Fabrication Job
Tender Overview
Project Description
Fabrication Job.- 1 Pipe Lines [ M.S. / G.I. ] Dismantling Up To12 Including Bends, Reducers, Flanges Etc. 2 Pipe Lines [ M.S. / G.I. ] Erection Up To 2 Dia. 3 Pipe Lines [ M.S. / G.I. ] - Do- Above 2 To 12 Dia. 4 Dismantling, Cleaning, Burning & Refitting Of Existing Pipe Lines Of All Sizes ( For Cleaning & Modification Purposes ) 5 M.S Pipe Line Above 12 Dia. Dismantling 6 M.S Pipe Line Above 12 Dia. Fabrication 7 M.S Pipe Line Above 12 Dia. Erection 8 Dismantling Of Flanges / Blind For Reuse 9 Refitting Of Old Flanges / Blind [ Reuse ] New 10 Fabrication Of Flanges / Blind From M. S. Plate 11 Valves Dismantling & Fitting Up To 6 Size 12 Valves Dismantling & Fittingfrom 7 To 12 Size 13 Valves Dismantling & Fitting Above 12 Size 14 Dismantling & Fitting Of Ms Fabricated Right Angle / Globe Valve Of Size More Than 12 Size 15 Dismantling & Fitting Of C.I. Pipe 16 Dismantling& Fitting Of S.S.Pipe & Accessories. 17 Dismantling Of Ms Bend, Tee, Nipple, Reducer Above 12 18 Fabrication Of Ms Bend, Tee, Nipple, Reducer Above 12 19 Erection Of Ms Bend, Tee, Nipple, Reducer Above 12 20 Dismantling, Fab. & Erection Of M.S. / S.S. Pipe Accessories ( Tee, Cone, Cross, Distance Piece, Nipple, Reducer, Bend ) 21 Dismantling, Fab. & Erection Of M.S. Plate Jobs ( Tanks, Gutters, Chutes Pipe Rolling, Boiler Ducting Etc. ) 22 Dis. / Fab. / Erection Of Internal Structure Of Wet Scrubber. 23 Dismantling Of Structure Work ( Staging, Columns, Trusses & Pipes Support, Purline, New Platform Etc. ) 24 Fabrication Of Structure Work ( Staging, Columns, Trusses & Pipes Support, Purline, New Platform Etc. ) 25 Erection Of Structure Work ( Staging, Columns, Trusses & Pipes Support, Purline, New Platform Etc. ) 26 Repairing Of Old Platform Dismantling, Fab.&Erection 27 Dismantling, Fab. & Erection Of Railing 28 Patch Work Upto 4 Sq. Ft. Max. 29 Patch Work Above 4 Sq. Ft. Welding Work ( Two Round ) 30 Dismantling, Fab. & Erection Of Cane Kicker Blades 31 Dismantling, Fab. & Erection Of Cane Kicker Drum 32 Dismantling, Fab. & Erection Of M.S. Side & Bottom Plate Jobs ( Rake Carrier, Cc, Be, Bc, Rbc Trough Donnelly Chute, Fibrizor, Cane Leveller, Kicker, Juice Screen Box, Juice Screen Tray, Bagacillo Casing Etc. 33 Fabrication & Erection Of New Discharge Chute For Mill No. 1, 2 & 3 34 Fabrication & Erection Of New Discharge Chute For Mill No. 4. 35 Rake Carrier, C.C., B.E., B.C., R.B.C Troughs, Donnelly Chute - Dismantling & Fitting Of Runners Of Various Chain. 36 Rake Carrier, C.C., B.E., B.C., R.B.C Troughs, Donnelly Chute - Dismantling & Fitting Of Side Angles 37 Shifting Of Cane Carrier Trough Side Plate About 25 Mm Towards Outside & Alignment To Avoid Wear & Tear Of Side Plates 38 Dismantling, Fab. & Erection Of Cane Carrier Runner Beam 39 Rake Carrier, C.C., B.E., B.C., R.B.C Fabrication & Erection Of Tail End Sprocket Wheel 40 Fabrication & Erection Of Maceration Water Tray At Mill 41 Fabrication Of Ms Cover For Mill Bottom Bearing ( Journal Size Dia- 430Mmx540mm ) 42 Cane Unloaders - Dismantling Of Square Bar ( Size-2 ) Runner . 43 Cane Unloaders - Fitting Of Square Bar Size 2” Runner At Cane Unloader 44 Cane Unloaders - Fabrication & Fitting Of M.S. Plate 10 Mm Thk. ( Appx. ) At Cane Unloaders 300 Mm Gantary Channel 45 Cane Unloaders-To Provide Horizontal Support Of Gantary Beam With Vertical Column Using Channel Piece 100 Mmx1.3 M Length 46 Cane Unloaders- To Provide Vertical Support Of Gantary Beam ( 200 Mm ) Using Channel Piece 150 Mmx780 Mm Length 47 Cane Unloaders- Dismantling, Fab. & Erection Of Gantary ( Span 10 Meters ) 48 Cane Unloaders - Fabrication And Erection Of Bridge Gear Wheel Guard. 49 Cleaning, Welding Of Cane Unloader Bridge Wheel 50 Cleaning, Welding Of Cane Unloader 51 Fab & Erection Of New Donnelly Chute 52 Replacement Of Side Boxes ( Dis., Fab / Erection ) For Runners At Rack Carrier Troughs 53 Dismantling, Fabrication And Erection Of Rake Carrier Troughs Bottom From 12Mm Plate And Side Plate=8Mm. 54 Dismantling, Fabrication And Erection Of Beds ( For Reduction Gear And Motor ) 55 Bagacillo Screens Fabrication & Erection. 56 Dismantling Of Bagassecillo Screens 57 Fabrication Of Crown Pinion Gear Guard 58 Repair Of Transmission Gear Guard. 59 Fabrication And Erection Of Transmission Gear Guard Top Cover 60 Fabrication And Erection Of Transmission Gear Guard Bottom Cover 61 Strengthening Of Mill House Crane Bridge Structure With 6 Mm Thk .Ms Plate Between Upper & Lower Beam 62 Fabrication Of D.S.M. Screens Juice Boxes. 63 Welding Of Mill Rollers Sidesappx. 1.5 Width Peripheral 64 Hard Facing Of Trash Plates Teeth Side And Top Surface. 65 Dis, Fab& Erection Of Scroll Of Screw Conveyor For Dsm Screen 66 Fabrication & Erection Of Complete Casing Of Screw Conveyor 67 Replacement Of Bottom Juice Collecting Tray Of Dsm Screw Conveyor Casing ( Dis, Fab& Erection ) 68 Tufr - Build Up Of Existing Tufr Tips With M.S. Electrodes 69 Tufr - Hardfacing Of Existing Of Tufr Tips 70 Through Out Welding Except Holes Of Mills Tufr Shell 71 Fabrication And Erection Of Mill Juice Tray Alongwith Discharge Pipe. 72 Fabrication, Erection & Commissioning Of Bagasse Drier At 4Th Mill’S Discharge Chute Complete Including Staging, Bed, Alignmentetc 73 Cleaning, Welding & Grinding Of Teeth Sprockets As Per Profile - Sprocket C.C. / B.C. 74 Cleaning, Welding & Grinding Of Teeth Of Sprockets As Per Profile - Rack Carrier Sprocket 75 Cleaning, Welding & Grinding Of Teeth Of Pinion As Per Profile - Pinion 22 Teeth Under Feed Roller Drive ( One Side Of Teeth ) 76 Cleaning, Welding & Grinding Of Teeth Of Pinion As Per Profile - Pinion 17 Teeth Of Under Feed Roller ( One Side ) 77 Chevron Groove Cutting In Rollers. 78 Cane Carrier To Be Covered With 3Mm M.S. Plate On Top Upto Desired Length With Hinges And Angles Bolted 79 Blower Fan With Alignment Fabrication, Errection & Commissioning. 80 Blower Fan With Alignment Fabrication, Errection & Commissioning. 81 Blower Fan Casing - Dismantling, Fab, Erection 82 Dismantling, Fabrication & Erection Of Bagacillopipe From Bagacillo To Vacuum Filter 83 Dismantling, Fitting & Hydraulic Testing Of S.S. Tubes ( Semi-Kestnner, Juice Heaters ) 84 Dismantling, Fitting & Hydraulic Testing Of S.S. Tubes ( Vapour Cell & Evaporator Bodies ) 85 Dismantling, Fitting & Hydraulic Testing Of S.S / Brass Tubes ( Pans ) 86 Dismantling, Fabrication & Erection Of Pan And Quad Down Take 86 Dismantling, Fab. & Erection Of Pan And Quad Calanderia Jacket. 88 Dismantling Of Up To 4 Pump & 15 Hp Motor. 89 Erection Of Up To 4 Pump & 15 Hp Motor. 90 Dismantling Of 4” To 8” Pump & 15 To 40 H.P.Motor 91 Erection Of 4” To 8” Pump & 15 To 40 H.P.Motor 92 Dismantling Of Above 8” Pump & Above 40 H.P.Motor 93 Erection Of Above 8” Pump & Above 40 H.P.Motor 94 Dismantling Of G.I. / A.C.C. Sheet 95 Fitting ( Erection ) Of G.I. / A.C.C. Sheet 96 Dismantling Of Water Gutter & Ridge 97 Erection Of Water Gutter & Ridge 98 Dismantling, Fabrication, Erection Of Sulphur Furnace Complete 99 Dismantling, Fab. & Erection Of The Melter / Receiver Of Sulphur Furnace. 100 Dismantling, Fabrication & Erection Of Shell Of Sulphur Furnace 101 Dismantling, Fabrication & Erection Of Scrubber Of Sulphur Furnace 102 Dismantling , Fabrication & Erection Of Steam Jacket Of Sulphur Furnace 103 Dismantling, Fabrication, Erection Of Sulphur Furnace Cooler 104 Dismantling, Fabrication & Erection Of The Bottom Portion Of Weight Juice Tank With Ms Plates 105 Dismantling, Fabrication & Erection Of The Scrappers Of Dorr Clarifier With Ms Plates 106 Dismantling, Fabrication & Erection Of The Catcher Bottle Of Vac. Filter With Ms Plates 107 Dismantling, Fabrication & Erection Of The Bottom Of Dorr Clarifier With Ms Plates 108 Dismantling, Fabrication & Erection Of The Mud Tray Of Vac. Filter With Ms Plates 109 Dismantling, Fabrication & Erection Of The Mud Tank Bottom Of Vac. Filter With Ms Plates 110 Dismantling, Fabrication & Erection Of The Conical Portion Of Juice / Water / Mud Tank With Ms Plates 111 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station - Shell Of 112 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station - Pan Tops 113 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station - Saveall 114 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station - Shell Of Vac. Crystallizer 115 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station Bottom Plates Of Syrup & Molasses Tanks & Conditioners 116 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station Side Plates Of Syrup & Molasses Tanks & Conditioners 117 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station Pan Shell Strengthening Work With Ms Channels / Angles / Ms Plate Rings 118 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station Top Cone Strengthening Work With Ms Channels / Angles / Ms Plate Rings 119 Dismantling, Fabrication & Erection Of Ms Plates Of Pan Station Strengthening Of Vapour Line By Inner Side Supporting Of Angles / Pipes 120 Dismantling, Fab. & Erection Of Coils Of Horizontal Crystallizers 121 Dismantling Of Shaft Of Crystallizers 122 Fabrication Of Shaft Of Crystallizers 123 Erectionof Shaft Of Crystallizers 124 Replacement Of 3” Ms Coils ( Including Bends, Flange, Etc. ) Of Vertical Crystallizers 125 Dismantling, Fab. & Erection Of Arms Of A- Crystallizers 126 Replacement Of Coils Of Dorr & Evaporator Bodies - Juice Coils ( Dismantling, Fab. & Erection ) 127 Replacement Of Coils Of Dorr & Evaporator Bodies - Ammonia & Gas Coils ( Dismantling, Fab. & Erection ) 128 Replacement Of Weak Ms Plates & Cooling Coils Of Molasses Tanks 129 Replacement Of Weak Ms Plates & Cooling Coils Of Molasses Tanks Side Plates Upto Height 10Mtr 130 Replacement Of Weak Ms Plates & Cooling Coils Of Molasses Tanks Top Cone Plates With Supports 131 Replacement Of Weak Ms Plates & Cooling Coils Of Molasses Tanks Cooling Coils 132 Dismantling, Fabrication, Erection Of Ms Pipe Coil Fitting At Various Station 133 Fabrication Of Drum Internal Plates Of Boiler 134 Dismantling, Fabrication And Erection Of Expansion Joints Of Boiler 135 Dismantling Of Existing Transient Heaters 136 Shifting Of New Transient Heater At Site 137 Erection Of New / Existing Transient Heaters 138 Dismantling / Fab. / Erection Of Weak Portion Of Partition Plates Of Juice Heaters 139 Dis. / Repairing / Fabrication & Erection Of Bagasse Belt Conveyor On Turnkey Basis 140 Dismantlingofspurgar Of Juice Sulphitor For Cleaning 141 Fabricationofspurgar Of Juice Sulphitor For Cleaning 142 Erection / Refitting.Ofspurgar Of Juice Sulphitor For Cleaning 143 Dis, Fab & Erection Of Stainer Of Injection Pump / Spray Pump 144 Injection Channel Jail Dismantling, Fab. & Erection. 145 Repairing Of Agitator Of Vaccum Filter Dismantling, Fab. & Erection. 146 Fabrication Of Sweeper Trolly 147 Repairing / Changing Of Vertical Crystallizer Arms In Top Gutter ( Scrapper Type ) Round Shape 148 Etp Middle Shaft Repairing / Replacement 149 Fab Of New Lime Tank With Its Shaft, 150 Dismantling, Fab & Erection Of Save All Of Evaporator Bodies 151 Replacement Of Juice Sulphiter Top 152 Dismantling Of Vibro Screen 153 Fabriaction Of Vibro Screen 154 Erection Of Vibro Screen 155 Repairing / Replacement Of Shell Of Sugar Melter 156 Replacement Of Shaft Of Sugar Melter 157 Replacemnet Of Arm Of Sugar Melter 158 Stair Case ( With Chequared Plate ) - Dismentling 159 Stair Case ( With Chequared Plate ) - Fabrication 160 Stair Case ( With Chequared Plate ) - Erection 161 Labour Supply ( Per Day 8 Hours Basis ) - Fitter 162 Labour Supply ( Per Day 8 Hours Basis ) - Welder 163 Labour Supply ( Per Day 8 Hours Basis ) - Helper 164 Labour Supply ( Per Day 8 Hours Basis ) - Khalasi 165 Juice Heater Cover Dismantling, Fab. & Erection 166 Juice Heater Refitting With Testing By Pump. 167 Sight Glass Fitting In Condensate Bottle Of Seed & Juice Heaters / Any Vessel, By Welding The Sight Glass. 168 Dismantling, Fabrication, Erection Of Stainer Of Injection And Spray Pump 169 Stair Case At Sugar Bin Fabrication & Erection. 170 Vaccum Crystallizer Shell Fabrication, Erection& Patch. 171 New Planatory Gear Boxes For B Massecuite Crystallizer. 172 F.D. Old Impeller Is To Be Removed And New Is To Be Fitted And Trial. 173 Straightening Of Old Pipe Line Of Thickness 6-8Mm Into Plain Sheet By Rolling Machine 174 To Provide Slidde Gate At B.C. Or Desired Size With Rack &Pinion. 175 To Provide A Tapering Suit Under Idler Of B.C. To Remove The Falling Bagasse In Bagasse Year. 176 Pan No. 4 Mechanical Circulator Is To Be Dismantled And Parts To Be Shifted To W 177 Pan No. 4 Mechanical Circulagtoris To Be Dismantled And Parts To Be Shifted To Workshop For Machining. After Machining The Same Circulator Parts To Be Fitted And Trial. 178 Pan / Quad Condenser Tail Pipe Double Support Is To Be Provided With Atleast L 3” / Pipe 2.1 / 2” With Clamp System. 179 Rori Melter Is To Be Fabricated And Erected As Per Drg. 180 Replacement Of Id Fan Ducting & Casing. 181 Ss Condenser Repairing By Support To Be Given By Rings 182 Clear Juice Filter Arrangement By Jali Fitting - Dismantling, Fabrication, Erection 183 Dismantling, Fabrication, Erection Of Strengthening Of Factory Column, Structure, Channel, Beam Etc. 184 Juice Heater Header Partition Plate Top & Bottom Both Side - Dismantling, Fabrication, Erection 185 Oliver Filter Tray Dismantling, Fabrication, Erection 186 Centrifugal Machine Strengthning Dismantling, Fabrication & Fitting From Channel, Beam 187 Dismantling, Erection Of Ss Tail Pipe At Pan & Quad Condenser 188 Dismantling, Fabrication, Erection Tail Pipe Support Angle Channel Dismantling, Fabrication, Erectionof Complete Pug Mill For Continuous Machine B- Massecuite. Repairing Of Bottom Portion Of Hot Water Tank Replacement Dismantling, Fabrication, Erection Of Sulphur Furnace No. 2, Complete 192 Dismantling, Fabrication, Erection Of Sulphur Furnace No. 3 ( Lime Side ) Complete Scrubber With Its Internal Pipes. 193 Sf Melter And Receiver Steam Jacket And Its Coil 194 Dismantling, Fabrication, Erection Of So2 Gas Coil / Pipe At Syrup Sulphiter 195 Dismantling, Fabrication, Erection Of Save All At Spare Body Of Quad 196 Dismantling Of Condensate Pit Tank.
