Maintenance/2019-2020 Ndd-14 Special Repairs 2019-2020 To Tq . Border Takalgaon-Borgaon-Joshisangvi Tq Border Road Odr-42 Tq . Loha Km 3 00 To Km 9 930
Tender Overview
Project Description
Maintenance/2019-2020 Ndd-14 Special Repairs 2019-2020 To Tq . Border Takalgaon-Borgaon-Joshisangvi Tq Border Road Odr-42 Tq . Loha Km 3 00 To Km 9 930
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 19-Sep-2020 | corrigendum 1 | Fee | 29-Sep-2020 |
| 2 | 30-Sep-2020 | corrigendum 2 | Date | 06-Oct-2020 |
BOQ
| Name of Work -Special repair 2019-2020 to Tq.Border Takalgaon-Borgaon-Joshisangvi Tq Border Km 3/00 to Km 9/930 Tq Loha .Dist:-Nanded | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | BI01010001010000000000000515BI0100001121 | 24300 | Sqm |
| 2 | 2 | Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | BI01010001010000000000000515BI0100001122 | 24300 | Sqm |
| 3 | 3 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.250 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.( Over B.T Surface ) | BI01010001010000000000000515BI0100001123 | 24487 | Sqm |
| 4 | 4 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. | BI01010001010000000000000515BI0100001124 | 24487.5 | Sqm |
| 5 | 5 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 | BI01010001010000000000000515BI0100001125 | 24487.5 | Sqm |
| 6 | 6 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. | BI01010001010000000000000515BI0100001126 | 196.88 | Cum |
| 7 | 7 | Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201. | BI01010001010000000000000515BI0100001127 | 1.05 | Hect |
| 8 | 8 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting with vibratory roller to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | BI01010001010000000000000515BI0100001128 | 1137 | Cum |
| 9 | 9 | Maintenance of Causeway by way of minor Surface repairs, replacing Guide Posts, repair of flood gauges, removal of debris, providing boulders and protection work and painting as per technical specification Clause 1909 | BI01010001010000000000000515BI0100001129 | 100 | Rmt |
| 10 | 10 | Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. | BI01010001010000000000000515BI0100001130 | 30 | Cum |
| 11 | 11 | Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 | BI01010001010000000000000515BI0100001131 | 130.5 | Cum |
| 12 | 12 | Providing & Placing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203(M-10) | BI01010001010000000000000515BI0100001132 | 23 | Cum |
| 13 | 13 | Providing & Placing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203(M-15) | BI01010001010000000000000515BI0100001133 | 68 | Cum |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender