Northern Railway-NR has published Tfr - 26.384 Km And Other Related Works On Rpj-Bti-Sgnr & Ldh-Jhl-Hsr Section Under Sr.Den-Ii/Umb.. Submission Date for this Tender is 28-09-2020. Track Work Tenders in Haryana. Bidders can get complete Tender details and download the document.
0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | |
---|---|---|---|---|---|---|---|---|---|
0 | S.No. | Item\rCode | Item Qty | Qty Unit | Unit Rate | Basic Value | Escl.(%) | Amount | Bidding\rUnit |
1 | Schedule 01-Part- A for N.S. Items. | 3380957.33 | |||||||
2 | 1 | 01 | 87595.00 | Numbers | 13.97 | 1223702.15 | AT Par | 1223702.15 | Above/\rBelow/Par |
3 | Description:- Complete item rate for Through Fitting Renewal of B. G running track at site under traffic block by\rmanual labour with contractors own lab. , T & Ps, all taxes, GST etc. complete job, as per direction of engineer in\rcharge and as per IRPWM. New material will be supplied at SSE / P / WAY store. Leading of New / Released\rmaterial to site of work from SSE / P / WAY store and vise versa shall be done by the contractor without any extra\rpayment. Work shall be done without damaging to PRC sleeper and lose of material. In case sleeper damaged\rbeyond repair, the contractor will pay the full cost of sleeper at prevailing market rate and slightly damaged will be\rrequired to repair with epoxy. The unit of this item is "Numbers" which means per rail seat which involves 2 ERCs,\r2 Liners & 1 Rubber pad; i.e. each PRC sleepers has 2 rail seats. nothing extra shall be paid except the accepted\rrate what so ever the case so may be. | ||||||||
4 | 2 | 01 | 26384.00 | Per Track\rMetre | 19.60 | 517126.40 | AT Par | 517126.40 | Above/\rBelow/Par |
5 | Description:- Item rate for Destressing of LWR panels of 60/52kg rails up to required length as per site with or\rwithout rail tensor at appropriate temperature as per CWR/LWR manual- 1996 edition ( Corrected upto date) and\rIRPWM, CE circulars etc and as per instructions of site incharge. Rate shall include replacement & recoupment of\rall fittings such as grooved rubber pads, liners, ERCs etc. ( Material such as grooved rubber pads, liners, ERCs\rwill be supplied by railway free of cost) The work will be done with contractors own labour, equipments i.e. rollers,\rtensor, thermometers etc. including squaring and re-pacing of sleepers, disturbed during work . loosening of\rfittings & tightening of all fittings etc. Nothing extra will be paid except the accepted rates. | ||||||||
6 | 3 | 01 | 35038.00 | Each | 19.16 | 671328.08 | AT Par | 671328.08 | Above/\rBelow/Par |
7 | Description:- Item Rate for Removing corroded jammed ERC/Pandrol clips by heating with gases and welding\requipment etc. at site under traffic and refixing after cleaning with suitable brush eye of inserts pandrol and\rsurface of flange of rail having contact under liner including applying anticorrosive paint or grease wherever\rrequired as per instruction of site Engineer with GFN/Metal liners and rubber pads complete. New fittings will be\rsupplied by Railways free of cost at SE/P.way's store and leading of new fittings will be done by the contractor at\rhis own cost and vice-versa. Work will be carried out without damaging PRC sleepers, for any sleeper damaged\rbeyond repair the cost of sleeper will be borne by contractor prevailing to market rate and lightly damaged\rsleepers shall be repaired by contractor with Epoxy cement at his own cost. So nothing extra will be paid to the\rcontractor except the accepted rate, whatsoever the case may be. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail