Schedule 1-PART A MS P Way Items for the work of:- Misc P.Way Work under\rSSE/PW/URI section under ADEN/DD.
14171178.17
Above/\rBelow/Par
2
1
061011
550.00
Running\rMetre
11.13
6121.50
AT Par
6121.50
3
Description:- Pulling & positioning of rails accurately on cess including supporting rails, providing required gap\rand squaring at ends for renewal preparation, as directed by Engineer in-charge Upto 40 m long rail panel
4
2
061012
2000.00
Running\rMetre
16.75
33500.00
AT Par
33500.00
5
Description:- Pulling & positioning of rails accurately on cess including supporting rails, providing required gap\rand squaring at ends for renewal preparation, as directed by Engineer in-charge More than 40 m long rail panel
6
3
061013
125.00
Running\rMetre
6.52
815.00
AT Par
815.00
7
Description:- Pulling & positioning of rails accurately on cess including supporting rails, providing required gap\rand squaring at ends for renewal preparation, as directed by Engineer in-charge Extra to Item no. 061011 for\rworking on bridge
8
4
061021
2000.00
Running\rMetre
36.92
73840.00
AT Par
73840.00
9
Description:- Removing rail of all types & length from track, laid on any type & density of sleeper by removing fish\rplates, fastenings & fish bolts and other materials alongwith keeping released rail and all materials safely on cess,\ras directed by Engineer in-charge. (cutting & drilling of rail shall be paid separately and work to be done under\rtraffic block & Railway's supervision) BG Track - For Through Renewal work
10
5
061023
550.00
Running\rMetre
55.51
30530.50
AT Par
30530.50
11
Description:- Removing rail of all types & length from track, laid on any type & density of sleeper by removing fish\rplates, fastenings & fish bolts and other materials alongwith keeping released rail and all materials safely on cess,\ras directed by Engineer in-charge. (cutting & drilling of rail shall be paid separately and work to be done under\rtraffic block & Railway's supervision) BG Track - For Casual/Scattered Renewal work
12
6
061031
1000.00
Track\rmetre
77.16
77160.00
AT Par
77160.00
13
Description:- Insertion of rails of all types & length in track, laid on any type & density of sleeper to the specified\rgauge. Rates include fastening of rail with sleepers with standard set of fastenings and fixing of fish plates and\rbolts or, if required, providing gap for welding. (drilling and cutting of rail to be paid separately) BG Track - For\rThrough Renewal work
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.