| 1 | Laying of RCC Road | Tech specn | 625.00 | Cum | 4071.00 | 2544375.00 |
| Laying of RCC of M25 grade design mix concrete corresponding to IS 456 using concrete mixer with 50% of 20mm and 50% of 12mm size hard broken machine crushed granite metal from approved quarry for coarse aggregate using 50% of sand and 50% of Crusher dust from approved quarry for fine aggregate with minimum cement content of 380Kgs per cum including cost and conveyance of all materials (except cost of cement) like fine aggregate, coarse aggregate to site, seigniorage charges, all operational, incidental and labour charges, machine mixing, side shuttering, laying concrete, vibrating, supply and fixing of 12mm wide compressible filler board with polysulphide sealant in expansion joints, curing etc., complete for finished item of work as directed by the Engineer-in-charge at site. (Cement will be issued by TSGENCO free of cost at KTPP departmental stores) |
| 2 | Laying of RCC Road | Tech specn | 37.50 | MT | 14474.00 | 542775.00 |
| Providing high yield strength deformed (HYSD)/ Thermo Mechanically Treated (TMT)/ Mild Steel for reinforcement (Fe 415 grade as per IS 1786 -1979) of different diameters for RCC works including conveyance charges of steel (excluding cost of steel), labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying, lap splicing with binding wire of 18SWG, forming grills for reinforcement work as per approved designs and drawings, including conveyance of steel to site, all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover block, all incidental, operational charges etc., complete for finished item work as per standard specifications and as directed by the Engineer-in-charge. (Reinforcement steel will be issued by TSGENCO free of cost at KTPP departmental stores) |
| 3 | Laying of RCC Road | Tech specn | 93.75 | Cum | 3634.00 | 340687.50 |
| Laying P.C.C (1:3:6) for shoulders corresponding to IS 456 using MIXER with 50% 20mm and 50% 12mm size hard broken machine crushed hard granite metal from approved quarry for coarse aggregate and with 50% of sand and 50% of crusher dust from approved quarry for fine aggregate with cement content of 220 Kgs including cost and conveyance of all materials (except cement) like fine aggregate, coarse aggregate to site, seigniorage charges, all operational, incidental and labour charges, vibrating, curing etc., complete for finished item of work as per standard specifications and as directed by the Engineer-in-charge at site. (Cement will be issued by TSGENCO free of cost at KTPP departmental stores) |
| 4 | Laying of RCC Road | Tech specn | 250.00 | Cum | 3195.00 | 798750.00 |
| Laying P.C.C (1:4:8) for levelling course corresponding to IS 456 using MIXER with 40mm size hard broken machine crushed hard granite metal from approved quarry for coarse aggregate and with 50% of sand and 50% of crusher dust from approved quarry for fine aggregate with cement content of 162 Kgs including cost and conveyance of all materials (except cost of cement) like fine aggregate, coarse aggregate to site, seigniorage charges, all operational, incidental and labour charges, ramming, curing etc., complete for finished item of work as per standard specifications and as directed by the Engineer-in-charge at site. (Cement will be issued by TSGENCO free of cost at KTPP departmental stores) |
| 5 | Laying of RCC Road | MORT&H & Tech specn | 125.00 | Cum | 160.00 | 20000.00 |
| Compaction of existing sub grade with smooth wheel roller of 80 to 100kN weight to achieve the desired density wherever required, including hire, crew charges of machinery, all operational, incidental and labour charges etc., complete for finished item of work as directed by the Engineer-in-charge |
| 6 | Laying of RCC Road | Technical Specification | 937.50 | Cum | 114.00 | 106875.00 |
| Earthwork excavation for road way in soil by mechanical means including cutting and loading in tippers and transporting of serviceable or disposal of unserviceable soil with all leads and lifts, including hire, crew charges of machinery, all operational, incidental and labour charges etc., complete for finished item of work as directed by the Engineer-in-charge. |