| 1 | 1 | Maintenance and Operation of NCS and Command swimming pool pump house water supply installation consisting of fresh water pump sets , waste water pump sets and Valves on all working days including every Saturdays /Sundays /Holidays in two shifts (i.e. 0400 hrs to 2000 Hrs) for pumping and distribution of fresh water to NCS and Commond Swimming pool as and when required . Also carry out Minor Repair as and When required to all Machines/Equipments and valves to ensure 100% serviceablity of plants and removing grass/ surface dressing from surrounding area all as specified and directed.\n | | 11 | Per Month |
|---|
| 2 | 2 | Maintenance and Operation of old swimming pool pump house water supply installation consisting of fresh water pump sets, waste water pump sets and Valves on one shift( ie 0800 hrs to 1600 hrs ) (One FGM required each shift of 8 hrs ) for pumping and distribution of fresh water to old swimming pool as and when required .Also carry out Minor Repair as and When required to all Machines/Equipments and valves to ensure 100% serviceablity of plants and removing grass/ surface dressing from surrounding area, all as specified and directed by the Engineer - in - charge. \n\n\n | | 11 | Per Month |
|---|
| 3 | 2.1 | Notes for Serial item No 1 & 2:-Daily routine maintenance tasks include the following:-\n(a) Checking of all parts of the plants for its functional stability.\n(b) Caliberating and dozing the plant to obtain variable dosage 2 PPM at user's end.\n(c) Testing chlorinated water for correct dosage.\n(d) Routine maintenance tasks shall be carried out from 0800 hrs to 1600 hrs. Record of testing/dosage/time of checking, maintenance carried out etc. shall be maintained separately for each plant by the contractor.\n(e) Spares for replacement if any will be measured and paid seperately as supply only as per requirement. Labour and consumables equired for replacement of spares shall deemed to be included in the unit rate quoted by the contractor. | | | |
|---|
| 4 | 2.2 | (f) Suction sweeping the bottom of the entire pool for a period of two hours (4 AM to 6 AM) or as required to clean the water for bailing out the sediments. \n(g) Removing all floating particles by using net before 6 AM. \n(h) Cleaning of command swimming pool every Monday & Thursday including brushing inside the entire pool having bottom area 1540 Sqm, side wall having an area 515 Sqm, 172 meter long scum channel and having 667500 gallons entire capacity of water. \n(j) Cleaning of old swimming pool every Tuesday & Friday including brushing inside the entire pool having bottom area 380 Sqm, side wall having an area 168 Sqm, 84 meter long scum channel and having 107000 gallons entire capacity of water.\n(k) Backwashing of the filter media by operating various control valves accommodated with the filtration plant adequately with trained operators to removing sludge clogged inside the filter media directly to the outside drainage without entering into the swimming pool once in a week (Command and Old Swimming pools). \n\n | | | |
|---|
| 5 | 3 | Maintenance and Operation Filtration Plant at Diving School installation consisting of fresh water pump sets, waste water pump sets and Valves on one shift( ie 0800 hrs to 1600 hrs ) (One FGM required each shift of 8 hrs ) for pumping and distribution of fresh water to Diving Pool as and when required . Also carry out Minor Repair as and When required to all Machines/Equipments and valves to ensure 100% serviceablity of plants and removing grass/ surface dressing from surrounding area, all as specified and directed by the Engineer - in - charge. \n\n\n | | 11 | Per Month |
|---|
| 6 | 3.1 | Notes for Serial Item No 01 to 03 :-\nDaily routine maintenance tasks include the following:-\n(a) Checking of all parts of the plants for its functional stability.\n(b) Caliberating and dozing the plant to obtain variable dosage 2 PPM at user's end.\n(c) Testing chlorinated water for correct dosage.\n(d) Routine maintenance tasks shall be carried out from 0800 hrs to 1600 hrs. Record of testing/dosage/time of checking, maintenance carried out etc. shall be maintained separately for each plant by the contractor.\n(e) Spares for replacement if any will be measured and paid seperately as supply only as per requirement.Labour and consumables required for replacement of spares shall deemed to be included in the unit rate quoted by the tenderer.(f) Adding requisite quantity of chemicals considering the condition of the pool water while dozing as follows:- \n (i) Dozing requisite quantity of Calcium Hypochlorite and bleaching\n powder through dozing system for maintaining the percentage of chlorine\n up to 2 PPM every day (0700 Hrs to 2100 Hrs). \n (ii) Dozing requisite quantity of alum through alum dozer for better \n sedimentation of impurities in the pool water.\n (iii) Dozing requisite quantity of soda ash through soda ash dozer for \n maintain the PH level of pool water between every day\n (0700 Hrs to 2100 Hrs).\n (iv) Add sodium hypo chloride for maintaining the percentage of chlorine\n up to 2 PPM every day.\n\n\n | | | |
|---|
| 7 | 3.2 | BASIC RATE, EPF, ESIC, BONUS, OVER HEAD PROFIT, TAXES & LWC\nThe bidder to quote basic rate, employer's contribution towards Employees Provident Fund (EPF) liability, contribution towards Employees State Insurance Corporation (ESIC), contribution towards bonus, overhead and profit and labour welfare cess (LWC) separately, as applicable depending upon the manpower requirement. This will create onus on the contractor to ascertain the relevant rates and quote accordingly. The rates quoted shall be inclusive of all taxes, cess, and levies as applicable including GST.\nPlease Note that at the time of bid evaluation, Accepting Officer shall ascertain the corresponding minimum wages, rates and contribution as mentioned above as per prevailing notifications and decide the reasonability of finance bid of all the bidders. Tender shall contain stipulation that any quoted rate against the items/sub-items mentioned above which corresponds to/works out to lower than the corresponding prevailing minimum rates of wages/subscription/contribution towards EPF, ESIC, Bonus and LWC shall be treated as non-bonafide and such bid shall not be considered for acceptance. The prevailing rate/wage/contribution shall be as applicable on the bid submission end date.\nThe quoted rate against bonus is to be considered for payment on actual basis that the amount is payable only after submission of valid and authentic document in support of having paid the requisite amount of bonus to the workmen, i.e., proof of payment. Similarly items/sub-items of ‘contribution towards EPF and ‘contribution towards ESIC shall also be payable after submission of valid & authentic documents in support of proof of payment.\n | | | |
|---|
| 8 | 3.3 | GST LIABILITY \n It is considered prudent to specify that the GST is included in the rates quoted against items of outsourcing as well as items of repairs/comprehensive maintenance to be paid separately under material and labour’ parts. Any variation in tax (including variation in GST rate) shall be adjusted and reimbursed to/recovered from the contractor as mentioned hereinafter. \nMONTHLY WAGES\n Monthly wages shall be paid by the contractor to the workers/labour only online. Proof of statutory deductions in favour of workers/labour shall be submitted by the contractor to the GE. The contractor will be required to submit copy of valid labour licence from the Labour Commissioner within 15 days of commencement of the work. If the contractor fails to submit the same within this stipulated period, the contact shall be liable to be cancelled and the Performance Security of the firm shall be forfeited accordingly.\n | | | |
|---|
| 9 | 4 | Supply only bleaching powder ISI marked superior quality. Make- Kaveri / Grasim / Vikram | | 500 | Kg |
|---|
| 10 | 5 | Supply only Copper Sulphate. \nMake - VCI Ltd / Reliance gijaarath | | 150 | Kg |
|---|
| 11 | 6 | Supply only Soda Ash.\nMake - DCW Ltd / TATA / VCI ltd | | 3400 | Kg |
|---|
| 12 | 7 | Supply only Alum Sulphate.\nMake - Comercial | | 300 | Kg |
|---|
| 13 | 8 | Supply only Sodium Hypocloride.\nMake - DCW Ltd / TATA / VCI Ltd) | | 350 | Kg |
|---|
| 14 | 9 | Supply only Calcium Hypochlorite Granules disinfectant for water tretment having chlorine content (60-70) % all as specified. | | 2500 | Kg |
|---|
| 15 | 10 | Supply only poly aluminimum cloride (PAC) COAGULANT CONTAINING APPROX 29% Al2O3 with bacity of approx 64% packed all as specified.\nMake : Rayalaseema chemicals / Potter & Watts / Grasim industries | | 2175 | Kg |
|---|
| 16 | 11 | Supply only Ortho- Toliding solution for testing of disolved chlorine in water | | 12 | Ltr |
|---|
| 17 | 12 | Material & Labour in repair open pressure filter of capacity 120 Cum/hr , drain out water remove all filters media(sand & pebbles) cleaning the internal surface and applying one coat of anti corrosive bituminous paint pebbles duly washed and cleaned with fresh water and reassembly the filter testing and commissioning complete all as specified and directed. | | 3 | No |
|---|
| 18 | 13 | Supply and fix set of seven pieces of chlorination tablets chlorine granules containing algaecide and coagulation of size of 50.80mm in dia meter (pack in floating plastic sealed dissoluble packet with arrangement for appropriate water contact with the tablets and circulation through the plastic packets, with arrangement for string for hanging suitable for disinfection algae control and coagulation of swimming pool water. Disinfection capacity is eight lakh forty thousand liters of water to obtain free chlorine of 0.5 ppm at release replacement indication visual & weight variation)\nMake: Grasim Ltd / Pottar &watts.\n | | 60 | Set of Seven |
|---|
| 19 | 14 | Material & Labour Quartz sand in two grades replacement in the filter grade size 16/30mm or 6/3 mm complete all as specified and as a directed. | | 10000 | Kg |
|---|
| 20 | 15 | Supply and fixing MS Butter fly valve 200mm dia complete all as specified and directed\nMake :- Zoloto / Kirloskar / Kartar | | 1 | Each |
|---|
| 21 | 16 | Supply and fixing MS Buffer type NRV 200mm dia all as specified and directed\nMake :- Zoloto/Kirloskar /Kartar | | 1 | Each |
|---|
| 22 | 17 | Material & Labour dismantling unserviceable electric motor 2 HP capacity 50Hz 400/415 Volts 3 phase from existing LT panel board removing carefully taking out old burn out winding cleaning of slots , motor and stator complete , rewinding the motor with super enameled copper winding wire of same gauge as per existing pattern with proper material apply two coat of varnish and heating of windings, reassembled the motor, re fixing in the same location testing and commissioning of motor on full load to the entire satisfaction of Engineer In charge. | | 1 | Each Job |
|---|
| 23 | 18 | Supply and fix UPVC butter fly valve of size 150mm dia including taking down the old unserviceable butter fly valve complete all as specified and directed \nMake: - Supreme / Katax\n | | 4 | Each\n Job |
|---|
| 24 | 19 | Supply and fix three core flat cable of size 10 sqmm with bare bunched copper conductor insulated with PVC and sheathed with PVC for suction sweeper pumps with voltage grade up to 1100 volts generally conforming to IS 694: 1990 complete all as specified and directed by Engineer in charge. \nMake :- Havells/Finolex/Gloster\n | | 50 | RM |
|---|
| 25 | 20 | Material & Labour Cleaning of RCC Balancing tank of capacity 50,000 Liters complete all as specified and directed by Engineer in charge. | | 1 | Each Job |
|---|
| 26 | 21 | Material & Labour for scrubbing & cleaning thoroughly for removing the dirt, sediments, silts etc from the internal surfaces of HDPE storage tank of 5000 liters capacity (bottom and wall) by using brushes, bleaching powder and other cleaning materials as required. | | 8 | Each Job |
|---|
| 27 | 22 | Material and labour for disconnecting of suction and delivery pipe and electric connections, from three phase centrifugal pump sets motor of 10 HP capacity and dismantling the pump sets complete from the foundation, strip opening the unserviceable motor at site to locate the fault and transporting to the local work shop. Strip opening the motor and cutting/removing burnt out winding and rewinding the motor with as per existing original wire gauge super enameled copper wire including high quality 'F' class insulating material with heat resistant sleeves, sealing compound and varnishing and heating the starter upto varnish fully dry and testing the motor at work shop to the satisfaction of Engineer-in-charge. Coupled the motor with pump and installed at site as per existing position. Testing the pump set after completion of work complete all as specified and directed. | | 3 | Job |
|---|
| 28 | 23 | Material and labour for disconnecting of suction and delivery pipe and electric connections, from three phase sweeping motor 5 HP capacity and dismantling the pump sets complete from the trolley, strip opening the unserviceable motor at site to located the fault and transporting to the local work shop . Strip opening the motor and cutting/removing burnt out winding and rewinding the motor with as per existing original wire gauge super enameled copper wire including high quality 'F' class insulating material with heat resistant sleeves, sealing compound and varnishing and heating the starter upto varnish fully dry and testing the motor at work shop to the satisfaction of Engineer-in-charge. Coupled the motor with pump and installed at site as per existing position. Testing the pump set after completion of work, complete all as specified. | | 2 | Job |
|---|
| 29 | 24 | Supply and fix Framed / Fabrication work for , such as Valve chamber covers, Static Tank Cover, Base frames for pump sets , Protection covers for Pump sets / Panel Boards, Staging for Water tanks, ladders, etc. complete all as specified and directed. | | 150 | Kg |
|---|
| 30 | 25 | Amount of Credit Schedule shall be deducted to arrive the Contract Sum. | | | |
|---|