Nhidcl/Meghalaya/Tura Bypass/Nh-51/2020 Consultancy Services For Preparation Of Detailed Project Report For Construction To 2-Lane Tura Bypass Between Existing Km 95 . 00 To Km 101 . 00 Of Nh-51 On Epc Mode In The State Of Meghalaya, Meghalaya-Meghalaya

National Highways and Infrastructure Development Corporation Limited-NHIDCL has published Nhidcl/Meghalaya/Tura Bypass/Nh-51/2020 Consultancy Services For Preparation Of Detailed Project Report For Construction To 2-Lane Tura Bypass Between Existing Km 95 . 00 To Km 101 . 00 Of Nh-51 On Epc Mode In The State Of Meghalaya. Submission Date for this Tender is 08-09-2020. Insurance Service Tenders in Meghalaya Meghalaya. Bidders can get complete Tender details and download the document.




Tender Notice

25075299
Nhidcl/Meghalaya/Tura Bypass/Nh-51/2020 Consultancy Services For Preparation Of Detailed Project Report For Construction To 2-Lane Tura Bypass Between Existing Km 95 . 00 To Km 101 . 00 Of Nh-51 On Epc Mode In The State Of Meghalaya
Open Tender
Indian
Meghalaya
Meghalaya
08-09-2020

Tender Details

Nhidcl/Meghalaya/Tura Bypass/Nh-51/2020 Consultancy Services For Preparation Of Detailed Project Report For Construction To 2-Lane Tura Bypass Between Existing Km 95 . 00 To Km 101 . 00 Of Nh-51 On Epc Mode In The State Of Meghalaya , Remuneration For Local Staff ( Inclusive Of Per Diem Allowance ) , Team Leader Cum Sr . Highway Engineer , Highway Cum Pavement Engineer , Senior Bridge Engineer , Traffic And Safety Expert , Material Cum Geotechnical Engineer Cum Geologist , Senior Survey Engineer , Environment Specialist , Quantity Surveyor/Documentation Expert , Land Acquisition Expert , Utility Expert , Sub Professional Staff ( To Be Assessed By Consultant As Per Requirement Of Assignment ) , Position , Position , Position , Support Staff ( Inclusive Of Per Diem Allowance ) , Office Manager , Typist , Office Boy , Transportation ( Fixed Costs ) , The Vehicles Hired By The Consultant Shall Include The Cost For Rental , Drivers , Operation , Maintenance , Repairs , Insurance , Etc . , Duty Travel To Site ( Fixed Costs ) , Trips , Office Rent ( Fixed Costs ) The Rent Cost Includes Maintenance , Cleaning , Repairs , Etc . , Office Rent , Office Supplies , Utilities And Communication ( Fixed Costs ) , Office Supplies , Drafting Supplies , Computer Running Costs , Domestic And International Communication , Office Furniture And Equipment ( Rental ) , Office Furniture And Equipment , Reports And Document Printing , Monthly Report ( 3 Copies Per Month ) , Inception Report & Qap , Environment And Social Impact Screening Report , Draft Feasibility Report , Final Feasibility Report , Strip Plan With L . A . Reports , Draft La And Clearances I Report , Final La And Clearances I Report , Draft Environmental Assessment Report& Rap , Final Environmental Assessment Report& Rap , Draft Detailed Design Report & Drawings Etc . Draft Emp , Draft Bidding Documents , Final Detailed Project Report With Bill Of Quantities , Cost Estimates , Updated Drawings Etc . Final Emp , Final Bidding Documents , Draft 3 ( A ) , 3 ( A ) And 3 ( D ) & 3G Notification For Land Acquisition ( 3 Copies Each ) , La & Clearances Ii Report , Survey And Investigation A . Topographical Survey ( Fixed Rate ) , Topographic Survey Including Hire Charges For Equipment ( Gps , Total Station , Auto Level Etc . ) And Supply Of Survey Teams Comprising Of Project Survey Filed Staff Etc . Inclusive Of Cost Of Materials , Labourer . , Detailed Topographic Surveys Using Mobile/ Aerial Lidar Or Equivalent Technology , Sub-Surface Utilities Detection Using Ground Penetrating Radar , Induction Locator Or Better Technologies , Survey/Investigation Using Network Survey Vehicle As Per Tor , Investigation ( Fixed Cost ) ( Lumpsum ) , Road And Bridge Inventory , Bbd Test And Pavement Evaluation , Roughness Survey , Axle Load Survey , Material Survey And Investigation , Sub-Grade Investigation , Traffic Survey , Socio-Economic & Census Survey/Studies , Land Acquisition Studies , Any Other Investigations/Surveys , Sub-Soil Investigation ( Boring ) ( Rate/M ) , A ) In Soil Other Than Hard Rock , B ) In Hard Rock , Fixing Boundary Pillars , Procuring And Fixing Boundary Pillars And Its Installation , Complete In All Respect As Per Irc:25 , 1967: Wherever The Proposed Alignment Follows The Existing Alignment , The Boundary Pillars Shall Be Fixed At An Interval Of 200M On Either Side Of Proposed Right Of Way . Wherever There Is A Proposal Of Realignment Of The Existing Highway And/Or Construction Of New Bypasses , Consultant Shall Fix Boundary Pillars Along The Proposed Alignment On The Extreme Boundary On Either Side Of The Project Highway At 50 M Interval , Other Miscellaneous Expenses ( Like Da , Internal Travel Expenses Other Incidentals ) ( Fixed Cost )

Key Value

Document Fees
INR 5900 /-
EMD
Refer document
Tender Value
Refer document

BOQ Items

Consultancy Services for Preparation of Detailed Project Report for “construction to 2-Lane Tura Bypass between existing km 95+00 to km 101+00 of NH-51 on EPC mode in the State of Meghalaya
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Remuneration for Local Staff (inclusive of per diem allowance) BI01010001010000000000000515BI0100001112
2 1.01 Team Leader cum Sr. Highway Engineer BI01010001010000000000000515BI0100001113 9 Month
3 1.02 Highway cum Pavement Engineer BI01010001010000000000000515BI0100001114 5 Month
4 1.03 Senior Bridge Engineer BI01010001010000000000000515BI0100001115 5 Month
5 1.04 Traffic and Safety Expert BI01010001010000000000000515BI0100001116 4 Month
6 1.05 Material cum GeoTechnical Engineer cum Geologist 6 Month
7 1.06 Senior Survey Engineer 7 Month
8 1.07 Environment Specialist 3 Month
9 1.08 Quantity Surveyor/Documentation Expert 6 Month
10 1.09 Land Acquisition Expert 10 Month
11 1.1 Utility Expert 4 Month
12 2 Sub Professional Staff (To be assessed by consultant as per requirement of assignment)
13 2.01 Position 1 Month
14 2.02 Position 1 Month
15 2.03 Position 1 Month
16 3 Support Staff (inclusive of per diem allowance)
17 3.01 Office Manager 300 Days
18 3.02 Typist 300 Days
19 3.03 Office Boy 300 Days
20 4 Transportation (Fixed Costs)
21 4.01 The vehicles hired by the Consultant shall include the cost For rental, drivers, operation, maintenance, repairs, insurance, etc. 300 Days
22 5 Duty Travel to Site (Fixed Costs)
23 5.01 Trips 10 Trips
24 6 Office Rent (Fixed Costs) \nThe rent cost includes maintenance, cleaning, repairs, etc.
25 6.01 Office Rent 300 Days
26 7 Office Supplies, Utilities and Communication (Fixed Costs)
27 7.01 Office Supplies 300 Days
28 7.02 Drafting Supplies 300 Days
29 7.03 Computer Running Costs 300 Days
30 7.04 Domestic and International Communication 300 Days
31 8 Office Furniture and Equipment (Rental)
32 8.01 Office Furniture and Equipment 300 Days
33 9 Reports and Document Printing
34 9.01 Monthly Report (3 copies per month) 30 Nos
35 9.02 Inception Report & QAP 3 Nos
36 9.03 Environment and Social Impact Screening Report 4 Nos
37 9.04 Draft Feasibility Report 4 Nos
38 9.05 Final Feasibility Report 6 Nos
39 9.06 Strip Plan with L.A. Reports 6 Nos
40 9.07 Draft LA and Clearances I Report 4 Nos
41 9.08 Final LA and Clearances I Report 4 Nos
42 9.09 Draft Environmental Assessment report& RAP 4 Nos
43 9.1 Final Environmental Assessment report& RAP 6 Nos
44 9.11 Draft Detailed Design Report & Drawings etc. Draft EMP 4 Nos
45 9.12 Draft Bidding Documents 4 Nos
46 9.13 Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. Final EMP 6 Nos
47 9.14 Final Bidding Documents 6 Nos
48 9.15 Draft 3(a) ,3(A) and 3(D)& 3G notification for land acquisition (3 copies each) 9 Nos
49 9.16 LA & Clearances II Report 6 Nos
50 10 Survey and Investigation A. Topographical Survey (Fixed Rate)
51 10.01 Topographic Survey including hire charges for equipment (GPS, Total Station, Auto Level etc.) and supply of survey Teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer. 30 Km
52 10.02 Detailed topographic surveys using mobile/ aerial LiDAR or equivalent technology 30 Km
53 10.03 Sub-surface utilities detection using Ground Penetrating Radar, Induction Locator or better technologies 1 Lumpsum
54 10.04 Survey/Investigation using Network Survey Vehicle as per TOR 30 Km
55 11 Investigation (Fixed cost)(lumpsum)
56 11.01 Road and Bridge Inventory 1 LumpSum
57 11.02 BBD Test and Pavement Evaluation 1 LumpSum
58 11.03 Roughness Survey 1 LumpSum
59 11.04 Axle Load Survey 1 LumpSum
60 11.05 Material Survey and Investigation 1 LumpSum
61 11.06 Sub-grade Investigation 1 LumpSum
62 11.07 Traffic Survey 1 LumpSum
63 11.08 Socio-economic & Census Survey/Studies 1 LumpSum
64 11.09 Land Acquisition Studies 1 LumpSum
65 11.1 Any other investigations/surveys 1 LumpSum
66 11.11 Sub-Soil Investigation (Boring) (Rate/m)
67 11.12 a) In soil other than hard rock 2000 Meter
68 11.13 b) In hard rock 300 Meter
69 12 Fixing Boundary pillars
70 12.01 Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval 1 Lumpsum
71 13.16 Other Miscellaneous expenses (Like DA, internal travel expenses other incidentals)(Fixed Cost) 1 LumpSum
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail