| 1 | 1 | NAME OF WORK :IMPROVEMENTS OF SETHURAYANKULAM TANK @ UCHAPATTY PANCHAYAT THIRUMANGALAM PANCHAYAT UNION IN MADURAI DISTRICT | | | |
|---|
| 2 | 2 | MI TANK EARTH WORK | | | |
|---|
| 3 | 3 | Clearing the juliflora jungle without uprooting | | 47094 | M2 |
|---|
| 4 | 4 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete. (including Watering & Consolidation) | | 3906.52 | CUM |
|---|
| 5 | 5 | SLUICE CIVIL WORK | | | |
|---|
| 6 | 6 | Dismantling Clearing Away and carefully Stacking materials userful for reuse for any thickness of walls brick or stone masonry in cement Morter walls under 3 M height etc comlete complying with standard specifications | | 1.82 | CUM |
|---|
| 7 | 7 | HGS SS.20 B earth work Excavation and Deposting on bank with Intial lead of 10 M $ Initial lift of 2 m in hard Stiff clay ,Stiff black cotton , hard red earth , shales, murram , gravel , stoney earth and earth mixed with Small size boulders SS 20 B | | 313.28 | CUM |
|---|
| 8 | 8 | Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied by dept shoringshutteringbalingout water etc., complete | | 15.91 | CUM |
|---|
| 9 | 9 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., | | 136.11 | SQM |
|---|
| 10 | 10 | Cement concrete 1:2:4 mix usin 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | | 50.08 | CUM |
|---|
| 11 | 11 | Cement concrete 1:1.5:3 mix usin 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | | 1.7 | CUM |
|---|
| 12 | 12 | Supplying and Fixing of cut stone set in cement morter 1:3 (one cement three sand) using roughly dressed new cut stone etc complete complying with standard specification | | 0.63 | CUM |
|---|
| 13 | 13 | Refilling with excavated earth other than sand with an initial head load of 100 mts and depositing the | | 262.82 | CUM |
|---|
| 14 | 14 | Reinforced Cement concrete in C M 1:1.5:3 mix using 20mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied by dept shoringshutteringbalingout water etc., complete | | 4.36 | CUM |
|---|
| 15 | 15 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. | | 4.29 | QTL |
|---|
| 16 | 16 | Providing and fixing best countrywood plug with 50 mm dia MS screw gearing rod 4 m height support on 2 Nos.ISMB 125 RJ Joists of 1.5 m length and guide beam 1 no of the same size resting in turn of MS base plate of 50mmx30mm size 6 mm thick with cast iron hexagonal head set and a collar plate of 300mmx 300mmx6mm thick fixed with necessary bolts and nuts and other fixtures etc.complete. | | 1 | NOS |
|---|
| 17 | 17 | NAME OF WORK: Improvements to Pudhumalaikundu kanmai in Vidathakulam Village & Vidhathakulam Panchayat of Thirumangalam Panchayat Unon | | | |
|---|
| 18 | 18 | Clearing the light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the stregthening of the bund and the ground shall be left in a perfectly clean conditon etc. complete. | | 1500 | Sqm |
|---|
| 19 | 19 | Earth work excavation in all soils except hard rock for the formation of bund with lead of 0-100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc.complete. | | 11525 | Cum |
|---|
| 20 | 20 | Constrcution of Sluice | | | |
|---|
| 21 | 21 | Dismantling, Clearing away and carefully Stacking materials useful for reuse for any thickness of walls brick or stone masonry in cement Mortar walls under 3 M height etc complete complying with Standard Specifications | | 1.82 | Cum |
|---|
| 22 | 22 | HGS SS.20.B. Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20B | | 317.1 | Cum |
|---|
| 23 | 23 | Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied by dept shoringshutteringbalingout water etc., complete | | 23.87 | Cum |
|---|
| 24 | 24 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened | | 136.11 | Sqm |
|---|
| 25 | 25 | Cement concrete in C M 1:2:4 mix using 20mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied by dept shoringshutteringbalingout water etc., complete | | 50.08 | Cum |
|---|
| 26 | 26 | Cement concrete in C M 1:1.5:3 mix using 20mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied by dept shoringshutteringbalingout water etc., complete | | 1.7 | Cum |
|---|
| 27 | 27 | Supplying and fixing of cut stone set in cement mortar 1:3 (One cement, three sand) using roughly dressed new cut stone etc complete complying with standard specification | | 0.63 | Sqm |
|---|
| 28 | 28 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with | | 262.82 | Cum |
|---|
| 29 | 29 | Reinforced Cement concrete in C M 1:1.5:3 mix using 20mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied by dept shoringshutteringbalingout water etc., complete | | 4.36 | Cum |
|---|
| 30 | 30 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to | | 4.29 | MT |
|---|
| 31 | 31 | Providing and fixing best countrywood plug with 50 mm dia MS screw gearing rod 4 m height support on 2 Nos.ISMB 125 RJ Joists of 1.5 m length and guide beam 1 no of the same size resting in turn of MS base plate of 50mmx30mm size 6 mm thick with cast iron hexagonal head set and a collar plate of 300mmx 300mmx6mm thick fixed with necessary bolts and nuts and other fixtures etc.complete. | | 1 | Nos |
|---|
| 32 | 32 | Construction of Weir | | | |
|---|
| 33 | 33 | Earthwork excavation and depositing on bank with an initial lead and lift in all classes of soils and sub soils except in hard rock including all labour charges etc . Complete. | | 50.56 | Cum |
|---|
| 34 | 34 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc complete | | 24.87 | Cum |
|---|
| 35 | 35 | Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc complete | | 61.6 | Cum |
|---|
| 36 | 36 | Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc complete | | 3.15 | Cum |
|---|
| 37 | 37 | Supplying and erecting shuttering including necessary support for plane surface in foundation Basement and Roof labs strutting upto 3.29M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations | | 112.81 | Sqm |
|---|
| 38 | 38 | Provision for Boundary Stone | | 5 | Nos |
|---|
| 39 | 39 | Provision for DPR Preparation Charges | | 1 | Nos |
|---|
| 40 | 40 | Provision for Name board | | 1 | No |
|---|
| 41 | 41 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}\n | BI01010001010000000000000515BI01000011120 | 1 | GST Amount (in Rupees) |
|---|