Manning And Operation Of E/M Installations At 13 Brd , 16 Brd , 27 Ed And 31 Mcu At Af Stn Palam Under Ge ( P ) Af Gurgaon

Tender Notice

25105734
Manning And Operation Of E/M Installations At 13 Brd , 16 Brd , 27 Ed And 31 Mcu At Af Stn Palam Under Ge ( P ) Af Gurgaon
Indian
Haryana
17-08-2020
24-08-2020
26-08-2020

Tender Details

Manning And Operation Of E/M Installations At 13 Brd , 16 Brd , 27 Ed And 31 Mcu At Af Stn Palam Under Ge ( P ) Af Gurgaon , Manning & Operation And Routine Maintenance Of Equipment Of 11 Kv Main Receiving Station And Radar Sub Station At Tech Area And Madhurmilon Sub Station 13 Brd Af Palam Equipped With Various Equipments And Controlling Switches Gear As Listed Below Through Out The Day ( 03 Shifts ) With Minimum One Electrician ( Skilled ) And One Helper ( Unskilled ) In Each Shift Of 08 Hrs Including Sunday And Holiday . Necessary Cleaning , Grass Cutting & Maintenance Of Complete Sub Station , Equipments Including Surrounding Area Upto 10 Mtrs Of Out Side Boundary Wall And Attending , Detecting Of Any Faults With In The 11 Kv Main Receiving Station And Radar Sub Station And Rectifying The Same On Emergency Basis As And When Required Including Repairs To All Internal And External Lightings Of Bldgs Including Supply And Replacement Of Fuses , Unserviceable Nuts , Bolts , Washer Etc And Toping Of Distilled Water And Electrolyte For Batteries , Maintaining Daily Log Sheet And Other Connected Documents Such Earth Test Register Periodical Maintenance Register Etc Of Installations , Complete All As Specified And Directed By Engr-In- Charge For The Following Equipment And Control Panels :- ( A ) Step Down Transformer 11/433 Kv 1500 Kva - 01 No ( B ) Vcb 11 Kv With Bus Coupler - 12 Nos ( C ) Lt Panel For Transformer - 03 Nos ( D ) Battery Bank - 01 Set ( E ) Internal Electric Fitting And Fixture ( F ) External Street Lights Of Bldg ( G ) Earthing System ( H ) Servo Voltage Stablizer - 04 Nos ( J ) Power Factor Panel - 01 No ( K ) Step Down Transformer 11/433 Kv 500 Kva -01 No ( L ) Step Down Transformer 11/433 Kv 200 Kva -01 No , 1St Shift From 0600 Hrs To 1400 Hrs , 2Nd Shift From 1400 Hrs To 2200 Hrs , 3Rd Shift From 2200 Hrs To 0600 Hrs , Manning & Operation And Routine Maintenance Of Equipment Of 11 Kv Sub Station 13 Brd Domestic Area , Offrs Qtrs , Officers Enclave And 16 Brd Sub Station Af Palam Equipped With Various Equipments And Controlling Switches Gear As Listed Below Through Out The Day ( 03 Shifts ) With Minimum One Electrician ( Skilled ) & One Helper ( Unskilled ) In Each Shift Of 08 Hrs Including Sunday And Holiday . Necessary Cleaning , Grass Cutting & Maintenance Of Complete Sub Station , Equipments Including Surrounding Area Upto 10 Mtrs Of Out Side Boundary Wall And Attending , Detecting Of Any Faults Within The 11 Kv Sub Station And Rectifying The Same On Emergency Basis As And When Required Including Repairs To All Internal And External Lightings Of Bldgs Including Supply And Replacement Of Fuses , Unserviceable Nuts , Bolts , Washer Etc , Toping Of Distilled Water , Electrolyte For Batteries , Maintaining Daily Log Sheet And Other Connected Documents Such Earth Test Register Periodical Maintenance Register Etc Of Installations Complete All As Specified And Directed By Engr-In- Charge For The Following Equipment And Control Panels :- ( A ) Step Down Transformer 11/433 Kv 630 Kva -02 Nos ( B ) Step Down Transformer 11/433 Kv 400 Kva - 02 Nos ( C ) Vcb 11 Kv With Bus Coupler - 17 Nos ( D ) Battery Bank - 02 Set ( E ) Internal Electric Fitting And Fixture ( F ) External Street Lights Of Bldg ( G ) Earthing System ( H ) Servo Voltage Stablizer - 01 No ( J ) Power Factor Panel - 01 No ( K ) Step Down Transformer 11/433 Kv200 Kva -01 No ( L ) Step Down Transformer 11/433 Kv150 Kva -01 No ( M ) Lt Panel For Transformer - 06 Nos , 1St Shift From 0600 Hrs To 1400 Hrs , 2Nd Shift From 1400 Hrs To 2200 Hrs , 3Rd Shift From 2200 Hrs To 0600 Hrs , Note For Items 1 To 2 Above:- ( 1 ) Manning Of Vcbs Maintaining The Records Of Incoming And Outgoing Parameters In An Interval Of 15 Mins , Physical Checking Of The Joints And Cables Of Ht As Well As Lt Panel And Doing Minor Repair After Taking Approval Of Je . Minor Repair Includes Tightening/Loosening Of Nuts And Bolts , Crimping Of Lugs Of All Sizes , Making/ Jointing Connections Of Cables Inside The Power House Complex , Keeping The Power House Clean And Tidy With Regular Cleaning Of Washrooms Etc . ( 2 ) Manning And Operation Of Dg Sets Including The Following: ( 3 ) Open The Non Reversing Ratchet Of Vertical Hollow Shaft Motor And Clean The Balls/Rollers For Proper Cleaning . ( 4 ) Apply Mineral Jelly/Vaseline To The Battery Terminals . ( 5 ) Keeping The Installation , Equipment Neat And Clean . ( 6 ) Clean The Oil Batch Air Cleaner Of Diesel Engine & Fill With Fresh Engine Oil . ( 7 ) Oiling /Greasing ( Lubricating ) The Mobile Parts And Maintaining The Desired Conditions Of Operations Tightening Of Nut Bolt Etc , ( 8 ) Check Batteries For Charge And Recharge , If Necessary . ( 9 ) Top Up Of Diesel Oil In Fuel Tanks Of Dg Sets . ( 10 ) Maintenance Of Earthing Of Installation , Including Testing Of Earthing . ( 11 ) Tighten The Foundation Bolts Of Installed Equipment . ( 12 ) Clean Lubricant Oil Filter Of Diesel Engine . ( 13 ) Lubricate Water Circulating Pump Of Diesel Engine . ( 14 ) Drain Fuel Tank And Remove Sediments . ( 15 ) Drain Fuel Filter Bowls And Remove Sediments/Water . ( 16 ) Check Cable Connection Of Dynamo , Starter And Battery . ( 17 ) Check The Dynamo Belt Tension & Adjust . ( 18 ) Check Oil Level In Fuel Injection Pump , Drain Surplus Oil/Fuel Mixture Or Topping If Necessary . ( 19 ) Drain Radiator Water , Clean With Fresh Water Adding Descaling Compound And Refill With Fresh Water . ( 20 ) Check & Tighten Fuel Connections , Oil Pump Bolts , Engine & Radiator Mounting Bolts , Radiator Loose Connections Etc . ( 21 ) Replace Pre -Filter Insert Of Fuel Filter , Manning & Operation And Routine Maintenance Of Main Booster Pump House With Dg Set And Ro Plant At 13 Brd Domestic Area By Providing Of Minimum 01 Pump Operator ( Skilled ) And 01 Helper ( Unskilled ) In Each Shift Of 08 Hrs Round The Clock In 03 Shift ( 1St Shift From 0600 Hrs To 1400 Hrs , 2Nd Shift 1400 Hrs To 2200 Hrs & 3Rd Shift 2200 Hrs To 0600 Including Sunday & Holidays ) And Repair To Normal Defects As And When Required And Maintaining Log Sheet For Running Of Pumps And Duty Personnel Shall Be Responsible For Complete Fill Up Of The Over Head Reservoir & Sump During Duty Hours Including Cleaning The Pump House/Ro Plant , And Cutting Of Grasses Surrounding 10 Mtrs Areas , Complete All As Specified And Directed By Engr-In- Charge . , 1St Shift From 0600 Hrs To 1400 Hrs , 2Nd Shift From 1400 Hrs To 2200 Hrs , 3Rd Shift From 2200 Hrs To 0600 Hrs , Manning & Operation And Routine Maintenance Of Pump House Map Offrs Quarters By Providing Of Minimum One Pump Operator ( Skilled ) In Each Shift Of 08 Hrs In 02 Shift ( 1St Shift From 0600 Hrs To 1400 Hrs & 2Nd Shift From 1400 Hrs To 2200 Hrs ) Including Sunday & Holidays And Repair To Normal Defects As And When Required And Maintaining Log Sheet For Running Of Pumps And Duty Personnel Shall Be Responsible For Complete Fill Up Of The Over Head Reservoir & Sump During Duty Hours Including Cleaning The Pump House/Ro Plant And Cutting Of Grasses Surrounding 10 Mtrs Areas , Complete All As Specified And Directed By Engr-In- Charge . , 1St Shift From 0600 Hrs To 1400 Hrs , 2Nd Shift From 1400 Hrs To 2200 Hrs , Note For Items 4 . 00 & 5 . 00 Above:-

