| 1 | 1 | Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay. Stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders, as per standard specification, etc., complete. | item 1 | 7.7 | m3 |
|---|
| 2 | 2 | Earth work excavating and depositing on bank with initial lead of 10m and initial llift of 2.0m in soft disintegrated rock, laterite, soft rock (or) kankar not requiring blasting, as per standard specification, etc., complete. | item 2 | 3.3 | m3 |
|---|
| 3 | 3 | Filling with M- sand for filling the foundation and floor including M-sand, filling charges, with all leads and lifts, watering, consolidation etc., complete. | item 3 | 1.5 | m3 |
|---|
| 4 | 4 | Plain cement concrete in CC 1:4:8, using 40mm HBG metal including cost of cement, all materials, labour charges including consolidation, curing, all leads, lifts, as per standard specification etc., complete. | item 4 | 1.5 | m3 |
|---|
| 5 | 5 | Random rubble masonry in C.M.1:6 for foundation and basement including cost of all materials, lead, lifts, labour and curing charges etc., complete. | item 2 | 10 | m3 |
|---|
| 6 | 6 | Cement solid Block in CM 1:5 using 15 cm cement solid block for super structure including cost of all materials, labour charges, curing,scaffolding charges all leads and lifts etc., complete and as directed by Engineer. | item 3 | 4 | m3 |
|---|
| 7 | 7 | Wall Plastering with CM 1:5 12 mm thick for wall including cost of cement, labour, curing, all leads and lifts etc., complete as per standard specification.. | item 4 | 47 | m2 |
|---|
| 8 | 8 | Pointing with CM 1:3 for R.R. walls including cost of all materials, labour curing charges, all leads & lifts etc., complete. | item 2 | 13 | M2 |
|---|
| 9 | 9 | Clearing of juliflora jungle without uprooting using JCB machineries and mazdoor including lead lift and clearing away from the site . | item 2 | 40 | Hr |
|---|
| 10 | 10 | Supplying and fixing of earth coller of size dia 60x45x5cm for earth fits including cost of all materials, labour, lead, lift and fixing in position etc., complete. | item 3 | 60 | Nos |
|---|
| 11 | 11 | Supplying and fixing of 40 mm dia PVC pipe 10 Kg/cm2 (Shell thickness 2 to 3 mm) of appd. Quality for water supply line from water sump and delivery line including cost of pipe, bend, elbow, labour for cutting, threading, and fixing in position, testing all materials, solution, lead, lift etc., complete. | item 4 | 35 | Rm |
|---|
| 12 | 12 | Supplying and fixing of 25 mm dia PVC pipe 10Kg/cm2 (Shell thickness 2 to 3 mm) for water supply line, including cost of pipe, bend, elbow, labour for cutting, threading, and fixing in position, testing all materials, solution, lead, lift etc., complete. | item 2 | 80 | Rm |
|---|
| 13 | 13 | Labour charges for earth plate angles cutting the extra portion including cost of all materials, cutting machine,transport and labour charges, leads, lifts, etc., complete. | item 13 | 60 | Nos |
|---|
| 14 | 14 | GST | item 44 | | |
|---|
| 15 | 14.01 | SGST For bidders within Tamilnadu | item 45 | 1 | percentage |
|---|
| 16 | 14.02 | CGST For Bidders within Tamilnadu | item 46 | 1 | percentage |
|---|
| 17 | 14.03 | IGST For Bidders outside of Tamilnadu | item 47 | 1 | percentage |
|---|