Construction Of 2 . 70 Km Of Ht Abc Oh Line Construction Of 2 . 70 Km Of Ht Abc Line From 220 Kv Punnapra Substation Up To Superspeciality Block T D Medical College Vandanam
Tender Value
6.83 Lakhs
Estimated cost
Bid Submission
31 Aug 2020
0 days left
EMD
17100
Bank guarantee accepted
Document Fee
1652
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Punnapra → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of 2 . 70 Km Of Ht Abc Oh Line Construction Of 2 . 70 Km Of Ht Abc Line From 220 Kv Punnapra Substation Up To Superspeciality Block T D Medical College Vandanam
BOQ
| Name of Work:Constructing 2.7 km of HT ABC O H Line from Punnapra 220 kV Substation to the compound of Superspeciality block T D Medical College Alappuzha under Electrical Section, Alappuzha. | |||||
|---|---|---|---|---|---|
| Item Code | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 103 | Loading HT PSC Poleto Hand Cart from the stacking place and unloading the same at worksite | item1 | 59 | No |
| 2 | 104 | Transporting one HT PSC pole by Hand Cart (Limited to 4km) | item2 | 59 | P/KM |
| 3 | 105 | Loading HT A type pole to hand cart from the starting place and unloading the same at work site. | item3 | 2 | No |
| 4 | 106 | Transporting one A type pole by Hand Cart (Limited to 4km) | item4 | 2 | P/KM |
| 5 | 112 | Fitting and erecting one HT PSC pole in position incl.fitting cross arm, digging and back filling pit, drawing earth leads | item5 | 20 | No |
| 6 | 116 | Fitting and erecting one HT DP using PSC pole in position incl.fitting two channel cross arms, digging and back filling pit, drawing earth leads. | 2 | No | |
| 7 | 119 | Fitting and providing one HT stay for 11 KV pole incl.digging and back filling pit. | 24 | No | |
| 8 | 122 | Fitting and providing one HT fly stay for 11 KV pole using HT PSC pole incl. digging and back filling pits. | 1 | No | |
| 9 | 124 | Insertion of one HT PSC pole in existing line incl. digging and back fillig pit, fitting cross arm, insulators, binding etc | 16 | No | |
| 10 | 125 | Insertion of one HT A type pole in existing line incl. digging and back fillig pit, fitting cross arm, insulators, binding etc | 2 | No | |
| 11 | 127 | Additional rate for excavation of one pit for HT pole/ HT stay in Laterite | 5 | No | |
| 12 | 138 | Fitting 6 channel cross arms, AB switch, DO fuse, LA, HT and LT connections on existing DP, 5 pipe earthing, 3 LT fuses. | 3 | No | |
| 13 | 141 | Erecting one CT/PT unit to existing DP and giving connections incl. loading and unloading, excluding transportation | 1 | No | |
| 14 | 152 | Installing one Border Meter with box on existing poles and giving the complete connections incl. conveyance of materials. | 1 | No | |
| 15 | 156 | Fitting one additional fuse unit and giving connection from transformer to fuse and DB to LT OH line | 1 | No | |
| 16 | 158 | Providing one driven earth using GI earth pipe at standard distance away from pole bar structure in loose soil | 18 | No | |
| 17 | 167 | Fitting one set AB switch, giving connection and earthing the same using one earth pipe incl. digging and back filling pit. | 1 | No | |
| 18 | 168 | Conveyance of 1 km 11 kV line materials from section store/ Stacking place to the work site( Excluding poles). | 1.5 | Km | |
| 19 | 170 | Fitting one additional 75 x 40 mm, 1.8 m channel cross arm in existing single pole incl. conveyance of materials | 9 | No | |
| 20 | 186 | Insertion of one HT PSC pole in existing HT/ LT line incl. digging and back fillig pit, fitting cross arm, insulators, binding etc | 18 | No | |
| 21 | 363 | Drilling hole of various sizes on existing channel cross arm | 11 | No | |
| 22 | 451 | Dismantling and reconnectiong SP service connection from the OH line incl. lowering down the WP portion. | 22 | No | |
| 23 | 452 | Dismantling and reconnectiong TP service connection from the OH line incl. lowering down the WP portion. | 3 | No | |
| 24 | 553 | Dismantling one damaged LT PSC/ RCC pole after disconnecting stays, strut etc and stacking the same. | 6 | No | |
| 25 | 554 | Dismantling (without damage) LT PSC/ RCC pole after disconnecting stays, strut etc and stacking the same. | 12 | No | |
| 26 | 568 | Dismantling one section fuse | 1 | No | |
| 27 | 610 | Dismanting one ordinary street light/CFL/ LED fitting from existing pole and refitting the same on newly erected pole and reconnecting. | 4 | No | |
| 28 | 926 | Excavation of cable trench in all classes of soil and back filling after laying of cable( excluding laying of cable) | 15 | m | |
| 29 | 927 | Additional rate for excavation of cable trench in exceptionaly hard conditions(like in ordinary rock) | 15 | m | |
| 30 | 929 | Laying HT XLPE UG cable (of sizes beyond 3x 185 sq.mm and upto 3 x 300 sq.mm) as per specification excl. excavation and back filling. | 15 | m | |
| 31 | 933 | Doing one cable end termination on cables of sizes beyond 3 x 185 sq.mm upto 3 x 300 sq.mm using the cable jointing kit supplied departmentally | 2 | No | |
| 32 | 934 | Mountig the cable ends of all sizes upto 3 x 300 sq.mm with special type cable clamps incl. cost of extra materials if needed and giving necessary connections | 2 | No | |
| 33 | 952 | Providing concrete muffing ( 0.45 x 0.45 x 1.5 m) incl. of cost of all materials( as per specification) | 2 | No | |
| 34 | 1021 | Stringing of 11 KV arial bunched cable XLPE insulated of size 3 x 150 + 1 x 120 sq.mm with bare/ insulated messenger | 2.7 | Km | |
| 35 | 1027 | Erection of anchor/ dead end clamp of 11 KV ABC suitable for 70 to 120 sq.mm bare/insulated messenger | 75 | No | |
| 36 | 1028 | Erection of suspension clamp of 11 KV ABC suitable for 70 to 120 sq.mm bare/insulated messenger | 140 | No | |
| 37 | 1034 | Providing Cable Tie | 500 | No | |
| 38 | 1055 | 11 KV AB Cable T joint installation for 3 Core | 10 | No | |
| 39 | 1057 | 11 KV AB Cable Termination installation for 3 Core | 18 | No | |
| 40 | 1059 | Providing of spiral earthing | 20 | No | |
| 41 | 1065 | Providing earth connector | 20 | No | |
| 42 | 1066 | Erection of Stainless steel strap and buckle at one location(2 m steel strap and 2 buckle) | 250 | No |
AI Tender Summary
Tender Timeline
Aug 20, 2020
11:30 IST
Tender Published
Tender notice published.
CompletedAug 31, 2020
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedSep 07, 2020
Bid Opening Date
Technical bids will be opened and evaluated.