}

Repairs And Maintenance Of Summer Cooling Appliances Under Ge Af Marathahalli Bangalore . , GE (AF) MARATHAHALLI-Karnataka

Military Engineer Services-MES has published Repairs And Maintenance Of Summer Cooling Appliances Under Ge Af Marathahalli Bangalore . . Submission Date for this Tender is 17-08-2020. Air Conditioner Tenders in GE (AF) MARATHAHALLI Karnataka. Bidders can get complete Tender details and download the document.




Tender Notice

25057793
Repairs And Maintenance Of Summer Cooling Appliances Under Ge Af Marathahalli Bangalore .
Open Tender
Indian
Karnataka
GE (AF) MARATHAHALLI
17-08-2020

Tender Details

Repairs And Maintenance Of Summer Cooling Appliances Under Ge Af Marathahalli Bangalore .

Key Value

Document Fees
INR 500 /-
EMD
INR 20000.0 /-
Tender Value
INR 10 Lakhs /-

BOQ Items

Name of Work: REPAIRS AND MAINTENANCE OF SUMMER COOLING APPLIANCES UNDER GE AF MARATHAHALLI BANGALORE.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Material and Labour for servicing of Window type AC and taking out the AC from its existing position/location, shifting the same, servicing the condenser and cooling coil with blower, cleaning the coils with caustic soda, replacement of sheet metal screws wherever necessary applying oil in fan motor bushes checking and rectifying the wiring defects, proper setting of thermostat & other electrical/ Refrigerant controls, cleaning the air filter, re-installing in its original position, connecting up all connections and testing all as directed for Window type Air Conditioner of 1.0 Ton. \nNote : Gas Charging shall be measured and paid separately under relevant item of this schedule 2 EACH JOB
2 2 All as per item No.1 here in before but for Window type Air Conditioner 1.5 Ton 10 EACH JOB
3 3 All as per item No.1 here in before but for Window type Air Conditioner 2.0 Ton 2 EACH JOB
4 4 Taking out burnt/ unserviceable sealed compressor Unit from Window type air conditioner, Supply & replacement factory sealed compressor unit, connecting refrigeration system after thorough flushing out the system with dry nitrogen, leak testing with nitrogen, vaccumising including neccessery brazing and welding arresting leakages and gas charging with refrigerant gas, testing, re-installing in its original position/location connecting up all electrical connections, testing the complete unit all as directed for Window type Air Conditioner 1.5 Ton. \nNotes :– \n(i)  Factory sealed compressor unit shall be of existing capacity and make. \n(ii)  Gas Charging shall be measured and paid separately under relevant item of this schedule. \n 1 EACH
5 5 All as per item No.4 here in before but for Window type Air Conditioner 2.0 Ton 1 EACH
6 6 Material and Labour for removing the Window type Air conditioner from installed position leak testing and arresting the leakages in condensor/evaporator coil by brazing etc and refixing complete for window type AC of 1.0 ton / 1.5 ton / 2.0 ton Capacity 4 EACH JOB
7 7 Material and Labour for charging of refrigerant gas F-22 / R-22 /R-32 / R-134A to the Window type Air conditioner, water coolers, Refrigerator and Split type air conditioner after vaccumising the complete system & pressure test with nitrogen to ensure complete system leak proof, testing of air conditioners, water coolers for proper functioning & cooling effect to the entire satisfaction of Engineer in Charge 75 KILOGRAM
8 8 Taking out the defective spare parts of window type AC of any capacity at its existing location by drawing out the AC from outer cover, supply and fixing new spare parts after thorough checking and rectification of defects in wiring circuits, pushing back the unit in its outer cover, testing and commissioning all as and directed.. \nNOTE:- Supply of spare parts will be measured separately under relevant items of this schedule. 5 EACH JOB
9 9 Supply only Starting Capacitor of 80 / 100 mfd. 20 EACH
10 10 Supply only Running Capacitor 36 / 45 mfd. 20 EACH
11 11 Supply only Potential Relay. 10 EACH
12 12 Supply only Thermostat. 10 EACH
13 13 Supply only Selector switch. 5 EACH
14 14 Supply only Control Knob. 5 EACH
15 15 Servicing the Voltage Stabilizer 4 KVA single phase of make - Soft line or equivalent after strip opening covers, taking out the burnt out winding from the transformer rewind with super enamelled copper winding wire, insulate properly, setting/testing of buck/boost relay, replacement of U/S electronic parts, assemble back & fixing in its original position including testing for proper functioning complete all as specified and as directed. 3 EACH
16 16 Servicing the Voltage Stabilizer 5 KVA single phase of make - Soft line or equivalent after strip opening covers, taking out the burnt out winding from the transformer rewind with super enamelled copper winding wire, insulate properly, setting/testing of buck/boost relay, replacement of U/S electronic parts, assemble back & fixing in its original position including testing for proper functioning complete all as specified and as directed. 3 EACH
17 17 Material and Labour for complete servicing after pumping down Indoor/outdoor units of split AC complete by cleaning condenser/ Evaporator coil with air blower, wet servicing of condenser coil unit with caustic soda etc, replacement of sheet metal screws wherever necessary applying oil in fan motor bushes checking and rectifying the wiring defects, proper setting of thermostat & other electrical/ Refrigerent controls, cleaning the air filter, duly painted with one coat of red oxide to the inner side and two coat of spray painting to the outer side of the outdoor unit after remove the out door unit, connecting up all connections and testing after gas charging if required all as directed for Split type Air Conditioner up to 1.0 Ton. \nNotes :- \n(i) The rate deemed includes for minor spares \n(ii) Gas shall be measured and paid separately under relevant item. 4 EACH JOB
18 18 All as per item No.17 here in before but for Split type Air Conditioner up to 1.5 Ton. 95 EACH JOB
19 19 All as per item No.17 here in before but for Split type Air Conditioner 2.0 Ton. 50 EACH JOB
20 20 All as per item No.17 here in before but for Split type Air Conditioner 2.5 Ton. 3 EACH JOB
21 21 All as per item No.17 here in before but for Split type Air Conditioner 3.0 Ton ( 2 x 1.5 Ton) 4 EACH JOB
22 22 Taking out burnt/ unserviceable sealed compressor Unit from split type air conditioner, Supply & replacement factory sealed compressor unit, connecting refrigeration system after thorough flushing out the system with dry nitrogen, leak testing with nitrogen, vaccumising and gas charging with refrigerant gas, testing, re-installing in its original position/location connecting up all electrical connections, testing the complete unit all as directed for Split type Air Conditioner 1.5 Ton. Notes:- \n(i) Factory sealed compressor unit shall be of existing capacity/Make. \n(ii) Gas Charging shall be mesasured and paid separately under relavent item 15 EACH
23 23 All as per item No.22 here in before but Split type Air Conditioner 2.0 Ton 5 EACH
24 24 All as per item No.22 here in before but Split type Air Conditioner 2.5 Ton 2 EACH
25 25 Material and Labour for removing the Split type Air conditioner outdoor unit/indoor unit from installed position leak testing & arresting the leakages in condenser coil by brazing etc complete for Split type AC 1.5 ton / 2.0 ton / 2.5 ton.\nNote :- Gas Charging shall be mesasured and paid separately under relavent item 25 EACH JOB
26 26 Taking down the Unserviceable IDU blower motor and Supplying and Fixing IDU blower motor capacity as per existing make all as directed for 1.5 Tr split AC. 10 EACH
27 27 Taking down the Unserviceable IDU blower motor and Supplying and Fixing IDU blower motor capacity as per existing make all as directed for 2.0 Tr split AC. 10 EACH
28 28 Taking down the Unserviceable Condenser fan blade and Supplying and Fixing as per existing make all as directed for Condenser fan blade 1.5 TR. 10 EACH
29 29 Taking down the Unserviceable Condenser fan blade and Supplying and Fixing as per existing make all as directed for Condenser fan blade 2.0 TR. 10 EACH
30 30 Taking down the Unserviceable Condenser fan motor and Supplying and Fixing as per existing make all as directed for 1.5 TR split AC. 10 EACH
31 31 Taking down the Unserviceable Condenser fan motor and Supplying and Fixing as per existing make all as directed for 2.0 TR split AC. 6 EACH
32 32 Supplying and Fixing in repairs Copper refrigerant pipe Copper tube 1/2 " x 1/4". 30 RUNNING METRE
33 33 Supplying and Fixing in repairs Copper refrigerant pipe Copper tube 5/8 " x 1/4". 30 RUNNING METRE
34 34 Taking out existing Unserviceable Starting Capacitor and Supplying and Fixing Starting Capacitor of 80 / 100 mfd for Split type AC 1.5 ton / 2.0 ton / 2.5 ton. 30 EACH
35 35 Taking out existing Unserviceable Starting Capacitor and Supplying and Fixing Starting Capacitor of 36 / 45 mfd for Split type AC 1.5 ton / 2.0 ton / 2.5 ton. 30 EACH
36 36 Taking out existing Unserviceable Potential Relay and Supply and Fixing Potential Relay for Split type AC 1.5 ton / 2.0 ton / 2.5 ton. 20 EACH
37 37 Taking down perished Unserviceable insulation cover of refrigerent piping and Supplying & Fixing brutile rubber insulation for refrigerent pipings of suitable size. 50 RUNNING METRE
38 38 Taking out existing Unserviceable Remote Control and Supplying & Fixing Remote Control with cord wire for Split type AC 1.5 ton / 2.0 ton / 2.5 ton. 12 EACH
39 39 Taking out existing Unserviceable Air Filter and Supplying & Fixing Air filter for Split type 1.5 ton / 2 ton /2.5 ton 50 EACH
40 40 Removing existing Unserviceable fan motor of Condenser of Split type AC & rewinding of fan motor with suitable size of super enamelled copper winding wire etc Complete for Split type AC 1.5 ton / 2.0 ton / 2.5 ton. 15 EACH
41 41 Taking out the AC Manager from position after bypassing the power supply to split ACs, servicing the load manager for pro switching on / off two Nos split ACs. \nNote : Spares shall be measured and paid separately. 12 EACH JOB
42 42 Supply Only Controller Card for Split type AC 1.5 ton / 2.0 ton / 2.5 ton. 5 EACH
43 43 Supply Only Micro Controller with Embedded software for Split type AC 1.5 ton / 2.0 ton / 2.5 ton. 5 EACH
44 44 Supply Only Relays for Split type AC 1.5 ton / 2.0 ton / 2.5 ton. 5 EACH
45 45 Supply Only Sensors with 5 mtr cable for Split type AC 1.5 ton / 2.0 ton / 2.5 ton. 5 EACH
46 46 Supply Only Fuses for Split type AC 1.5 ton / 2.0 ton / 2.5 ton. 5 EACH
47 47 Supplying and Fixing PVC flexible Conduit pipe 20mm dia medium grade including all accessories for drain out pipe all as directed. 50 RUNNING METRE
48 48 Supplying and Fixing inlet / outlet gas Valves suitable for split AC 1.5 ton / 2.0 ton / 2.5 ton all as directed. 10 EACH
49 49 Material and Labour for servicing water coolers of 40 / 80 ltrs Capacity Complete with cleaning condenser coil with air blower, wet servicing of condensor coil unit with caustic soda etc, replacement of sheet metal screws wherever necessary applying oil in fan motor bushes checking and rectifying the wiring defects, proper setting of thermostat & other electrical/ Refrigerent controls, connecting up all connections and testing all as directed. 2 EACH JOB
50 50 Material and Labour for servicing water coolers of 60 / 120 ltrs Capacity Complete with cleaning condenser coil with air blower, wet servicing of condensor coil unit with caustic soda etc, replacement of sheet metal screws wherever necessary applying oil in fan motor bushes checking and rectifying the wiring defects, proper setting of thermostat & other electrical/ Refrigerent controls, connecting up all connections and testing all as directed. 2 EACH JOB
51 51 Taking out burnt / unserviceable Sealed Compressor Unit from Water coolers 40 / 80 Ltrs per Hr Cooling capacity, Supply & replacement factory Sealed compressor unit, connecting refrigeration system after thoroughly flushing out the system and leak testing with CO2, vacuumising and gas charging with refrigerant gas, testing, re-installing in its original position/location connecting up all electrical connections, testing the complete unit all as directed. Notes:- \n(i) Sealed compressor unit shall be replaced with existing capacity/Make. \n(ii) Gas Charging shall be mesasured and paid separately under relavent item 1 EACH JOB
52 52 Taking out burnt / unserviceable Sealed Compressor Unit from Water coolers 60 / 120 Ltrs per Hr Cooling capacity, Supply & replacement factory Sealed compressor unit, connecting refrigeration system after thoroughly flushing out the system and leak testing with CO2, vacuumising and gas charging with refrigerant gas, testing, re-installing in its original position/location connecting up all electrical connections, testing the complete unit all as directed. Notes:- \n(i) Sealed compressor unit shall be replaced with existing capacity/Make. \n(ii) Gas Charging shall be mesasured and paid separately under relavent item 1 EACH JOB
53 53 Material and Labour for removing the Water cooler from position and arresting the Leakages in condenser coil by brazing etc Complete for Water cooler 40 / 60 Ltrs per Hr Cooling Capacity. 2 EACH JOB
54 54 Taking out Unserviceable starting capacitor, Supplying & Fixing Starting capacitor suitable for Water cooler 40 Litres/Hr or 60 litres/Hr Cooling capacitor. 4 EACH
55 55 Taking out Unserviceable running capacitor, Supplying & Fixing running capacitor suitable for Water cooler 40 Litres/Hr or 60 litres/Hr Cooling capacitor. 3 EACH
56 56 Taking out existing unserviceable thermostat, Supplying & Fixing thermostat for Water cooler 40 Litres / Hr or 60 litres/ Hr Cooling capacity. 3 EACH
57 57 Taking out existing Unserviceable potential relay, Supplying & Fixing Potential relay of for Water cooler of 40Ltr/Hr or 60 Ltrs/Hr Cooling capacity. 2 EACH
58 58 Taking out Unserviceable OLP from Water cooler, Supplying & Fixing OLP suitable for Compressor all as directed. 1 EACH
59 59 Taking out Unserviceble fan motor, Supplying & Fixing Fan motor (for Water Cooler Capacity 40 Ltrs/Hr or 60 Ltrs/Hr cooling capacity). 2 EACH
60 60 Material and Labour for taking out defective fan blade of Water Cooler of any make & size Supplying and Fixing new Fan blade of same size and design as existing all as directed. 2 EACH
61 61 Taking Out defective PVC flexible connector, Supplying & Fixing heavy duty PVC flexible connection braided type 15mm dia and 450mm long with nuts/ washers on either end all as directed. 3 EACH
62 62 Material and Labour for Servicing Refrigerators up to 185 Lts capacity complete with cleaning condenser coil with air blower, wet servicing of condenser coil unit with caustic soda etc, replacement of sheet metal screws wherever necessary, checking and rectifying the wiring defects, proper setting of thermostat & other electrical/ Refrigerent controls, connecting up all connections and testing all as directed. 1 EACH JOB
63 63 Material and labour for Servicing Refrigerators up to 185 - 400 Lts capacity complete with cleaning condenser coil with air blower, wet servicing of condenser coil unit with caustic soda etc, replacement of sheet metal screws wherever necessary, checking and rectifying the wiring defects, proper setting of thermostat & other electrical/ Refrigerent controls, connecting up all connections and testing all as directed. 1 EACH JOB
64 64 Taking Out Unserviceable / burntout Sealed Compressor Unit from Refrigerator, Supply & replacement Factory Sealed Compressor unit, connecting with copper piping by braziing & Copper tubing etc Complete Up to 185 Lts capacity.\nNotes:- \n(i) Sealed compressor unit shall be replaced with existing capacity/Make. \n(ii) Gas Charging shall be mesasured and paid separtely under relavent item 1 EACH
65 65 Taking Out Unserviceable / burntout Sealed Compressor Unit from Refrigerator, Supply & replacement Factory Sealed Compressor unit, connecting with copper piping by braziing & Copper tubing etc Complete Up to 185 - 400 Lts capacity.\nNotes:- \n(i) Sealed compressor unit shall be replaced with existing capacity/Make. \n(ii) Gas Charging shall be mesasured and paid separtely under relavent item 1 EACH
66 66 Removing the Refrigerator from position and arresting the Leakages in Condenser Coil by brazing etc. complete for refrigerator Up to 285 Ltrs. 1 EACH JOB
67 67 Taking Out existing Unserviceable Thermostat and Supplying and Fixing Thermostat for Refrigerator 165 Ltrs / 285 ltrs. 1 EACH
68 68 Taking Out existing Unserviceable Box Type Relay, Supplying and Fixing Box type Relay for Refrigerators 165 Ltrs / 285 Ltrs. 1 EACH
69 69 Taking Out existing Unserviceable OLP, Supplying and Fixing OLP for Refrigerator 165 Ltrs / 285 ltrs. 1 EACH
70 70 Supply and Fixing in repairs Metal clad switch socket Single pole and neutral enclosure with a two pin and earth plug and socket complete with One Single pole MCB SP 20 to 32 Amps and fixed concealed in walls Complete all as specified and as directed.\n 2 EACH
71 71 Pumping down the Compressor before dismantling inner and outer units disconnecting electric connections also without any damage to existing system, reinstalling of inner and outer units in new locations Complete with brackets and civil works (making holes in wall) complete finishing as required, assembling of inner & outer units including connection of suction and discharge pipes, testing connection etc with topping up refrigerant gas as required to maintaining pressure all as specified and directed. 2 EACH
72 72 Material and labour for servicing Deep freezer upto 400 Lts capacity complete with cleaning condenser coil with air blower, wet servicing of condenser coil unit with caustic soda etc, replacement of sheet metal screws wherever necessary, checking and rectifying the wiring defects, proper setting of thermostat & other electrical/ Refrigerent controls, connecting up all connections and testing all as directed. 1 EACH
73 73 Taking down of old u/s AC manager and Supply & fix AC load manager with built in programme for on/off of 2 Nos of 1.5 TR/2 TR capacity split type Acs suitable for operating on single phase 230 volts all as specified and directed. 3 EACH
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail