|---|
| 17 | 2.03 | Providing additional length of house connection pipe using 25 mm (3/4 inch) MDPE Pipe, PE80, PN16, Conforming to IS 4984: 2016 or later edition and PN 16 specials and testing the joints etc., by trenching and refilling in all kinds of soil with trench of average cross section 0.3m x 0.75m for laying of connection pipe and service pipe, lighting, watching, providing caution boards, traffic control etc., including cost of materials, hire for tools, cost of consumables and labour charges etc. complete, but excluding the cost of cutting of concrete / tarred / bituminous roads etc., and as per the directions of the department officers. | BI01010001010000000000000515BI0100001128 | 11675 | metre |
|---|
| 18 | 2.04 | Providing 25mm (3/4 inch) PVC Air Valve in the water meter assembly for 20mm connection, using 25mm Indian Standard Class 6 uPVC pipes and specials including cost of materials, consumables, hire for tools and labour charges etc. complete and as per the directions of the department officers. | BI01010001010000000000000515BI0100001129 | 315 | Nos |
|---|
| 19 | 2.05 | Providing 15mm PVC Tap in the water meter assembly for 15mm connection, using 20mm Indian Standard Class 6 uPVC pipes and specials including cost of materials, consumables, hire charges for tools and labour charges etc. complete and as per the direction of departmental officers. | BI01010001010000000000000515BI0100001130 | 315 | Nos |
|---|
| 20 | 2.06 | Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffice diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | BI01010001010000000000000515BI0100001131 | 500 | metre |
|---|
| 21 | 2.07 | Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | BI01010001010000000000000515BI0100001132 | 60 | cum |
|---|
| 22 | 2.08 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001133 | 67 | cum |
|---|
| 23 | 3 | Appendix.C - Cost of Materials | BI01010001010000000000000515BI0100001134 | | |
|---|
| 24 | 3.01 | Supply of PVC Pipe, 8kg/cm2, 75mm Dia including all Specials | BI01010001010000000000000515BI0100001135 | 1000 | metre |
|---|
| 25 | 3.02 | Supply of PVC Pipe, 8kg/cm2, 90mm Dia including all Specials | BI01010001010000000000000515BI0100001136 | 1500 | metre |
|---|
| 26 | 4 | Appendix.D - Mandatory fee for water connections | BI01010001010000000000000515BI0100001137 | | |
|---|
| 27 | 4.01 | Appendix.D - Mandatory fee for water connections up to 30.00m | BI01010001010000000000000515BI0100001138 | 100 | No |
|---|
| 28 | 4.02 | Mandatory fee for water connections \nabove 30 .00 m | BI01010001010000000000000515BI0100001139 | 215 | No |
|---|
| 29 | 4.03 | Cost of Geo Tagging for FHTC | BI01010001010000000000000515BI0100001140 | 315 | No |
|---|