BOQ
| Name of Work: Fabrication jobs | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Fabrication jobs | |||
| 2 | 1.001 | PIPE LINES [M.S./ G.I.] Dismantling up to12'' including bends, reducers, flanges etc. | 1 | 1 | per inch dia/ feet length |
| 3 | 1.002 | PIPE LINES [M.S./ G.I.] Erection up to 2\" dia. | 2 | 1 | -do- |
| 4 | 1.003 | PIPE LINES [M.S./ G.I.] - do- above 2\" to 12\" dia. | 3 | 1 | -do- |
| 5 | 1.004 | Dismantling,cleaning, burning & refitting of existing pipe lines of all sizes (for cleaning & modification purposes) | 4 | 1 | -do- |
| 6 | 1.005 | M.S Pipe line above 12\" dia. Dismantling | 5 | 1 | -do- |
| 7 | 1.006 | M.S Pipe line above 12\" dia. Fabrication | 6 | 1 | -do- |
| 8 | 1.007 | M.S Pipe line above 12\" dia. Erection | 7 | 1 | -do- |
| 9 | 1.008 | Dismantling of flanges/ Blind for reuse | 8 | 1 | per inch dia/ pc. |
| 10 | 1.009 | Refitting of old flanges/Blind[reuse] new | 9 | 1 | -do- |
| 11 | 1.01 | Fabrication of flanges/Blind from M. S. plate | 10 | 1 | -do- |
| 12 | 1.011 | Valves Dismantling & fitting up to 6\" Size | 11 | 1 | per inch dia/ pc. |
| 13 | 1.012 | Valves Dismantling & fittingfrom 7\" to 12'' Size | 12 | 1 | -do- |
| 14 | 1.013 | Valves Dismantling & fitting above 12\" Size | 13 | 1 | -do- |
| 15 | 1.014 | Dismantling & fitting of MS fabricated right angle/ globe valve of size more than 12\" size | 14 | 1 | -do- |
| 16 | 1.015 | Dismantling & fitting of C.I. pipe &accessories | 15 | 1 | Per inch dia/ft. length |
| 17 | 1.016 | Dismantling& fitting of S.S.Pipe & accessories. | 16 | 1 | -do- |
| 18 | 1.017 | Dismantling of MS bend, Tee, nipple, reducer above 12\" | 17 | 1 | -do- |
| 19 | 1.018 | Fabrication of MS bend, tee, nipple, reducer above 12\" | 18 | 1 | - do - |
| 20 | 1.019 | Erection of MS bend, tee, nipple, reducer above 12\" | 19 | 1 | - do - |
| 21 | 1.02 | Dismantling, Fab. & Erection of M.S./S.S. pipe accessories(tee,cone,cross,distance piece, nipple, reducer, bend) | 20 | 1 | per inch dia/ feet length |
| 22 | 1.021 | Dismantling, Fab. & Erection of M.S. Plate jobs (tanks, gutters, chutes Pipe rolling, Boiler ducting etc.) | 21 | 1 | PMT |
| 23 | 1.022 | Dis./fab./erection of internal structure of wet scrubber. | 22 | 1 | Lump sum |
| 24 | 1.023 | Dismaintling of structure work (staging, columns, trusses & pipes support, purline, new plate form) | 23 | 1 | PMT |
| 25 | 1.024 | Fabrication of structure work (staging, columns, trusses & pipes support, purline, new plate form) | 24 | 1 | PMT |
| 26 | 1.025 | Erection of structure work (staging, columns, trusses & pipes support, purline, new plate form) | 25 | 1 | PMT |
| 27 | 1.026 | Repairing of old platform dismantling, fabrication & erection. | 26 | 1 | Per sq. Meter. |
| 28 | 1.027 | Dismantling, fab. & erection of railing. | 27 | 1 | Per meter length. |
| 29 | 1.028 | Patch work up to 4 sq. ft. max. | 28 | 1 | Per sq. feet. |
| 30 | 1.029 | Patch work above 4 sq. ft. Welding work ( Two round ) | 29 | 1 | per feet length |
| 31 | 1.03 | Dismantling, Fab. & Erection of cane kicker blades | 30 | 1 | Each |
| 32 | 1.031 | Dismantling, Fab. & Erection of cane kicker drum | 31 | 1 | Each |
| 33 | 1.032 | Dismantling, Fab. & Erection of M.S. side & bottom Plate jobs (Rake carrier, CC,BE,BC,RBC trough Donnelly chute, Fibrizor, cane leveller, kicker, juice screen, juice screen tray, bagacillo casing etc. | 32 | 1 | Per sq. mtr. |
| 34 | 1.033 | Fabrication & erection of new discharge chute for mill no. 1,2 & 3 | 33 | 1 | Per chute |
| 35 | 1.034 | Fabrication & erection of new discharge chute for mill no. 4. | 34 | 1 | Per chute |
| 36 | 1.035 | Rake carrier, C.C., B.E., B.C., R.B.C Troughs, Donnelly chute - Dismantling & fitting of runners of various chain. | 35 | 1 | per mtr length |
| 37 | 1.036 | Rake carrier, C.C., B.E., B.C., R.B.C Troughs, Donnelly chute - Dismantling & fitting of side angles | 36 | 1 | -do- |
| 38 | 1.037 | Shifting of cane carrier side plate about 25 mm towards outside & alignment to avoid wear & teart of side plates. | 37 | 1 | Per mtr length |
| 39 | 1.038 | Dismantling, fab., & erection of cane carrier runner beam. | 38 | 1 | Per mtr length |
| 40 | 1.039 | Rake carrier, C.C., B.E., B.C., R.B.C - Fabrication & erection of tail end sprocket wheel | 39 | 1 | Each |
| 41 | 1.04 | Fabrication & erection of Maceration water tray at mill | 40 | 1 | Per tray |
| 42 | 1.041 | Fabrication of MS cover for mill bottom bearing (Journal size dia- 430mmx540mm) | 41 | 1 | Per piece |
| 43 | 1.042 | Cane Unloaders - Dismantling of square bar (size-2\") runner . | 42 | 1 | Per Mtr |
| 44 | 1.043 | Cane Unloaders - Fitting of square bar size 2” runner at cane unloader | 43 | 1 | Per mtr. |
| 45 | 1.044 | Cane Unloaders - Fabrication & fitting of M.S. Plate 10 mm thk. (appx.) at cane unloaders 300 mm gantary channel | 44 | 1 | Per Mtr |
| 46 | 1.045 | Cane unloaders - To provide horizontal support of gantary beam with vertical column using channel piece 100 mm x 1.3 M length. | 45 | 1 | Per support. |
| 47 | 1.046 | Cane unloaders - To provide vertical support of gantary beam 200 mm using channel piece 150 mm x 780 mm length. | 46 | 1 | per suppoert. |
| 48 | 1.047 | Cane Unloaders - Dismantling, Fab. & erection of gantary span - 10 meters. | 47 | 1 | per gantary. |
| 49 | 1.048 | Cane Unloaders - Fabrication and erection of bridge gear wheel guard. | 48 | 1 | Per piece |
| 50 | 1.049 | Cleaning, welding of cane unloader bridge wheel | 49 | 1 | Per wheel |
| 51 | 1.05 | Cleaning, welding of cane unloader trolley wheel | 50 | 1 | Per wheel |
| 52 | 1.051 | Fab & erection of new Donnelly chute | 51 | 1 | Per chute |
| 53 | 1.052 | Replacement of side boxes (Dis., Fab./ erection) for runners at rack carrier troughs. | 52 | 1 | Per meter. |
| 54 | 1.053 | Dismantling, fabrication and erection of rake carrier troughs bottom from 12mm plate and side plate=8mm. | 53 | 1 | -do- (running length) |
| 55 | 1.054 | Dismantling, fabrication and erection of beds (for reduction gear and motor) | 54 | 1 | Per bed |
| 56 | 1.055 | Bagacillo screens fabrication & erection. | 55 | 1 | Per piece |
| 57 | 1.056 | Dismantling of bagassecillo screens | 56 | 1 | Per piece |
| 58 | 1.057 | Fabrication of crown pinion gear guard | 57 | 1 | Per pc. |
| 59 | 1.058 | Repair of transmission gear guard. | 58 | 1 | P. sq.mtr. |
| 60 | 1.059 | Fabrication and erection of transmission gear guard top cover | 59 | 1 | P. piece |
| 61 | 1.06 | Fabrication and erection of transmission gear guard bottom cover | 60 | 1 | P. piece |
| 62 | 1.061 | Strengthening of Mill House crane bridge structure with 6 mm thk .MS plate between upper & lower beam | 61 | 1 | Per SQ. Ft. |
| 63 | 1.062 | Fabrication of D.S.M. screens juice boxes. | 62 | 1 | Per box |
| 64 | 1.063 | Welding of mill roller's sides appx. 1.5 \" width peripheral | 63 | 1 | per layer. |
| 65 | 1.064 | Hard facing of trash plates teeth side and top surface. | 64 | 1 | Per trash plate |
| 66 | 1.065 | Dis,fab & erection of scroll of screw conveyor for DSM screen | 65 | 1 | Per piece |
| 67 | 1.066 | Fabrication & erection of complete casing of screw conveyor | 66 | 1 | -do- |
| 68 | 1.067 | Replacement of bottom juice collecting tray of DSM screw conveyor casing (Dis,fab & erection) | 67 | 1 | Lump sump |
| 69 | 1.068 | TUFR - Buildup of existing TUFR tips with M.S. electrodes | 68 | 1 | Per roller |
| 70 | 1.069 | TUFR - Hard facing of existing of TUFR tips | 69 | 1 | Per roller |
| 71 | 1.07 | Throughout welding except holes of Mills TUFR shell | 70 | 1 | Per roller |
| 72 | 1.071 | Fabrication and erection of mill juice tray along with discharge pipe. | 71 | 1 | Per tray |
| 73 | 1.072 | Fabrication, erection & commissioning of bagasse drier at 4th mills discharge chute complete including staging, bed, alignment etc. | 72 | 1 | Lumpsump. |
| 74 | 1.073 | Cleaning, welding & grinding of teeth sprockets as per profile - Sprocket C.C./B.C. | 73 | 1 | Per sprocket |
| 75 | 1.074 | Cleaning, welding & grinding of teeth of sprockets as per profile - Rack carrier sprocket | 74 | 1 | -do- |
| 76 | 1.075 | Cleaning, welding & grinding of teeth of pinion as per profile - Pinion 22 teeth under feed roller drive (one side of teeth) | 75 | 1 | Per pinion |
| 77 | 1.076 | Cleaning, welding & grinding of teeth of pinion as per profile - Pinion 17 teeth of under feed roller (one side) | 76 | 1 | Per pinion |
| 78 | 1.077 | Chevron groove cutting in rollers. | 77 | 1 | each |
| 79 | 1.078 | Cane carrier to be covered with 3mm M.S. plate on top upto desired length with hinges and angles bolted | 78 | 1 | Per mtr running length of c.c. |
| 80 | 1.079 | Blower fan with alignment Fabrication, errection & commissioning. | 79 | 1 | Per fan. |
| 81 | 1.08 | Blower fan with alignment Fabrication, errection & commissioning. | 80 | 1 | per fan. |
| 82 | 1.081 | Blower fan casing - Dismantling, Fabrication & erection. | 81 | 1 | per casing. |
| 83 | 1.082 | Dismantling, fabrication & erection of bagacillopipe from bagacillo to vacuum filter | 82 | 1 | per inch dia/ per meter. |
| 84 | 1.083 | Dismantling, fitting & hydraulic testing of S.S. Tubes (Semi-kestnner, juice heaters ) | 83 | 1 | per tube |
| 85 | 1.084 | Dismantling, fitting & hydraulic testing of S.S. Tubes (vapour cell & evaporator bodies) | 84 | 1 | per tube |
| 86 | 1.085 | Dismantling, fitting & hydraulic testing of S.S /Brass tubes ( pans ) | 85 | 1 | per tube |
| 87 | 1.086 | Dismantling, fabrication & erection of Pan and quad down take | 86 | 1 | Lump sum |
| 88 | 1.087 | Dismantling, fab. & erection of Pan and Quad calanderia jacket. | 87 | 1 | Per sq. mtr. |
| 89 | 1.088 | Dismantling of up to 4 \" pump & 15 HP motor. | 88 | 1 | Per inch dia/HP |
| 90 | 1.089 | Erection of up to 4 \" pump & 15 HP motor. | 89 | 1 | -do- |
| 91 | 1.09 | Dismantling of 4” to 8” pump & 15 to 40 H.P.Motor | 90 | 1 | Per inch dia/HP |
| 92 | 1.091 | Erection of 4” to 8” pump & 15 to 40 H.P.Motor | 91 | 1 | -do- |
| 93 | 1.092 | Dismantling of above 8” pump & above 40 H.P.Motor | 92 | 1 | Per inch dia/HP |
| 94 | 1.093 | Erection of above 8” pump & above 40 H.P.Motor | 93 | 1 | Per inch dia/ HP |
| 95 | 1.094 | Dismantling of GI/ ACC Sheet | 94 | 1 | per sq. Feet. |
| 96 | 1.095 | Fitting (erection) of GI/ ACC sheet | 95 | 1 | per sq. Feet. |
| 97 | 1.096 | Dismantling of water gutter & ridge | 96 | 1 | per running feet. |
| 98 | 1.097 | Erection of water gutter & ridge. | 97 | 1 | per running feet. |
| 99 | 1.098 | Dismantling, fabrication, erection of Sulphur furnace (complete) | 98 | 1 | L.S. each. |
| 100 | 1.099 | Dismantling, fab. & erection of the Melter/ receiver of Sulphur furnace. | 99 | 1 | Per piece. |
| 101 | 1.1 | Dismantling, fabrication & erection of Shell of Sulphur furnace | 100 | 1 | Per shell |
| 102 | 1.101 | Dismantling, fabrication & erection of scrubber of sulphur furnace | 101 | 1 | P.M.T. |
| 103 | 1.102 | Dismantling , fabrication & erection of steam jacket of sulphur furnace | 102 | 1 | Per Pc. |
| 104 | 1.103 | Dismantling, fabrication, erection of Sulphur furnace cooler | 103 | 1 | L.S. each. |
| 105 | 1.104 | Dismantling, Fabrication & erection of the Bottom portion of weight juice tank with MS plates | 104 | 1 | Per M.T. |
| 106 | 1.105 | Dismantling, Fabrication & erection of the Scrappers of Dorr clarifier with MS plates | 105 | 1 | Per M.T. |
| 107 | 1.106 | Dismantling, Fabrication & erection of the Catcher bottle of Vac. Filter with MS plates | 106 | 1 | Per M.T. |
| 108 | 1.107 | Dismantling, Fabrication & erection of the Bottom of Dorr clarifier with MS plates | 107 | 1 | Per M.T. |
| 109 | 1.108 | Dismantling, Fabrication & erection of the Mud tray of Vac. Filter with MS plates | 108 | 1 | Per M.T. |
| 110 | 1.109 | Dismantling, Fabrication & erection of the Mud tank bottom of vac. Filter with MS plates | 109 | 1 | PMT |
| 111 | 1.11 | Dismantling, Fabrication & erection of the Conical portion of juice/ water/ mud tank with MS plates | 110 | 1 | Per sq. mtr. |
| 112 | 1.111 | Dismantling, Fabrication & erection of MS plates of Pan station - Shell of Pans | 111 | 1 | PMT |
| 113 | 1.112 | Dismantling, Fabrication & erection of MS plates of Pan station - Pan tops | 112 | 1 | -do- |
| 114 | 1.113 | Dismantling, Fabrication & erection of MS plates of Pan station - Saveall | 113 | 1 | Per save-all |
| 115 | 1.114 | Dismantling, Fabrication & erection of MS plates of Pan station - Shell of Vac. Crystallizer | 114 | 1 | PMT |
| 116 | 1.115 | Dismantling, Fabrication & erection of MS plates of Pan station Bottom plates of Syrup & molasses tanks & conditioners | 115 | 1 | Per M.T. |
| 117 | 1.116 | Dismantling, Fabrication & erection of MS plates of Pan station Side plates of Syrup & molasses tanks & conditioners | 116 | 1 | -do- |
| 118 | 1.117 | Dismantling, Fabrication & erection of MS plates of Pan station Pan shell strengthening work with MS channels/ angles/ MS plate rings | 117 | 1 | Per Pan |
| 119 | 1.118 | Dismantling, Fabrication & erection of MS plates of Pan station Top cone strengthening work with MS channels/ angles/ MS plate rings | 118 | 1 | Per cone |
| 120 | 1.119 | Dismantling, Fabrication & erection of MS plates of Pan station Strengthening of vapour line by inner side supporting of angles/ pipes | 119 | 1 | Per vapour line |
| 121 | 1.12 | Dismantling, fab. & erection of coils of horizontal crystallizers | 120 | 1 | Per inch dia / feet length |
| 122 | 1.121 | Dismantling of shaft of crystallizers | 121 | 1 | Per inch dia/ feet length |
| 123 | 1.122 | Fabrication of shaft of crystallizers | 122 | 1 | -do- |
| 124 | 1.123 | Erectionof shaft of crystallizers | 123 | 1 | -do- |
| 125 | 1.124 | Replacement of 3” MS coils (including bends, flange, etc.) of Vertical crystallizers | 124 | 1 | Per inch dia/ feet length |
| 126 | 1.125 | Dismantling, fab. & erection of arms of A- crystallizers | 125 | 1 | PMT |
| 127 | 1.126 | Replacement of coils of Dorr & evaporator bodies - Juice coils (Dismantling, Fab. & erection) | 126 | 1 | Per inch dia./ feet length |
| 128 | 1.127 | Replacement of coils of Dorr & evaporator bodies - Ammonia & gas coils (Dismantling, Fab. & erection) | 127 | 1 | Per inch dia./ feet length |
| 129 | 1.128 | Replacement of weak MS plates & cooling coils of Molasses tanks Bottom plates | 128 | 1 | PMT |
| 130 | 1.129 | Replacement of weak MS plates & cooling coils of Molasses tanks Side plates upto height 10mtr | 129 | 1 | -do- |
| 131 | 1.13 | Replacement of weak MS plates & cooling coils of Molasses tanks Top cone plates with supports | 130 | 1 | -do- |
| 132 | 1.131 | Replacement of weak MS plates & cooling coils of Molasses tanks Cooling coils | 131 | 1 | per inch dia/feet length |
| 133 | 1.132 | Dismantling, fabrication, erection of MS pipe coil fitting at various station | 132 | 1 | - do - |
| 134 | 1.133 | Fabrication of Drum internal plates of boiler | 133 | 1 | Per piece |
| 135 | 1.134 | Dismantling, fabrication and erection of expansion joints of boiler | 134 | 1 | L.S.perexpension joint |
| 136 | 1.135 | Dismantling of Existing transient Heaters | 135 | 1 | Per piece |
| 137 | 1.136 | Shifting of new transient heater at site | 136 | 1 | Per piece |
| 138 | 1.137 | Erection of new/ existing transient heaters. | 137 | 1 | -do-- |
| 139 | 1.138 | Dismantling/ Fab./ Erection of weak portion of partition plates of juice heaters | 138 | 1 | L.S. per juice heater |
| 140 | 1.139 | Dis./ Repairing/ Fabrication & erection of bagasse belt conveyor on trunkey basis. | 139 | 1 | Lump sump |
| 141 | 1.14 | Dismantlingof Spurger of juice sulphiter for cleaning | 140 | 1 | per piece |
| 142 | 1.141 | Fabricationof Spurger of juice sulphiter for cleaning | 141 | 1 | -do- |
| 143 | 1.142 | Erection/refitting.of Spurger of juice sulphiter for cleaning | 142 | 1 | -do- |
| 144 | 1.143 | Dis, fab & erection of strainer of injection pump/spray pump | 143 | 1 | Per piece. |
| 145 | 1.144 | Injection channel jail dismantling, fab. & erection. | 144 | 1 | Per jali |
| 146 | 1.145 | Repairing of agitator of vaccum filter dismantling, fab. & erection. | 145 | 1 | Per agitator |
| 147 | 1.146 | Fabrication of sweeper trolley | 146 | 1 | Per piece |
| 148 | 1.147 | Repairing/ changing of vertical crystallizer arms in top gutter (scrapper type) round shape | 147 | 1 | Lump sump |
| 149 | 1.148 | ETP middle shaft repairing/ replacement | 148 | 1 | Lump sump |
| 150 | 1.149 | Fab of new lime tank with its shaft, stirer etc. at ETP | 149 | 1 | Lump sump |
| 151 | 1.15 | Dismantling, fab & erection of save all of evaporator bodies | 150 | 1 | Per save all |
| 152 | 1.151 | Replacement of juice sulphiter top | 151 | 1 | Lump sump |
| 153 | 1.152 | Dismantling of vibro screen | 152 | 1 | Per screen |
| 154 | 1.153 | Fabriaction of vibro screen | 153 | 1 | -do- |
| 155 | 1.154 | Erection of vibro screen | 154 | 1 | -do- |
| 156 | 1.155 | Repairing/ replacement of shell of sugar melter | 155 | 1 | PMT |
| 157 | 1.156 | Replacement of shaft of sugar melter | 156 | 1 | Per inch dia/ feet length |
| 158 | 1.157 | Replacemnet of arm of sugar melter | 157 | 1 | per feet length |
| 159 | 1.158 | Stair case ( With chequared plate) - Dismantling | 158 | 1 | Per step |
| 160 | 1.159 | Stair case ( With chequared plate) - Fabrication | 159 | 1 | -do- |
| 161 | 1.16 | Stair case ( With chequared plate) - Erection | 160 | 1 | -do- |
| 162 | 1.161 | Labour supply (per day 8 hours basis) - Fitter | 161 | 1 | Per person |
| 163 | 1.162 | Labour supply (per day 8 hours basis) - Welder | 162 | 1 | -do- |
| 164 | 1.163 | Labour supply (per day 8 hours basis) - Helper | 163 | 1 | -do- |
| 165 | 1.164 | Labour supply (per day 8 hours basis) - Khalasi | 164 | 1 | -do- |
| 166 | 1.165 | Juice heater cover dismantling, fab. & erection | 165 | 1 | Each |
| 167 | 1.166 | Juice heater Refitting with testing by pump. | 166 | 1 | -do- |
| 168 | 1.167 | Sight glass fitting in condensate bottle of seed & juice heaters/ any vessel,by welding the sight glass. | 167 | 1 | each |
| 169 | 1.168 | Dismantling, fabrication, erection of stainer of injection and spray pump | 168 | 1 | L.S. each. |
| 170 | 1.169 | Stair case at sugar bin fabrication & erection. | 169 | 1 | -do- |
| 171 | 1.17 | Vaccum crystallizer shell fabrication,erection & patch. | 170 | 1 | -do- |
| 172 | 1.171 | New planetary gear boxes for B massecuite crystallizer. | 171 | 1 | Per unit Lump sum |
| 173 | 1.172 | F.D. old impeller is to be removed and new is to be fitted and trial. | 172 | 1 | Lump sum |
| 174 | 1.173 | Straightening of old pipe line of thickness 6-8mm into plain sheet by rolling machine | 173 | 1 | PMT |
| 175 | 1.174 | To provide slide gate at B.C. Or desired size with rack &pinion. | 174 | 1 | Per gate |
| 176 | 1.175 | To provide a tapering suit under idler of B.C. To remove the falling bagasse in bagasse year. | 175 | 1 | Lump sum |
| 177 | 1.176 | Pan No. 4 mechanical circulator is to be dismantled and parts to be shifted to W | 176 | 1 | Per tail pipe |
| 178 | 1.177 | Pan No. 4 mechanical circulator to be dismantled and parts to be shifted to Workshop for machining. After machining the same circulator parts to be fitted and trial. | 177 | 1 | Lump sum |
| 179 | 1.178 | Pan/quad condenser tail pipe double support is to be provided with at least L 3”/pipe 2.1/2” with clamp system. | 178 | 1 | Per tail pipe |
| 180 | 1.179 | Rorimelter is to be fabricated and erected as per drg. | 179 | 1 | Lump sum |
| 181 | 1.18 | Replacement of ID fan ducting & casing. | 180 | 1 | Per sq. Mtr. |
| 182 | 1.181 | SS condenser repairing by support to be given by rings | 181 | 1 | L. S. each |
| 183 | 1.182 | Clear juice filter arrangement by jali fitting - dismantling, fabrication, erection | 182 | 1 | L.S. each. |
| 184 | 1.183 | Dismantling, fabrication, erection of strengthening of factory column, structure, channel, beam etc. | 183 | 1 | L.S. each column. |
| 185 | 1.184 | Juice heater header partition plate top & bottom both side - dismantling, fabrication, erection | 184 | 1 | L.S. each header |
| 186 | 1.185 | Oliver filter tray dismantling, fabrication, erection | 185 | 1 | L.S. each. |
| 187 | 1.186 | Centrifugal machine strengthning dismantling, fabrication & fitting from channel, beam | 186 | 1 | Per running feet |
| 188 | 1.187 | Dismantling, erection of SS tail pipe at pan & quad condenser | 187 | 1 | Per pipe. |
| 189 | 1.188 | Dismantling, fabrication, erection tail pipe support angle channel | 188 | 1 | each tail pipe.. |
| 190 | 1.189 | Dismantling, fabrication, erection of complete pug mill for continuous machine B - massecuite. | 189 | 1 | each pug mill |
| 191 | 1.19 | Repairing of bottom portion of hot water tank replacement. | 190 | 1 | Lump sump each. |
| 192 | 1.191 | Dismantling, fabrication, erection of sulphur furnace no. 2 complete scrubber with its internal pipes. | 191 | 1 | Lump sump each. |
| 193 | 1.192 | Dismantling, fabrication, erection of sulphur furnace no. 3 Lime side complete scrubber with its internal pipes. | 192 | 1 | Lump sump each. |
| 194 | 1.193 | SF melter and receiver steam jacket and its coil. | 193 | 1 | Lump sump each. |
| 195 | 1.194 | Dismantling, fabrication, erection of SO2 Gas coil/ pipe at syrup sulphiter. | 194 | 1 | Lump sump each. |
| 196 | 1.195 | Dismantling, fabrication, erection of save all at spare body of quad. | 195 | 1 | Lump sump each. |
| 197 | 1.196 | Dismantling of condensate pit. | 196 | 1 | Lump sump each. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed