| 1 | 1 | Clearing the scrub jungle / light jungle and disposing the debris to suitable place away from the site as directed by the engineer at site including all labour charges, hire charges for vehicle, tools and plants required, etc., complete. | item 1 | 540 | 1m² |
|---|
| 2 | 2 | Clearing the heavy jungle and disposing the debris to suitable place away from the site as directed by the engineer at site including all labour charges, hire charges for vehicle, tools and plants required, etc., complete. | item 2 | 2860 | 1m² |
|---|
| 3 | 3 | Earth work excavation and depositing on bank for laying floor concrete with initial lead of 10m & initial lift of 2m in all types of soil as directed by the Engineer at site including labour charges, leads, lifts, T&P etc., complete. | item 3 | 84 | 1m3 |
|---|
| 4 | 4 | Supplying and filling of excavated soil complying with standard specification and as directed by the Engineer at site, including cost of soil, labour charges, leads & lifts, etc. complete. | item 4 | 53 | 1m3 |
|---|
| 5 | 5 | Providing PCC 1:4:8 using 40mm HBG metal for flooring as directed by the Engineer at site, including cost of all materials, labour charges, curing, leads, lifts, etc., complete. | item 5 | 37 | 1m3 |
|---|
| 6 | 6 | Brick work in CM 1:4 using Fly ash Bricks of size 23x11x7.50cm as directed by the Engineer in charge including cost of all materials, labour charges, curing, lead, lift, T&P etc., complete. | item 6 | 0.8 | 1m3 |
|---|
| 7 | 7 | Supplying and laying one side polished Cuddapah slab of 38mm thick for sitting bench top, including cost of all materials, labour, lead, lift etc., complete. | item 7 | 6.5 | 1m² |
|---|
| 8 | 8 | Plastering in C.M 1:5, 12 mm thick for above floor surfaces including cost of all materials, labour charges, curing, lead, lift, etc., complete. | item 9 | 375 | 1m² |
|---|
| 9 | 9 | Providing two coats with exterior emulsion paint of approved quality and colour to the wall surfaces as directed by the Engineer at site, including cleaning the surface, cost of all materials, labour charges, leads & lifts etc., complete. | item 27 | 156 | 1m² |
|---|