Operational And Maintenance Work Of Civil Infra At Bhimtal Pot Holes , Road Sweeping , Drain Cleaning Bush Cutting
Tender Overview
Project Description
Operational And Maintenance Work Of Civil Infra At Bhimtal Pot Holes , Road Sweeping , Drain Cleaning Bush Cutting , Carriage Way : General Cleaning Of Road Surface In One Meter Wide Strip Of Road Along Both The Edges Of Road By Manual Labour Such As Dust , Silt , Animal Dung , Garbage Spreaded On Road Etc . And Its Disposal From The Site With All Works Complete As Per Direction Of Engineer-In-Charge . ( Enclosed Specification ) , Carriage Way : Filling Pot- Holes And Patch Repairs With - Bituminous Concrete , 40Mm . ( Removal Of All Failed Material , Trimming Of Completed Excavation To Provide Firm Vertical Faces , Cleaning Of Surface , Painting Of Tack Coat On The Sides And Base Of Excavation As Per Clause 503 , Back Filling The Pot Holes With Hot Bituminous Material As Per Clause 504 , Compacting , Trimming And Finishing The Surface To Form A Smooth Continuous Surface , All As Per Clause 3004 . 2 ) For Grading I - 19Mm ( Nominal Size ) Material . , Drainage : Cleaning Of Open Storm Water Drain Including , Desilting And Disposal Of Material As Per Direction Of Engineer-In Charge . ( Enclosed Specification ) , Drainage : Brick Masonry Work In Cement Mortar 1:3 In Foundation Complete Excluding Pointing And Plastering , As Per Drawing And Technical Specification Clause 1300 Dlp One Year . , Drainage : Plastering With Cement Mortar ( 1:3 ) , 15 Mm Thick On Brickwork In Substructure As Per Technical Specification Clause 1300 & 2200 . Dlp One Year , Drainage : Excavation For Structures Earthworks In Excavation For Structures As Per Drawing And Technical Specifications Clause 305 . 1 Including Settting Out , Construction Of Shoring And Bracing , Removal Of Stumps And Other Deleterious Material And Disposal Upto A Lead Of 50M , Dressing Of Sides And Bottam And Backfilling In Trenches With Excavated Suitable Material . , Drainage : Concrete With Cement Coarse Sand And 40Mm Gauge Stone Ballast In Proportion 1:4:8 In Foundations And Floors Including Supply Of All Material , Labour And T&P Etc . Required For Proper Completion Of The Works As Per Drawings And Technical Specifications Clause 802 , 803 , 1202 & 1203 . , Shoulders / Medians / Green Area : Clearing And Grubbing Road Land Including Uprooting Wild Vegetation , Grass , Bushes , Shrubs , Saplings And Trees Of Girth Upto 300 Mm , From Soft Area Of R . O . W And Removal Of Stumps Of Such Trees Cut Earlier And Disposal Of Unserviceable Materials And Stacking Of Serviceable Material To Be Used Or Auctioned , Including 50 Meter Lead Removal And Disposal Of Top Organic Soil Not Exceeding 150 Mm In Thickness As Per Technical Specifications Clause 201 . , Road Furniture : Providing And Laying Of Interlocking Concrete Block Pavements Having Thickness 80 Mm And Compressive Strength Not Less Than 35 Mpa As Per Drawings And Technical Specification Clause 1504 . Qty . Taken 7 M / Km . Dlp One Year
BOQ
| Name of Work: Annual Operation & Maintenance of Civil Works at IIE-Bhimtal | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1.01 | CARRIAGE WAY : General Cleaning of Road surface in one meter wide strip of road along both the edges of road by Manual Labour such as Dust, Silt, Animal dung, garbage spreaded on road etc. and its disposal from the site with all works complete as per direction of Engineer-in-charge.( enclosed Specification) | item1 | 12455.6 | SQM |
| 2 | 1.02 | CARRIAGE WAY : Filling Pot- holes and Patch Repairs with - Bituminous concrete, 40mm. (Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2) for grading I - 19mm(Nominal size) Material. | item2 | 355 | SQM |
| 3 | 1.03 | DRAINAGE : Cleaning of open storm water drain including, desilting and disposal of material as per direction of Engineer-in charge. (enclosed Specification) | item3 | 10010.8 | RM |
| 4 | 1.04 | DRAINAGE : Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing and technical specification clause 1300 DLP One Year. | item4 | 20.3 | CUM |
| 5 | 1.05 | DRAINAGE : Plastering with cement mortar (1:3), 15 mm thick on brickwork in substructure as per technical specification clause 1300 & 2200. DLP One Year | item5 | 160 | SQM |
| 6 | 1.06 | DRAINAGE : Excavation for structures Earthworks in excavation for structures as per drawing and technical specifications Clause 305.1 including settting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides and bottam and backfilling in trenches with excavated suitable material. | item6 | 55 | CUM |
| 7 | 1.07 | DRAINAGE : Concrete with cement coarse sand and 40mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc.required for proper completion of the works as per drawings and technical specifications Clause 802,803,1202 & 1203. | item7 | 7.41 | CUM |
| 8 | 1.08 | SHOULDERS / MEDIANS / GREEN AREA : Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, from soft area of R.O.W and removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including 50 meter lead removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specifications clause 201. | item8 | 0.18 | HECT. |
| 9 | 1.09 | ROAD FURNITURE : Providing and Laying of Interlocking Concrete Block Pavements having thickness 80 mm and compressive strength not less than 35 MPa as per drawings and Technical Specification Clause 1504. Qty. taken 7 m / Km. DLP one Year | item9 | 40 | SQM |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender