Operational And Maintenance Work Of Electrical Infrastructure It Park Street Light Maintenance Pump House Etc , Street Light Maintenance And Pump House Maintenace , Lifting Vehical / Hydra Required For Overhead Street Lights Maintenance Purpose ( On Hire Basis ) ( 02Days / Month ) ( As Per The Requirement ) , Repair Of 60Watt Led Street Lights By Replacement Of Damaged / Diffused Drivers 60Watt Make-C&S . , Phillips , Havells , Bajaj ( As Per The Site Requirement ) Including Material Charges But Excluding Labour Charges . Dlp 6 Months , Repair Of 60Watt Led Street Lights By Replacement Of Damaged / Diffused Pcb Plates 60Watt Make-C&S . , Phillips , Havells , Bajaj ( As Per The Site Requirement ) Including Material Charges But Excluding Labour Charges . Dlp 6 Months , Repair Of 150Watt Led High Mast Lights By Replacement Of Damaged / Diffused Drivers 150Watt Make -C&S . , Phillips , Havells , Bajaj ( As Per The Site Requirement ) Including Material Charges But Excluding Labour . Dlp 6 Months , Repair Of Led High Mast Lights Replacing Damaged / Diffused Pcb Plates 150 Watt Make -C&S . , Phillips , Havells , Bajaj ( As Per The Site Requirement ) Including Material Charges But Excluding Labour . Dlp 6 Months , Repairing Of Street Lights / High Mast Electrical Control Panel Replacing 01No 3Pole Power Contactor 100Amp Including Material Charges But Excluding Labour . ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Street Lights / High Mast Electrical Control Panel Replacing Timer Auto Light , Including Material Charges But Excluding Labour . ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Street Lights / High Mast Electrical Control Panel Replacing 3Pole Mccb , 100Amp Including Material Charges But Excluding Labour . ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Street Lights / High Mast Electrical Control Panel Replacing Isolator 02Way 40 Amps Including Material Charges But Excluding Labour . Total 02 No ( As Per The Requirement Raised By Engineer-In Charge ) , Replacing The Burnt / Damage Pvc 1 . 5 Sqmm Single Core Copper Wire By Required Size Of Frls Cable Excluding Labour . ( As Per The Requirement ) ( Dsr 2018-1101 ) , Supply Of Pvc Xlpe Power ( Armoured ) Cable 1 . 1 Kv Grade 4X 16 Sqmm Excluding Labour ( As Per The Requirement ) , Laying Of One Number Pvc Insulated And Pvc Sheathed / Xlpe Power Cable 1 . 1 Kv Grade Of Size Up To 35 Sqmm Direct In Ground Including Excavation , Sand Cushioning , Protective Covering And Refilling The Trench Etc As Required . ( Dsr No . 7 . 1 . 1 ) , Erection Of Metallic Pole 8Mtr To 11 Mtr ( 10Mtrs ) Height , In Cement Concrete 1:3:6 Foundation Including Excavation And Refilling Etc Including Labour And Material . ( Dsr 11 . 4 ) ( As Per The Requirement Raised By Engineer-In Charge ) , Wages / Labour Charges For Electricians To Be Depute At Respective Industrial Estates Of Siidcul For O&M Work ( For 8Months ) , Wages / Labour Charges For Helpers To Be Depute At Respective Industrial Estates Of Siidcul For O&M Work , Annual Maintenance Of Transformer Installed For Main Supply Of Street Lights Inclduing Dehydration Of Transformer Oil , Oti / Wti Calibration Etc . ( Once In Year ) , Repairing And Rewinding Of 35Hp Submersibile Tubewell Motor Complete In All Respect Including Lowering And Lifting , Labour & Material ( As Per Requirement ) , Repairing Of 35Hp , 10Stage Submersibile Pump By Repair / Replacement Of Pump-Bush , Sleeves , Necking Etc . Complete In All Respect Inclduing Labour & Material . ( As Per Requirement ) , Repairing Of Submericible Motor Electrical Control Panel Replacing 01No 3Pole Power Contactor Type Ml-04 Including Material Charges But Excluding Labour . ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Submericible Motor Electrical Control Panel Replacing 200Amp Kitkat Switch Including Material Charges But Excluding Labour . ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Submericible Motor Electrical Control Panel Replacing Sfu Tpn 200Amp Including Material Charges But Excluding Labour . ( As Per The Requirement Raised By Engineer-In Charge ) , Replacement Of Electric Cable For Power Supply To Submersibile Motor Pump Complete In All Respect Including Material & Labour Charges . ( Size 3X6mm2 ) ( As Per Requirement ) , Rewinding & Repairing Of Water Supply 15Hp Motor With Taking Out And Fixing In Position Complete In All Respect Inclduing Material And Labour Charges . , Repairing Of Water Supply Motor Electrical Control Panel Replacing 200Amp Kitkat Switch Including Material Charges But Excluding Labour . ( As Per The Requirement Raised By Engineer-In Charge ) , Repairing Of Water Supply Motor Electrical Control Panel Replacing Sfu Tpn 200Amp Including Material Charges But Excluding Labour . ( As Per The Requirement Raised By Engineer-In Charge )