Name of Work : 1.Strengthening the road from Vadugapatty to Ellapatty via Manjakkampatty, Elanthoppu KM 0/0-3/8 (working reach Km 0/0-1/1)
Sl.No.
Item Description
Unnamed: 2
Quantity
Units
1
1
1.Strengthening the road from Vadugapatty to Ellapatty via Manjakkampatty, Elanthoppu KM 0/0-3/8 (working reach Km 0/0-1/1)
1
No.
2
2
Clearing light Jungles including all labour charges for burrying and burning etc., complete.,
1
No.
3
3
Km 0/0 - 1/150
1380
Sqm
4
4
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS 20 A
1
No.
5
5
Km 0/0 - 0/680
612
Cum
6
6
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading etc., complete Shoulders
1
No.
7
7
Km 0/0 - 0/8
160
Cum
8
8
Km 1/0 - 1/15
30
Cum
9
9
Picking 5cm to 10 cm old metalled surface and sectioning 1 Sqm
1
No.
10
10
Km 0/0 - 1/150
1437.5
Sqm
11
11
Providing and laying 75mm compacted thick WBM Gr.III using 1 cum of 63 mm to 26.50 mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurrying rolling and consolidation by power roller and finishing has per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all other incidental charges etc., complete for top layer.
1
No.
12
12
Km 0/0 - 1/0
282.85
Cum
13
13
Km 1/0 - 1/15
42.19
Cum
14
14
Applying TACK COAT over WBM surface at 4.0Kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc., complete
1
No.
15
15
Km 0/0 - 1/15
4333.75
Sqm
16
16
Providing, laying and rolling of open- graded premix carpet of 20 mm thick composed of 13.2 mm to 5.60 mm aggregates eithe using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity , finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical specification Clause 508.
1
No.
17
17
Km 0/0 - 1/0
3771.25
Sqm
18
18
Km 1/0 - 1/15
562.5
No.
19
19
Provision for KM stones
1
No.
20
20
Provision for HM stones
6
No.
21
21
Provision for Name boards
1
No.
22
22
Provision for Sign boards
7
No.
23
23
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}\n(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.