Corrigendum Details

Sr No CorrigendumDate Description Submission Date
1 14-08-2020 Corrigendum1 17-08-2020
2 17-08-2020 Bid Auto Extn Corrigendum 24-08-2020

Key Value

Document Fees
INR 1000 /-
EMD
INR 186000.00 /-
Tender Value
INR 1.11 Crore /-

BOQ Items

Name of Work : MANNING AND OPERATION OF E/M INSTALLATIONS AT 13 BRD, 16 BRD, 27 ED AND 31 MCU AT AF STN PALAM UNDER GE(P) AF GURGAON
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Manning & operation and routine maintenance of equipment of 11 KV main receiving station and Radar sub station at tech area and madhurmilon sub station 13 BRD AF palam equipped with various equipments and controlling switches gear as listed below through out the day (03 shifts) with minimum one electrician (Skilled) and one helper (Unskilled) in each shift of 08 hrs including Sunday and Holiday. Necessary cleaning, grass cutting & maintenance of complete sub station, equipments including surrounding area upto 10 mtrs of out side boundary wall and attending, detecting of any faults with in the 11 KV Main receiving station and Radar sub station and rectifying the same on emergency basis as and when required including repairs to all internal and external lightings of bldgs including supply and replacement of fuses, unserviceable nuts, bolts, washer etc and toping of distilled water and electrolyte for batteries, maintaining daily log sheet and other connected documents such earth test register periodical maintenance register etc of installations, complete all as specified and directed by Engr-in- charge for the following Equipment and Control Panels :- \n(a) Step down transformer 11/433 KV 1500 KVA - 01 No\n(b) VCB 11 KV with bus coupler - 12 Nos\n(c) LT panel for transformer - 03 Nos\n(d) Battery bank - 01 Set\n(e) Internal electric fitting and fixture \n(f) External street lights of Bldg\n(g) Earthing system \n(h) Servo Voltage Stablizer - 04 Nos\n(j) Power Factor Panel - 01 No\n(k) Step down transformer 11/433 KV 500 KVA -01 No\n(l) Step down transformer 11/433 KV 200 KVA -01 No
2 1.01 1st shift from 0600 hrs to 1400 hrs 333 Each\nShift
3 1.02 2nd shift from 1400 hrs to 2200 hrs 333 Each\nShift
4 1.03 3rd shift from 2200 hrs to 0600 hrs 333 Each\nShift
5 2 Manning & operation and routine maintenance of equipment of 11 KV sub station 13 BRD domestic area, Offrs Qtrs, Officers Enclave and 16 BRD sub station AF palam equipped with various equipments and controlling switches gear as listed below through out the day (03 shifts) with minimum one electrician (Skilled) & one Helper (Unskilled) in each shift of 08 hrs including Sunday and Holiday. Necessary cleaning, grass cutting & Maintenance of complete sub station, equipments including surrounding area upto 10 mtrs of out side boundary wall and attending, detecting of any faults within the 11 KV sub Station and rectifying the same on emergency basis as and when required including repairs to all internal and external lightings of bldgs including supply and replacement of fuses, unserviceable nuts, bolts, washer etc, toping of distilled water , electrolyte for batteries, maintaining daily log sheet and other connected documents such earth test register periodical maintenance register etc of installations complete all as specified and directed by Engr-in- charge for the following Equipment and Control Panels :- \n(a) Step down transformer 11/433 KV 630 KVA -02 Nos \n(b) Step down transformer 11/433 KV 400 KVA - 02 Nos\n(c) VCB 11 KV with bus coupler - 17 Nos\n(d) Battery bank - 02 Set\n(e) Internal electric fitting and fixture \n(f) External street lights of Bldg\n(g) Earthing system \n(h) Servo Voltage Stablizer - 01 No\n(j) Power Factor Panel - 01 No\n(k) Step down transformer 11/433 KV200 KVA -01 No\n(l) Step down transformer 11/433 KV150 KVA -01 No\n(m) LT panel for transformer - 06 Nos
6 2.01 1st shift from 0600 hrs to 1400 hrs 333 Each Shift
7 2.02 2nd shift from 1400 hrs to 2200 hrs 333 Each Shift
8 2.03 3rd shift from 2200 hrs to 0600 hrs 333 Each Shift
9 3 Note for Items 1 to 2 above:- (1) Manning of VCBs maintaining the records of incoming and outgoing parameters in an interval of 15 mins, physical checking of the joints and cables of HT as well as LT panel and doing minor repair after taking approval of JE. Minor repair includes tightening/loosening of nuts and bolts, crimping of lugs of all sizes, making/ jointing connections of cables inside the power house complex, keeping the Power House clean and tidy with regular cleaning of washrooms etc.\n (2) Manning and Operation of DG Sets including the following:\n(3) Open the non reversing ratchet of vertical hollow shaft motor and clean the balls/rollers for proper cleaning. \n(4) Apply mineral Jelly/Vaseline to the battery terminals. \n(5)Keeping the installation, equipment neat and clean. \n(6) Clean the oil batch air cleaner of diesel engine & fill with fresh engine oil. \n(7) Oiling /greasing (Lubricating) the mobile parts and maintaining the desired conditions of operations tightening of nut bolt etc,\n(8) Check batteries for charge and recharge, if necessary. \n(9) Top up of Diesel oil in fuel tanks of DG Sets.\n(10) maintenance of earthing of installation, including testing of earthing.\n(11) Tighten the foundation bolts of installed equipment. \n(12) Clean lubricant oil filter of diesel engine. \n(13) Lubricate water circulating pump of diesel engine. \n(14) Drain fuel tank and remove sediments. \n(15) Drain fuel filter bowls and remove sediments/water. \n(16) Check cable connection of Dynamo, Starter and Battery. \n(17) Check the dynamo belt tension & adjust. \n(18) Check oil level in fuel injection pump, drain surplus oil/fuel mixture or topping if necessary. \n(19) Drain radiator water, clean with fresh water adding descaling compound and refill with fresh water. \n(20) Check & tighten fuel connections, oil pump bolts, engine & radiator mounting bolts, radiator loose connections etc. \n(21) Replace pre -filter insert of fuel filter\n
10 4 Manning & Operation and routine maintenance of Main Booster Pump House with DG set and RO Plant at 13 BRD domestic area by providing of minimum 01 Pump Operator (Skilled) and 01 helper (Unskilled) in each shift of 08 hrs round the clock in 03 shift (1st shift from 0600 hrs to 1400 hrs, 2nd shift 1400 hrs to 2200 hrs & 3rd shift 2200 hrs to 0600 including Sunday & Holidays) and repair to normal defects as and when required and maintaining log sheet for running of pumps and duty personnel shall be responsible for complete fill up of the over head reservoir & sump during duty hours including cleaning the Pump House/RO Plant, and cutting of grasses surrounding 10 mtrs areas, complete all as specified and directed by Engr-in- charge.
11 4.01 1st shift from 0600 hrs to 1400 hrs 333 Each Shift
12 4.02 2nd shift from 1400 hrs to 2200 hrs 333 Each Shift
13 4.03 3rd shift from 2200 hrs to 0600 hrs 333 Each Shift
14 5 Manning & Operation and routine maintenance of Pump house Map offrs Quarters by providing of minimum one Pump Operator (Skilled) in each shift of 08 hrs in 02 shift (1st shift from 0600 hrs to 1400 hrs & 2nd shift from 1400 hrs to 2200 hrs) including Sunday & Holidays and repair to normal defects as and when required and maintaining log sheet for running of pumps and duty personnel shall be responsible for complete fill up of the over head reservoir & sump during duty hours including cleaning the Pump House/RO Plant and cutting of grasses surrounding 10 mtrs areas, complete all as specified and directed by Engr-in- charge.
15 5.01 1st shift from 0600 hrs to 1400 hrs 333 Each Shift
16 5.02 2nd shift from 1400 hrs to 2200 hrs 333 Each Shift
17 6 Note for Items 4.00 & 5.00 above:- (1) Centrifugal pumps, Borewells, Fire fighting pump, and DG Set maintaning the records of incoming and out going parameters in an interval of 15 mins, physical checking of the pump motors and cables of LT panel and doing minor repair after taking aproval JE. Minor repair includes tightening/Loosing of nuts and bolts. \n(2) Maintenance of earthing of installation, including testing of earthing, and recording the values in prescribed format and getting it endorsed by Engr-in-Charge. \n(3) Manning and maintanance of Chlorination process such as mixing and preparation of as per the dosage to be given Engr-in- charge for each installation \n(4) Daily chlorination record as directed by Engr-in-charge. (5) Daily water supply record as directed by Engr-in-charge. (6) Keeping the installation, equipment, rest room,wash room and surrounding area neat and clean \n(7) Check proper alignment of coupling of booster pumps of chloronome (8) Tighten the foundation bolts of installed equipment (9) Grease the vertical hollow shaft motor bearings. (10) Operation of Submersible pumps
18 7 AIR CONDITIONING PLANT \nManning & Operation and routine maintenance of water supply installation and AC plant at 16 BRD, AF palam (round the clock) by employing minimum one operator (Skilled) and one helper (Unskilled) in each shift of 08 hrs in 03 shift (Ist shift from 0600 Hours to 1400 hours, 2nd shift 1400 hours to 2200 hours and 3rd shift from 2200 hours to 0600 hours, including Sunday and holidays ) including necessary cleaning, grass cutting & maintenance of complete sub station including regular maintenance such as daily checking, cleaning monthly/quarterly/half yearly including on/off of street light at scheduled timings for operation of both (A & B) as mentioned below:- \n(A) AC PLANTS 16 BRD :-\n(a) AC Plant 3x30TR capacity 2 units will be in operation and one unit will be stand by to be operation in 3 shifts per day round the clock (shift of 08 hours) all as required and directed by Engnr-in-Charge. \n(b) Regular maint such as daily checking cleaning monthly, quarterly half yearly maint including repair with consumable items such as cotton waste, grease, fast moving parts gland packing etc. The AC plant comprising of compressor, compressor motor condensers, AHU refrigerant piping control pumps, water supply lines, cooling tower, drought type, electrical panels instrument starters strip heaters and provision of wiring all as specified and directed by Engr-in-charge for smooth and efficient performance of AC plant to achieve desired inside condition i.e. 70 degree F+- (Plus/minus) 5 degree RH through out the ear at 16 BRD AF Palam. \n(c) Central AC plant 3 x 30 Ton, 2x30 Ton to be run at a time and one unit stand by comprising of the following :-\n(i) Mono block pumping set 3 HP = 06 Nos \n(ii) AHU 12000 CFM capacity 3 Phase 415 volt 20 HP AC motor - 01 Nos\n(iii) 3 phase 415 volt cubical type main electric control panel incoming and outgoing main switch/MCBs with protection devices like starter inter skilling system for compressor pumping set AHU and cooling tower.
19 7.01 (B) D G SET (16 BRD)\n(C) Water supply Installation (16 BRD)\n(a) Operation Regular maint , periodical checking of DG set 100 KVA installed near to central AC plant installation and all consumable item. \n(b) Centrifugal Pump Set of capacity 10 H.P - 02 Nos \n(c) Expendable item like grease, cotton, waste nuts & bolts and washer, electrolyte copper, wire in pieces battery terminal coolant for radiator etc to provided by the contractor with out any extra cost \n(d) Water supply installation shall be kept ready for operation the event of power failure.
20 7.02 1st shift from 0600 hrs to 1400 hrs 333 Each\nShift
21 7.03 2nd shift from 1400 hrs to 2200 hrs 333 Each\nShift
22 7.04 3rd shift from 2200 hrs to 0600 hrs 333 Each\nShift
23 8 Manning & Operation and routine maintenance of Radar Lab AC plant at 13 BRD Tech Area, AF Stn palam (Two Shift) by employing minimum one operator (Skilled) and one helper (Unskilled) in each shift of 08 hrs in 02 shift (Ist shift from 0600 Hours to 1400 hours, 2nd shift 1400 hours to 2200 hours , including Sunday and holidays ) including necessary cleaning, grass cutting & maintenance of complete sub station including regular maintenance such as daily checking, cleaning monthly/quarterly/half yearly including on/off of street light at scheduled timings for operation as mentioned below:- \n(A) AC PLANTS 13 BRD Tech Area :-\n(a) AC Plant 3x50TR capacity 2 units will be in operation and one unit will be stand by to be operation in 2 shifts per day round the clock (shift of 08 hours) all as required and directed by Engnr-in-Charge.\n(b) Regular maint such as daily checking cleaning monthly, quarterly half yearly maint including repair with consumable items such as cotton waste, grease, fast moving parts gland packing etc. The AC plant comprising of compressor, compressor motor condensers, AHU refrigerant piping control pumps, water supply lines, cooling tower, drought type, electrical panels instrument starters strip heaters and provision of wiring all as specified and directed by Engr-in-charge for smooth and efficient performance of AC plant to achieve desired inside condition i.e. 70 degree F+- (Plus/minus) 5 degree RH through out the ear at 16 BRD AF Palam.\n(c) Central AC plant 3 x 50 Ton, 2x50 Ton to be run at a time and one unit stand by comprising of the following :-\n(i) Mono block pumping set 7.5 HP = 06 Nos \n(ii) AHU 12000 CFM capacity 3 Phase 415 volt 20 HP AC motor - 01 Nos\n(iii) 3 phase 415 volt cubical type main electric control panel incoming and outgoing main switch/MCBs with protection devices like starter inter skilling system for compressor pumping set AHU and cooling tower.
24 8.01 1st shift from 0600 hrs to 1400 hrs 205 Each\nShift
25 8.02 2nd shift from 1400 hrs to 2200 hrs 205 Each\nShift
26 9 Manning & Operation and routine maintenance of Installations at Sewage Treatment Plant 13 BRD, Sewage Pump House , DG set of Officer's Qtr Sewage Plant, DSC Qtr area, MAP Qtr area, in 02 shift (Ist shift from 0600 Hours to 1400 hours and 2nd shift 1400 hours to 2200 hours) including sunday and holiday each by employing minimum one pump operator (Skilled) and one helper (Unskilled) in each shift of 08 hrs for operation of the above installations including regular maintenance such as daily checking, cleaning monthly, quarterly & half yearly including grass cutting and on/off of street light at scheduled timings and minor repair of sewage Pumps with consumable items such as Cotton waist, grease, fast moving parts such as Gland packing etc for the following plants :- \n(A) Sewage Treatment Plant :\n(i) Centrifugal Pump Set of capacity 20 H.P - 02 Nos\n(ii) Centrifugal Non-Clogging Pump Set 7.5 H.P-02 Nos\n(iii) Blower Pumps 12.5 H.P - 02 Nos\n(iv) Mono block Centrifugal Pump Sets 3 H.P - 02 Nos\n(v) FMR Tank & Chlorine Dozing Pump - 01 No Each\n(vi) ACF & MGF (Daily back wash of both the filters) - 01 Nos Each\n(vii) Cleaning of Bar screen & grease trap regularly - 01 No \n(viii) Operation of mono block submersible pump set 7.5 H.P at S.N.C.O Mess, 13 BRD AF - 01 No (B) Sewage Pump House :\n(i) Centrifugal Non-Clogging Pump Set 40 H.P - 03 Nos\n(ii) DG Set\n(a) Manning, operation, Regular maint and a periodical checking of DG set 82.5 KVA installed at Sewage Pump House including all consumable item and spare parts listed in this schedule. (b) Expendable items like grease, cotton waste units bolts and washer, electrolyte, copper wire in pieces, battery terminal, coolant for radiator etc will provided by the contractor without any extra cost.\n(c) Officer's Qtr Sewage Pump & Madhumilon sewage pump: \n(i) Operation of non clogging mono block summersible pump set.-10 HP- 04 Nos
27 9.01 1st shift from 0600 hrs to 1400 hrs 333 Each Shift
28 9.02 2nd shift from 1400 hrs to 2200 hrs 333 Each Shift
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.