Improvement Of Fulidanga Surrounding Karmatirtha Building Area Under Trda ( Phase-Ii )
Tender Overview
Project Description
Improvement Of Fulidanga Surrounding Karmatirtha Building Area Under Trda ( Phase-Ii )
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 24-Aug-2020 | Corrigendum | Other | 09-Sep-2020 |
BOQ
| Name of Work:\"Improvement of Fulidanga surrounding Karmatirtha Building area under TRDA\".(Phase-II) | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Providing and laying Design Mix concrete for plain /\nreinforced concrete work in any part of bridge\n(excluding bottom plugging) with coarse\naggregates of appropriate nominal size and\ngrading, fine aggregate (sand) conforming to\nproper grading zone, both of approved quality and\ncement, as necessary, including labour, cost and\ncarriage of all materials and including preparation\nof design mix, approval of the same by the\nEngineer-in-Charge and cost for quality control,\nsampling, testing etc. all complete but excluding cost of labour and materials for formwork &\nreinforcement works.\n(a) M-15 Grade Using concrete mixer. | 168 | cum | |
| 2 | 2 | 100 mm thick interlocking designer concrete paver block M-50 grade for hightraffic zone, bus terminus, industrial complex, mandi houses etc. as per IS: 15658-\n2006 (over 20-40 mm medium sand bed on 250mm thk WBM/ WMM base course\n& 250 mm thk bound gnaular/ granular sub-base course & filling the interstices\nof blocks with fine sand by brooming & subsequent watering including cost of\nsand for sand bed but excluding cost of base, sub-base course & subgrade\npreparation.) complete as per direction of Engineer-in-Charge.\n[Note: Subgrade CBR shouldnot be less than 5]\nColour Decorative | 1680 | sqm | |
| 3 | 29 | CGST + SGST ( 12 % ) | 1 | Item | |
| 4 | 30 | Cess ( 1 % ) | 1 | Item |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender