Out Sourcing For Manning And Operation Of 11 Kv Main Receiving Station ( Mrs ) At Irde And Deal Under Ge ( I ) Rnd Dehradun , Maintenance & Operation Of Electrical Supply & Distribution System Of Mrs 11 Kv Sub Sation Of Irde In Three Shifts , Each Shift Of 08 Hours Including Sundays And Holidays , Shift Commencing From 0600 Hrs To 1400 Hrs , From 1400 To 2200 Hrs & 2200 Hrs To 0600 Hrs Per Day ( I . E . Three Shifts In A Day ) By Employing One Iti/5 Year Experience Qualified Electrician ( Semi Skilled ) In Each Shift For Entire System Comprising Of 11 Kv Ht Vcb 400/630 Amps - 09 Nos , Transfomer 11/0 . 433Kva , 630 Kva -01 Nos , God Of Cap - 12 No , Capacitor Banks And Their Connected Lt Panel Boards , Change Over Switchs & Voltage Stabilizers Etc . Installed Inside And Out Side Of Mrs 11Kva Sub Stn Of Irde Including Repair/Rectification Of Fault Developed In And Around Electric System And Equipment Installed At Mrs Yard And Upkeep The Electric Installation Operational & In Working Conditions , Maintain Day To Day Record Of Activitieson Log Sheet Etc . Complete All As Specified And Directed By Engr-In-Charge . ( Incl Notes Mentioned In Srl No 2 . 01 To 2 . 03 Here In After ) , Maintenance & Operation Of Electrical Supply & Distribution System Of Mrs 11 Kv Sub Sation Of Deal In Three Shifts , Each Shift Of 08 Hours Including Sundays And Holidays , Shift Commencing From 0600 Hrs To 1400 Hrs , From 1400 To 2200 Hrs & 2200 Hrs To 0600 Hrs Per Day ( I . E . Three Shifts In A Day ) By Employing One Iti/ 05 Years Experience Qualified Electrician ( Semi Skilled ) In Each Shift For Entire System Comprising Of 11 Kv Ht Vcb400/630 Amps - 09 Nos , Transfomer 11/0 . 433Kv , 630 Kva -01 Nos , 400 Kva -01 Nos & 400 Kva -01 Nos , God Of Cap - 12 No , Capacitor Banks And Their Connected Lt Panel Boards , Change Over Switchs & Voltage Stabilizers Etc . Installed Inside And Out Side Of Mrs 11Kva Sub Stn And Dg Set Of Capacity 1X125 Kva And 1X 250 Kva Installed At 11Kv Mrs Area Of Deal Including Repair/Rectification Of Fault Developed In And Around Electric System And Equipment Installed At Mrs And Upkeep The Electric Installation Operational & In Working Conditions , Maintain Day To Day Record Of Activities On Log Sheet Etc . Complete All As Specified And Directed By Engr-In-Charge . ( Including Notes Mentioned In Srl No 2 . 01 To 2 . 03 Here In After ) , Note For Item No . 01 & 02:- ( I ) Carefully Monitoring And Operation Of 11 Kv Take Over Point At Irde /Deal And Also Carefully Monitoring And Operation Of All The Gods In The 11 Kv Mrs Yard . ( Ii ) Carefully Monitoring And Operation Of Outdoor/Indoor Control Panel And All 11 Kv Vcbs , And Ht/Lt Panels , Change Over Switch , Incoming Acb/Mccb To Connected Load In The Above Area . ( Iii ) Monitoring Of Battery Charging Bank For Dc Supply To Numbers Of Relay And Motors Of Vcb To Ensure Tripping . ( Iv ) Carefully Monitoring And Operation Of Capacitor Bank And To Ensure That Power Factor Shall Not Be Less Than 0 . 97 ( V ) To Monitor Distribution Transformer Installed In Mrs . ( Vi ) To Switch On/Off The Security Lights At Mrs Yard And Their Complex As Per Time Schedule Fixed By Engineer-In-Charge . , Notes For Item No . 01 & 02 Contd :- ( I ) In Case Of Any Major Fault In The Equipments Which Is Beyond The Control Of The Operator , He Will Immediately Intimate The Same To The Engineer-In-Charge/Je ( Ii ) The Operator Shall Monitor And Maintain Records Of Load/Power Factor Etc . ( Iii ) The Operator Shall Attend All The Complaints Telephonically And Maintain Records In Detail And Submit Complete Details To Engineer-In-Charge/Jes For Resolution , Urgent Complaints If Any Will Immediately Be Intimated To Engineer-In-Charge/Jes ( Iv ) The Operator Shall Carefully Monitor And Operate All Ht/Lt Panels , Change Over Switch , Godos Incoming/Outgoing Acb/Mccb To Connected Load In The Above Area . ( V ) The Stationary Required For Maintenance Of Records Shall Be Made Available By The Contractor . ( Vi ) Trimming Of Tree Branches At Regular Intervals To Maintain Minimum Clearance Of 2 Metere On Both Sides Of 11 Kv Oh Line In Mrs Yard Including Maintain Area In & Around The Installation Neat & Clean Including Repair/ Rectification Of Do Fuses/Jumpers/Acsr Conductor With In On Km Radius Area Of Mrs . . , Note For Item No . 01 & 02 Contd :- ( I ) . The Rate Quoted Is Deemed To Be Inclusive Of The Cost Of Log Book And Shut Down Register And Cost Of T &P For Maint Work , And Minor Consumables Such As Do Fuses , Acsr Conductor Jumper , Pvc Insulation Tape , Screws , Washers , Nails , Teflon Tape , Fuse Wire , Clips Etc For Day To Day Maintenance And Repairs . ( Ii ) . The Rate Quoted Is Deemed To Be Inclusive Of Providing Mobile Communication System For Each Shift I . E . One With Onduty Electrician So That The Complaints Can Be Lodged And Feed Back Can Be Obtained . ( Iii ) . The Contractor Has To Supply Uniform To Their Employees For Wearing During The Working Hours . The Unit Rate Is Deemed To Include For The Uniform . The Pattern Of The Uniform Shall Be As Decided By The Engineer-In-Charge . ( Iv ) . The Rate Is Deemed To Be Inclusive To Maintain In & Arround The Installation Neat , Clean & Trimming Of Tree . ( V ) . The Rate Is Deemed To Be Inclusive To Maintenace Of Records Such As Ht/Lt Shut Down/ Break Down Record Etc As Directed . ( Vi ) . The Fuel For Running Of Dg Set Will Be Issued By The Dept & The Rate Quoted Is Deemed To Be Inclusive For Collection Of Fuel From Pol Store Yard . , General Notes For Contract :- ( I ) Contractor Will Make The Payment Of Operators Through Bank Account Only Through Ecs/Neft/Cheque . Bank Statement In Respect Of Payment Made To All Employed Labour Will Be Submitted Before Claiming Rar Payment . ( Ii ) A Certificate , As Per Given In Ps Clause , For Paying The Epf To All Employeed Labours Be Submitted By Contractor Before Claiming Rar Payment . ( Iii ) Group Insurance Of Employed Labours/ Operators Will Be Done By Contractor And A Copy The Same Be Submitted In The Office As Per Labour Regulation Act . ( Iv ) Since Total No Of Of Operators/ Labours Employed