Supply Of Online Monitoring Of Rolling Stock ( Omrs ) Consisting Of Acoustic Bearing Detector ( Abd ) & Wheel Impact Load Detector ( Wild ) , As Per Specification No. Cofmow / Ir / Omrs / 2020-21, Cost Of Any Other Accessory Which In The Opinion Of Supplier Is Essentially Required For Making The Complete Omrs System Fully Functional. Detailed Break Up Of Items With Cost Per Unit To Be Attached With The Financial Bid., Cost Of The Supply Of Wayside Data Collection Components With Requisite Cabling ( As Specified At Clause 3 ( A ) Of Section - Iv Of Bid Document Part-Ii ) As Per Annex-A Of Specification Cofmow / Ir / Omrs / 2020-21., Cost Of Turnkey Charges Viz. Foundation, Installation & Commissioning Of Wayside Data Collection Components With Requisite Cabling., Cost Of Preventive Maintenance During 1St, 2Nd& 3Rd Year Of Warranty Period For Wayside Data Collection Components With Requisite Cabling ( Annexure-E Of Section-V ) ., Cost Of Comprehensive Amoc For Wayside Data Collection Components With Requisite Cabling For Two Years Post Warranty As Per Clause 1.9 Of Specification Cofmow / Ir / Omrs / 2020-21 ( Annexure-E Of Section-V ) . Warranty Period: 3 Years, Amc Period: 2 Years, Rate Of Discounting: 10 %, Cost Of Providing Equipment Hut With Necessary Instrumentation And Software For Acoustic Signature Analysis Of Bearing Detection And Wheel Impact Detection And Integration With Other Data Stream Cost Of Providing Equipment Hut With Necessary Instrumentation And Software For Acoustic Signature Analysis Of Bearing Detection And Wheel Impact Detection And Integration With Other Data Stream Including Vehicle Identification, Network Data Connectivity Software & Infrastructure From Site To Control Room And Provisions For Online Ups ( As Specified At Clause 3 ( B ) Of Section - Iv Of Bid Document Part-Ii ) , Cost Of Turnkey Charges Viz. Foundation, Installation & Commissioning Of Equipment Hut ( As Specified In Clause 3 ( B ) Of Section - Iv Of Bid Document Part-Ii ) ., Cost Of Preventive Maintenance During 1St, 2Nd& 3Rdyear Of Warranty Period For Equipment Hut ( As Defined In Clause 3 ( B ) Of Section - Iv Of Bid Document Part-Ii ) ( Annexure-E Of Section-V ) ., Cost Of Comprehensive Amoc For Equipment Hut ( As Specified In Clause 3 ( B ) Of Section - Iv Of Bid Document Part-Ii ) For Two Years Post Warranty As Per Clause 1.9 Of Specification Cofmow / Ir / Omrs / 2020-21 ( Annexure-E Of Section-V ) . Warranty Period: 3 Years, Amc Period: 2 Years, Rate Of Discounting: 10 %, Cost Of Audio-Visual Alarm Node With Peripherals Such As 500 Va Ups, Lan Patch-Up Equipments Etc. For Connecting To The Ir Network At The Carriage & Wagon Divisional And Headquarter Controls With Facility For Real Time Alarms ( As Specified At Clause 3 ( D ) Of Section - Iv Of Bid Document Part-Ii ) ., Cost Of Turnkey Charges Viz. Foundation, Installation & Commissioning Of Audio-Visual Alarm Node With Peripherals Such As 500 Va Ups, Lan Patch-Up Equipments Etc ( As Specified At Clause 3 ( D ) Of Section - Iv Of Bid Document Part-Ii ) ., Cost Of Preventive Maintenance During 1St, 2Nd& 3Rdyear Of Warranty Period For Audio-Visual Alarm Node With Peripherals Such As 500 Va Ups, Lan Patch-Up Equipments Etc ( As Specified At Clause 3 ( D ) Of Section - Iv Of Bid Document Part-Ii ) . ( Annexure-E Of Section-V ) ., Cost Of Comprehensive Amoc For Audio-Visual Alarm Node With Peripherals Such As 500 Va Ups, Lan Patch-Up Equipments Etc ( As Specified At Clause 3 ( D ) Of Section - Iv Of Bid Document Part-Ii ) For Two Years Post Warranty As Per Clause 1.9 Of Specification Cofmow / Ir / Omrs / 2020-21 ( Annexure-E Of Section-V ) . Warranty Period: 3 Years, Amc Period: 2 Years, Rate Of Discounting: 10 %, Cost Of Setting Up Of Central Data Control Cum Training Centre ( As Defined In Clause 3 ( E ) Of Section - Iv Of Bid Document Part-Ii ) With Necessary Software, Database, Network Data Connectivity Infrastructure To Railnet And Internet, Provision For Network Security And Monitoring, Large Display System, Lighting, Air-Conditioning, Signage And Furnishing. ( As Per Annexure-G Of Section-V ) ., Cost Of Preventive Maintenance For Central Data Control Cum Training Centre ( As Defined In Clause 3 ( E ) Of Section - Iv Of Bid Document Part-Ii ) During 1St, 2Nd& 3Rd Year Of Warranty Period ( Annexure-E Of Section- V ) ., Cost Of Comprehensive Amoc For Central Data Control Cum Training Centre ( As Defined In Clause 3 ( E ) Of Section - Iv Of Bid Document Part-Ii ) For Five Years Post Warranty As Per Clause 1.9 Of Specification Cofmow / Ir / Omrs / 2020-21 ( Annexure-E Of Section-V ) . Warranty Period: 3 Years, Amc Period: 5 Years, Rate Of Discounting: 10 %, Cost Of Human Resource For Three ( 03 ) Years For Operation Of Central Data Control Cum Training Centre ( As Per Annexure-G Of Section-V ) During The Warranty Period ( 1 No., Means 1 Shift Of 8 Hours ) ., Cost Of The Supply Of Camera Based Identification System Pvis ( Photographic Vehicle Identification System ) For Ir Vehicle ( As Specified At Clause 3 ( J ) Of Section - Iv Of Bid Document Part-Ii ) ., Cost Of Turnkey Charges Viz. Foundation, Installation & Commissioning Of Camera Based Identification System Pvis ( Photographic Vehicle Identification System ) For Ir Vehicle ( As Specified At Clause 3 ( J ) Of Section - Iv Of Bid Document Part-Ii ) ., Cost Of Preventive Maintenance During 1St, 2Nd & 3Rd Year Of Warranty Period For Camera Based Identification System Pvis ( Photographic Vehicle Identification System ) For Ir Vehicle ( Annexure-E Of Section- V ) ., Cost Of Comprehensive Amoc For Camera Based Identification System Pvis ( Photographic Vehicle Identification System ) For Ir Vehicle For Two Years Post Warranty As Per Clause 1.9 Of Specification Cofmow / Ir / Omrs / 2020-21 ( Annexure-E Of Section-V ) . Warranty Period: 3 Years, Amc Period: 2 Years, Rate Of Discounting: 10 %, Training Charges For 300 Man Days As Per Para 1.5.1 Of Section-V Of Bid Document Part-Ii., Cost Of Any Other Accessory Which In The Opinion Of Supplier Is Essentially Required For Making The Central Data Control Cum Training Centre Fully Functional. Detailed Break Up Of Items With Cost Per Unit To Be Attached With The Financial Bid., Cost Of Power Cable ( 2 Core Armoured 35 Sq Mm, 230V +-10V ) Per Meter Including Duct And Laying And Boring With Duties And Taxes, Freight Etc., Cost Of Ofc Cable ( 6 Core Corrugated Armoured To Spec Irs: Tc: 55 / 2006 Rev. 1 Amdt No.1.1, 2.0 & 3.0 ) Per Meter Including Duct And Laying And Boring With Duties And Taxes, Freight Etc., Cost Of Supply And Installation Of Aei / Rfid Reader With Associated Cabling, Hardware And Software Interfacing With The Omrs System., Total Cost Of Consumables. Detailed Break Up Of Items With Cost Per Unit To Be Attached With The Financial Bid.