| 1 | 1 | PART-A. Construction of 17 Nos. RCC Isolation Stopping - Grroove cutting / floor cutting for stopping / Manhole by chisel & Hammer. (Item No. 2.c of GMSOR 2019). - For Mixed coal and shale | 1 | 40.8 | m3 |
|---|
| 2 | 2 | Grroove cutting / floor cutting for stopping / Manhole by chisel & Hammer. (Item No. 2.b of GMSOR 2019). - For Soft Stone. | 2 | 15.35 | m3 |
|---|
| 3 | 3 | Laying cement concrete in foundation and plinth (P.C.C.) 1:2:4 including vibrating, tamping, curing etc. and loading, unloading the materials in to mine car / tub and carriage of materials by manual labour for a lead of 50 mtrs both at surface and underground.(Item Sl.No. 4 of GMSOR 2016). (Updated rate including materials). | 3 | 2.56 | m3 |
|---|
| 4 | 4 | Reinforcement cement concrete work 1:2:4 ( 1 cement : 2 sand : 4 stone aggregate 20mm and down gauge) upto plinth level i/c vibrating tamping curing etc. and loading, unloading the materials in to mine car/tub and carriage of material by manual labour for a lead of 50 mtr. Both at surface and underground but excluding cost of reinforcement. (Item No. 5 of GMSOR 2016). \n | 4 | 46.56 | m3 |
|---|
| 5 | 5 | Reinforcement cement concrete work 1:2:4 ( 1 cement : 2 sand : 4 stone aggregate 20mm and down gauge) in walls, column, buttress i/c vibrating tamping, curing etc. and loading, unloading the materials in to mine car/tub and carriage of material by manual labour for a lead of 50 mtr. Both at surface and underground but excluding cost of reinforcement. (Item No. 6 of GMSOR 2016). \n | 5 | 132.53 | m3 |
|---|
| 6 | 6 | M.S. Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding etc. complete and loading, unloading the materials in to mine car/tub and carriage of material by manual labour for a lead of 50 mtr. Both at surface and underground. (Item No. 8 of GMSOR 2016). | 6 | 7521.78 | kg |
|---|
| 7 | 7 | Providing centering & shuttering with props and removal of the same all complete including loading ,unloading the materials in to mine car /tub and carriage of materials by manual labour for a lead of 50mtrs both at surface and underground. - For Foundation and plinth. (Item No. 13. a of GMSOR 2016) | 7 | 116.8 | m2 |
|---|
| 8 | 8 | Providing centering & shuttering with props and removal of the same all complete including loading ,unloading the materials in to mine car /tub and carriage of materials by manual labour for a lead of 50mtrs both at surface and underground. - For Wall (Item No. 13.b of GMSOR 2016) | 8 | 374.98 | m2 |
|---|
| 9 | 9 | 12mm thick cement plaster with cement mortar 1:6 (1 cement : 6 sand) including loading ,unloading the materials in to mine car /tub and carriage of materials by manual labour for a lead of 50mtrs both at surface and underground. (Item No. 16 of GMSOR 2016) | 9 | 1016.74 | m2 |
|---|
| 10 | 10 | Extra for tub pushing for every 50 Mtr in underground where Haulage is not provided (6 leads) - Chips (Item No. 25. b of GMSOR 2016). | 10 | 159.85 | m3 |
|---|
| 11 | 11 | Extra for tub pushing for every 50 Mtr in underground where Haulage is not provided (6 leads). Sand (Item No. 25. b of GMSOR 2016). | 11 | 101.08 | m3 |
|---|
| 12 | 12 | Extra for tub pushing for every 50 Mtr in underground where Haulage is not provided (6 leads) Cement (Item No. 25. e of GMSOR 2016). | 12 | 62.57 | MT |
|---|
| 13 | 13 | Extra for tub pushing for every 50 Mtr in underground where Haulage is not provided (6 leads) Steel (Item No. 25.f of GMSOR 2016). | 13 | 7.52 | Te. |
|---|
| 14 | 14 | Malma Cleaning/removal of debris from galleries & cleaning of belt roadway and stacking/loading within 50 m. (Item Sl.No. 1 of GMSOR 2019). | 14 | 172.89 | m3 |
|---|
| 15 | 15 | PART-B. Construction of 03 Nos. Bricks Preparatory RCC Isolation Stopping - Grroove cutting / floor cutting for stopping / Manhole by chisel & Hammer. (Item No. 2.c of GMSOR 2019). - For Mixed coal and shale | 15 | 19.08 | m3 |
|---|
| 16 | 16 | Grroove cutting / floor cutting for stopping / Manhole by chisel & Hammer. (Item No. 2.b of GMSOR 2019). - For Soft Stone. | 16 | 5.83 | m3 |
|---|
| 17 | 17 | Brick work using bricks of class designation 35 in foundation and plinth with cement mortar 1:6 (1 Cement : 6 fine sand ) including loading unloading the material in to mine car / tub and carriage of materials by manual for a lead of 50m both at surface and underground. (Item Sl. No. 9 of GMSOR 2016). | 17 | 6.77 | m3 |
|---|
| 18 | 18 | Brick work using bricks of class designation 35 in super with cement mortar 1:6 (1 Cement : 6 fine sand ) including loading unloading the material in to mine car / tub and caring of materials by manual labour for a lead of 50m both at surface and underground. (Item Sl. No. 10 of GMSOR 2016). | 18 | 19.12 | m3 |
|---|
| 19 | 19 | 12mm thick cement plaster with cement mortar 1:6 (1 cement : 6 sand) including loading ,unloading the materials in to mine car /tub and carriage of materials by manual labour for a lead of 50mtrs both at surface and underground. (Item No. 16 of GMSOR 2016) | 19 | 53.08 | m2 |
|---|
| 20 | 20 | Extra for tub pushing for every 50 Mtr in underground where Haulage is not provided (6 leads). Sand (Item No. 25. b of GMSOR 2016). | 20 | 7.03 | m3 |
|---|
| 21 | 21 | Extra for tub pushing for every 50 Mtr in underground where Haulage is not provided (6 leads) Bricks (Item No. 25. c of GMSOR 2016). | 21 | 12945 | nos. |
|---|
| 22 | 22 | Extra for tub pushing for every 50 Mtr in underground where Haulage is not provided (6 leads) Cement (Item No. 25. e of GMSOR 2016). | 22 | 1.68 | MT |
|---|
| 23 | 23 | Malma Cleaning/removal of debris from galleries & cleaning of belt roadway and stacking/loading within 50 m. (Item Sl.No. 1 of GMSOR 2019). | 23 | 30.24 | m3 |
|---|
| 24 | 24 | Total impact of GST for the purpose of CTC | 24 | 1 | Nos |
|---|