}

Nhidcl/Meghalaya/Tura Bypass/Nh-51/2020 Consultancy Services For Preparation Of Detailed Project Report For Construction To 2-Lane Tura Bypass Between Existing Km 95 . 00 To Km 101 . 00 Of Nh-51 On Epc Mode In The State Of Meghalaya, Meghalaya-Meghalaya

National Highways and Infrastructure Development Corporation Limited-NHIDCL has published Nhidcl/Meghalaya/Tura Bypass/Nh-51/2020 Consultancy Services For Preparation Of Detailed Project Report For Construction To 2-Lane Tura Bypass Between Existing Km 95 . 00 To Km 101 . 00 Of Nh-51 On Epc Mode In The State Of Meghalaya. Submission Date for this Tender is 08-09-2020. Insurance Service Tenders in Meghalaya Meghalaya. Bidders can get complete Tender details and download the document.




Tender Notice

25075299
Nhidcl/Meghalaya/Tura Bypass/Nh-51/2020 Consultancy Services For Preparation Of Detailed Project Report For Construction To 2-Lane Tura Bypass Between Existing Km 95 . 00 To Km 101 . 00 Of Nh-51 On Epc Mode In The State Of Meghalaya
Open Tender
Indian
Meghalaya
Meghalaya
08-09-2020

Tender Details

Nhidcl/Meghalaya/Tura Bypass/Nh-51/2020 Consultancy Services For Preparation Of Detailed Project Report For Construction To 2-Lane Tura Bypass Between Existing Km 95 . 00 To Km 101 . 00 Of Nh-51 On Epc Mode In The State Of Meghalaya , Remuneration For Local Staff ( Inclusive Of Per Diem Allowance ) , Team Leader Cum Sr . Highway Engineer , Highway Cum Pavement Engineer , Senior Bridge Engineer , Traffic And Safety Expert , Material Cum Geotechnical Engineer Cum Geologist , Senior Survey Engineer , Environment Specialist , Quantity Surveyor/Documentation Expert , Land Acquisition Expert , Utility Expert , Sub Professional Staff ( To Be Assessed By Consultant As Per Requirement Of Assignment ) , Position , Position , Position , Support Staff ( Inclusive Of Per Diem Allowance ) , Office Manager , Typist , Office Boy , Transportation ( Fixed Costs ) , The Vehicles Hired By The Consultant Shall Include The Cost For Rental , Drivers , Operation , Maintenance , Repairs , Insurance , Etc . , Duty Travel To Site ( Fixed Costs ) , Trips , Office Rent ( Fixed Costs ) The Rent Cost Includes Maintenance , Cleaning , Repairs , Etc . , Office Rent , Office Supplies , Utilities And Communication ( Fixed Costs ) , Office Supplies , Drafting Supplies , Computer Running Costs , Domestic And International Communication , Office Furniture And Equipment ( Rental ) , Office Furniture And Equipment , Reports And Document Printing , Monthly Report ( 3 Copies Per Month ) , Inception Report & Qap , Environment And Social Impact Screening Report , Draft Feasibility Report , Final Feasibility Report , Strip Plan With L . A . Reports , Draft La And Clearances I Report , Final La And Clearances I Report , Draft Environmental Assessment Report& Rap , Final Environmental Assessment Report& Rap , Draft Detailed Design Report & Drawings Etc . Draft Emp , Draft Bidding Documents , Final Detailed Project Report With Bill Of Quantities , Cost Estimates , Updated Drawings Etc . Final Emp , Final Bidding Documents , Draft 3 ( A ) , 3 ( A ) And 3 ( D ) & 3G Notification For Land Acquisition ( 3 Copies Each ) , La & Clearances Ii Report , Survey And Investigation A . Topographical Survey ( Fixed Rate ) , Topographic Survey Including Hire Charges For Equipment ( Gps , Total Station , Auto Level Etc . ) And Supply Of Survey Teams Comprising Of Project Survey Filed Staff Etc . Inclusive Of Cost Of Materials , Labourer . , Detailed Topographic Surveys Using Mobile/ Aerial Lidar Or Equivalent Technology , Sub-Surface Utilities Detection Using Ground Penetrating Radar , Induction Locator Or Better Technologies , Survey/Investigation Using Network Survey Vehicle As Per Tor , Investigation ( Fixed Cost ) ( Lumpsum ) , Road And Bridge Inventory , Bbd Test And Pavement Evaluation , Roughness Survey , Axle Load Survey , Material Survey And Investigation , Sub-Grade Investigation , Traffic Survey , Socio-Economic & Census Survey/Studies , Land Acquisition Studies , Any Other Investigations/Surveys , Sub-Soil Investigation ( Boring ) ( Rate/M ) , A ) In Soil Other Than Hard Rock , B ) In Hard Rock , Fixing Boundary Pillars , Procuring And Fixing Boundary Pillars And Its Installation , Complete In All Respect As Per Irc:25 , 1967: Wherever The Proposed Alignment Follows The Existing Alignment , The Boundary Pillars Shall Be Fixed At An Interval Of 200M On Either Side Of Proposed Right Of Way . Wherever There Is A Proposal Of Realignment Of The Existing Highway And/Or Construction Of New Bypasses , Consultant Shall Fix Boundary Pillars Along The Proposed Alignment On The Extreme Boundary On Either Side Of The Project Highway At 50 M Interval , Other Miscellaneous Expenses ( Like Da , Internal Travel Expenses Other Incidentals ) ( Fixed Cost )

Key Value

Document Fees
INR 5900 /-
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail