| 1 | 1 | NAME OF WORK :Providing 562 Nos FHTC To Sathangudi village Westside in Sathangudi Panchayat in Thirumangalam block in Madurai District | | | |
|---|
| 2 | 2 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers (Measurement as per Surveying Data with reference to Drawings) | | 102.06 | Cum |
|---|
| 3 | 3 | Provision for Labour Charges for Laying of Pipes | | | |
|---|
| 4 | 4 | Bore to OHT 90 mm dia Pvc Pipe | | 72 | Rm |
|---|
| 5 | 5 | Pumbing Line63 mm dia Pvc Pipe | | 90 | Rm |
|---|
| 6 | 6 | 50mm GI Pipe | | 3810 | Rm |
|---|
| 7 | 7 | Supply of Following pipes and Materials including all cost etc complete | | | |
|---|
| 8 | 8 | 63mm PVC pipe 6KSC Main Line | | 72 | Rm |
|---|
| 9 | 9 | 90mm PVC pipe 6KSC Main Line | | 90 | Rm |
|---|
| 10 | 10 | 50mm GI Pipe | | 3810 | Rm |
|---|
| 11 | 11 | 50mm GI Coupling | | 635 | Nos |
|---|
| 12 | 12 | 50 mm GI Tee | | 28 | Nos |
|---|
| 13 | 13 | 50mm Gate Valve | | 9 | Nos |
|---|
| 14 | 14 | 50mm GI Elbow | | 20 | Nos |
|---|
| 15 | 15 | 50mm GI Bend | | 10 | Nos |
|---|
| 16 | 16 | 50 mm GI Union | | 20 | Nos |
|---|
| 17 | 17 | Watermetre | | 8 | Nos |
|---|
| 18 | 18 | Earth work excavation in all clauses of soil as per SS20B. | | | |
|---|
| 19 | 19 | Refilling with excavated eartfilling inculding all labour charges for etc complete | | 102.06 | Cum |
|---|
| 20 | 20 | Towards cost and supply of Cutting andf threading charges for GI Pipe etc complete | | 396 | Rm |
|---|
| 21 | 21 | Provision for FHTC | | 562 | Nos |
|---|
| 22 | 22 | Provision of Tap connection for Govt buildings | | 3 | Nos |
|---|
| 23 | 23 | Provision for Name Board | | 1 | Hr |
|---|
| 24 | 24 | NAME OF WORK :Providing 656 Nos FHTC To Sathangudi village East side in Sathangudi Panchayat in Thirumangalam block in Madurai District | | | |
|---|
| 25 | 25 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers (Measurement as per Surveying Data with reference to Drawings) | | 113.4 | Cum |
|---|
| 26 | 26 | Provision for Labour Charges for Laying of Pipes | | | |
|---|
| 27 | 27 | Bore to OHT 90 mm dia Pvc Pipe | | 80 | Rm |
|---|
| 28 | 28 | Pumbing Line63 mm dia Pvc Pipe | | 100 | Rm |
|---|
| 29 | 29 | 50mm GI Pipe | | 3520 | Rm |
|---|
| 30 | 30 | Supply of Following pipes and Materials including all cost etc complete | | | |
|---|
| 31 | 31 | 63mm PVC pipe 6KSC Main Line | | 80 | Rm |
|---|
| 32 | 32 | 90mm PVC pipe 6KSC Main Line | | 100 | Rm |
|---|
| 33 | 33 | 50mm GI Pipe | | 3520 | Rm |
|---|
| 34 | 34 | 50mm GI Coupling | | 586.67 | Nos |
|---|
| 35 | 35 | 50 mm GI Tee | | 32 | Nos |
|---|
| 36 | 36 | 50mm Gate Valve | | 12 | Nos |
|---|
| 37 | 37 | 50mm GI Elbow | | 24 | Nos |
|---|
| 38 | 38 | 50mm GI Bend | | 12 | Nos |
|---|
| 39 | 39 | 50 mm GI Union | | 22 | Nos |
|---|
| 40 | 40 | Watermetre | | 8 | Nos |
|---|
| 41 | 41 | Earth work excavation in all clauses of soil as per SS20B. | | | |
|---|
| 42 | 42 | Refilling with excavated eartfilling inculding all labour charges for etc complete | | 113.4 | Cum |
|---|
| 43 | 43 | Towards cost and supply of Cutting andf threading charges for GI Pipe etc complete | | 420 | Rm |
|---|
| 44 | 44 | Provision for FHTC | | 656 | Nos |
|---|
| 45 | 45 | Provision of Tap connection for Govt buildings | | 2 | Nos |
|---|
| 46 | 46 | Provision for Name Board | | 1 | Hr |
|---|
| 47 | 47 | NAME OF WORK :Providing 180 Nos FHTC To Sathangudi village South side in Sathangudi Panchayat in Thirumangalam block in Madurai District | | | |
|---|
| 48 | 48 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers (Measurement as per Surveying Data with reference to Drawings) | | 79.38 | Cum |
|---|
| 49 | 49 | Provision for Labour Charges for Laying of Pipes | | | |
|---|
| 50 | 50 | Bore to OHT 90 mm dia Pvc Pipe | | 52 | Rm |
|---|
| 51 | 51 | Pumbing Line63 mm dia Pvc Pipe | | 74 | Rm |
|---|
| 52 | 52 | 50mm GI Pipe | | 3180 | Rm |
|---|
| 53 | 53 | Supply of Following pipes and Materials including all cost etc complete | | | |
|---|
| 54 | 54 | 63mm PVC pipe 6KSC Main Line | | 52 | Rm |
|---|
| 55 | 55 | 90mm PVC pipe 6KSC Main Line | | 74 | Rm |
|---|
| 56 | 56 | 50mm GI Pipe | | 3180 | Rm |
|---|
| 57 | 57 | 50mm GI Coupling | | 530 | Nos |
|---|
| 58 | 58 | 50 mm GI Tee | | 24 | Nos |
|---|
| 59 | 59 | 50mm Gate Valve | | 8 | Nos |
|---|
| 60 | 60 | 50mm GI Elbow | | 22 | Nos |
|---|
| 61 | 61 | 50mm GI Bend | | 8 | Nos |
|---|
| 62 | 62 | 50 mm GI Union | | 18 | Nos |
|---|
| 63 | 63 | Watermetre | | 6 | Nos |
|---|
| 64 | 64 | Earth work excavation in all clauses of soil as per SS20B. | | | |
|---|
| 65 | 65 | Refilling with excavated eartfilling inculding all labour charges for etc complete | | 79.38 | Cum |
|---|
| 66 | 66 | Towards cost and supply of Cutting andf threading charges for GI Pipe etc complete | | 320 | Rm |
|---|
| 67 | 67 | Provision for FHTC | | 180 | Nos |
|---|
| 68 | 68 | Provision of Tap connection for Govt buildings | | 1 | Nos |
|---|
| 69 | 69 | Provision for Name Board | | 1 | Hr |
|---|
| 70 | 70 | NAME OF WORK : Providing 83 Nos FHTC To Polnayakanpatti village in Sathangudi Panchayat in Thirumangalam block in Madurai District | | | |
|---|
| 71 | 71 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers (Measurement as per Surveying Data with reference to Drawings) | | 79.38 | Cum |
|---|
| 72 | 72 | Provision for Labour Charges for Laying of Pipes | | | |
|---|
| 73 | 73 | Bore to OHT 90 mm dia Pvc Pipe | | 52 | Rm |
|---|
| 74 | 74 | Pumbing Line63 mm dia Pvc Pipe | | 74 | Rm |
|---|
| 75 | 75 | 50mm GI Pipe | | 790 | Rm |
|---|
| 76 | 76 | Supply of Following pipes and Materials including all cost etc complete | | | |
|---|
| 77 | 77 | 63mm PVC pipe 6KSC Main Line | | 52 | Rm |
|---|
| 78 | 78 | 90mm PVC pipe 6KSC Main Line | | 74 | Rm |
|---|
| 79 | 79 | 50mm GI Pipe | | 790 | Rm |
|---|
| 80 | 80 | 50mm GI Coupling | | 131.67 | Nos |
|---|
| 81 | 81 | 50 mm GI Tee | | 10 | Nos |
|---|
| 82 | 82 | 50mm Gate Valve | | 6 | Nos |
|---|
| 83 | 83 | 50mm GI Elbow | | 16 | Nos |
|---|
| 84 | 84 | 50mm GI Bend | | 6 | Nos |
|---|
| 85 | 85 | 50 mm GI Union | | 12 | Nos |
|---|
| 86 | 86 | Watermetre | | 3 | Nos |
|---|
| 87 | 87 | Earth work excavation in all clauses of soil as per SS20B. | | | |
|---|
| 88 | 88 | Refilling with excavated eartfilling inculding all labour charges for etc complete | | 79.38 | Cum |
|---|
| 89 | 89 | Towards cost and supply of Cutting andf threading charges for GI Pipe etc complete | | 184 | Rm |
|---|
| 90 | 90 | Provision for FHTC | | 83 | Nos |
|---|
| 91 | 91 | Provision of Tap connection for Govt buildings | | 1 | Nos |
|---|
| 92 | 92 | Provision for Name Board | | 1 | Hr |
|---|
| 93 | 93 | NAME OF WORK :Providing 97 Nos FHTC To Pullamuthur village in Sathangudi Panchayat in Thirumangalam block in Madurai District | | | |
|---|
| 94 | 94 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers (Measurement as per Surveying Data with reference to Drawings) | | 66.15 | Cum |
|---|
| 95 | 95 | Provision for Labour Charges for Laying of Pipes | | | |
|---|
| 96 | 96 | Bore to OHT 90 mm dia Pvc Pipe | | 45 | Rm |
|---|
| 97 | 97 | Pumbing Line63 mm dia Pvc Pipe | | 60 | Rm |
|---|
| 98 | 98 | 50mm GI Pipe | | 825 | Rm |
|---|
| 99 | 99 | Supply of Following pipes and Materials including all cost etc complete | | | |
|---|
| 100 | 100 | 63mm PVC pipe 6KSC Main Line | | 45 | Rm |
|---|
| 101 | 101 | 90mm PVC pipe 6KSC Main Line | | 60 | Rm |
|---|
| 102 | 102 | 50mm GI Pipe | | 825 | Rm |
|---|
| 103 | 103 | 50mm GI Coupling | | 137.5 | Nos |
|---|
| 104 | 104 | 50 mm GI Tee | | 10 | Nos |
|---|
| 105 | 105 | 50mm Gate Valve | | 6 | Nos |
|---|
| 106 | 106 | 50mm GI Elbow | | 16 | Nos |
|---|
| 107 | 107 | 50mm GI Bend | | 6 | Nos |
|---|
| 108 | 108 | 50 mm GI Union | | 12 | Nos |
|---|
| 109 | 109 | Watermetre | | 3 | Nos |
|---|
| 110 | 110 | Earth work excavation in all clauses of soil as per SS20B. | | | |
|---|
| 111 | 111 | Refilling with excavated eartfilling inculding all labour charges for etc complete | | 66.15 | Cum |
|---|
| 112 | 112 | Towards cost and supply of Cutting andf threading charges for GI Pipe etc complete | | 188 | Rm |
|---|
| 113 | 113 | Provision for FHTC | | 97 | Nos |
|---|
| 114 | 114 | Provision for Name Board | | 1 | Hr |
|---|
| 115 | 115 | NAME OF WORK :Providing 90 Nos FHTC To Puliyur village in Sathangudi Panchayat in Thirumangalam block in Madurai District | | | |
|---|
| 116 | 116 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers (Measurement as per Surveying Data with reference to Drawings) | | 135 | Cum |
|---|
| 117 | 117 | Provision for Labour Charges for Laying of Pipes | | | |
|---|
| 118 | 118 | Bore to OHT 90 mm dia Pvc Pipe | | 90 | Rm |
|---|
| 119 | 119 | Pumbing Line63 mm dia Pvc Pipe | | 125 | Rm |
|---|
| 120 | 120 | 50mm GI Pipe | | 670 | Rm |
|---|
| 121 | 121 | Supply of Following pipes and Materials including all cost etc complete | | | |
|---|
| 122 | 122 | 63mm PVC pipe 6KSC Main Line | | 90 | Rm |
|---|
| 123 | 123 | 90mm PVC pipe 6KSC Main Line | | 125 | Rm |
|---|
| 124 | 124 | 50mm GI Pipe | | 670 | Rm |
|---|
| 125 | 125 | 50mm GI Coupling | | 111.67 | Nos |
|---|
| 126 | 126 | 50 mm GI Tee | | 12 | Nos |
|---|
| 127 | 127 | 50mm Gate Valve | | 4 | Nos |
|---|
| 128 | 128 | 50mm GI Elbow | | 10 | Nos |
|---|
| 129 | 129 | 50mm GI Bend | | 4 | Nos |
|---|
| 130 | 130 | 50 mm GI Union | | 8 | Nos |
|---|
| 131 | 131 | Watermetre | | 3 | Nos |
|---|
| 132 | 132 | Earth work excavation in all clauses of soil as per SS20B. | | | |
|---|
| 133 | 133 | Refilling with excavated eartfilling inculding all labour charges for etc complete | | 135.45 | Cum |
|---|
| 134 | 134 | Towards cost and supply of Cutting andf threading charges for GI Pipe etc complete | | 150 | Rm |
|---|
| 135 | 135 | Provision for FHTC | | 90 | Nos |
|---|
| 136 | 136 | Provision of Tap connection for Govt buildings | | 1 | Nos |
|---|
| 137 | 137 | Provision for Name Board | | 1 | Hr |
|---|
| 138 | 138 | NAME OF WORK : Providing 18 Nos FHTC To Aarapalayam village in Sathangudi Panchayat in Thirumangalam block in Madurai District | | | |
|---|
| 139 | 139 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers (Measurement as per Surveying Data with reference to Drawings) | | 27.72 | Cum |
|---|
| 140 | 140 | Provision for Labour Charges for Laying of Pipes | | | |
|---|
| 141 | 141 | Bore to OHT 90 mm dia Pvc Pipe | | 24 | Rm |
|---|
| 142 | 142 | Pumbing Line63 mm dia Pvc Pipe | | 20 | Rm |
|---|
| 143 | 143 | 50mm GI Pipe | | 96 | Rm |
|---|
| 144 | 144 | Supply of Following pipes and Materials including all cost etc complete | | | |
|---|
| 145 | 145 | 63mm PVC pipe 6KSC Main Line | | 24 | Rm |
|---|
| 146 | 146 | 90mm PVC pipe 6KSC Main Line | | 20 | Rm |
|---|
| 147 | 147 | 50mm GI Pipe | | 96 | Rm |
|---|
| 148 | 148 | 50mm GI Coupling | | 16 | Nos |
|---|
| 149 | 149 | 50 mm GI Tee | | 4 | Nos |
|---|
| 150 | 150 | 50mm Gate Valve | | 2 | Nos |
|---|
| 151 | 151 | 50mm GI Elbow | | 4 | Nos |
|---|
| 152 | 152 | 50mm GI Bend | | 2 | Nos |
|---|
| 153 | 153 | 50 mm GI Union | | 3 | Nos |
|---|
| 154 | 154 | Watermetre | | 2 | Nos |
|---|
| 155 | 155 | Earth work excavation in all clauses of soil as per SS20B. | | | |
|---|
| 156 | 156 | Refilling with excavated eartfilling inculding all labour charges for etc complete | | 27.72 | Cum |
|---|
| 157 | 157 | Towards cost and supply of Cutting andf threading charges for GI Pipe etc complete | | 24 | Rm |
|---|
| 158 | 158 | Provision for FHTC | | 18 | Nos |
|---|
| 159 | 159 | Provision for Name Board | | 1 | Hr |
|---|
| 160 | 160 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}\n | BI01010001010000000000000515BI01000011120 | 1 | GST Amount (in Rupees) |
|---|