Maintenance Repair Potch Patch Work In Km 203P , 204P, 205P, 206P, 207P, 209P, 212P, 216P, 219P, 221P, 228P,229P, 230P, 231P, 233P, 234P,235P, 240P , 241P, 242P And 245P For The Year 2020 21 Under . Nh Division Gaya
Tender Overview
Project Description
Maintenance Repair Potch Patch Work In Km 203P , 204P, 205P, 206P, 207P, 209P, 212P, 216P, 219P, 221P, 228P, 229P, 230P, 231P, 233P, 234P, 235P, 240P , 241P, 242P And 245P For The Year 2020 21 Under . Nh Division Gaya
BOQ
| Name of Work: M/R ( Potch - Patch ) Work in Km 203 (p) , 204 (p), 205 (p), 206 (p), 207(p), 209(p), 212(p), 216 (p), 219 (p), 221(p), 228(p),229(p), 230(p), 231(p), 233(p), 234(p),235(p), 240(p) , 241(p), 242(p) and 245(p) For The Year 2020-21 Under NH DIVISION GAYA | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) By Manual Means ( Bituminous courses )\n\n | Item 1 | 150.84 | M3 |
| 2 | 2 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. | Item 2 | 7678.16 | M3 |
| 3 | 3 | Bituminous Macadam (Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction) for GradingII(19 mm nominal size)\n | Item 3 | 24.77 | M3 |
| 4 | 4 | Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects) for Grading-II(10 mm nominal size)\n | Item 4 | 215.48 | M3 |
| 5 | 5 | Maintenance of Earthen Shoulder (filling with fresh soil) (Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.) | Item 5 | 2281.5 | M2 |
| 6 | 6 | Total | Item 6 | 1 | Rs. |
| 7 | 7 | GST@ 12% | Item 7 | 1 | Rs. |
| 8 | 8 | Labour Cess @1% | Item 8 | 1 | Rs. |
| 9 | 9 | Add Seigniorage Fee | Item 9 | 1 | Rs. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender