| 1 | 1 | Main Building Civil Works | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 2 | Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt. (100 fts) from the foundation trenches. | BI01010001010000000000000515BI0100001113 | 311.06 | CUM |
|---|
| 3 | 3 | Filling of carted earth. | BI01010001010000000000000515BI0100001114 | 1195.36 | CUM |
|---|
| 4 | 4 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 kms. from the site of work and including watering, dressing etc rate to include cost of all materials labour T & P etc required for proper completion of work. | BI01010001010000000000000515BI0100001115 | 125.37 | CUM |
|---|
| 5 | 5 | Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. | BI01010001010000000000000515BI0100001116 | 41.31 | CUM |
|---|
| 6 | 6 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and around the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete (plinth area of the building at ground.floor only shall be measured as per I.S.6313(PartII 1981)Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (1)Treatment for masonary & foundation 5 liters per sqm. (2) Back fill in immediate contact with foundation 7.5 liters/sqm (3) Treatment of top surface of plinth filling 5 liters/sqm (4) Treatment of soil along external perimeter of building 7.5 liters/sqm. (5) Treatment of soil under apron along external perimter 5 liters/sqm. | BI01010001010000000000000515BI0100001117 | 804.08 | SQM |
|---|
| 7 | 7 | M-150 brick work in 1:6 (one cement and six coarse sand of 2.25 fineness modulus) mortar in foundation & plinth including supply of all materials, labour and T & P etc required for proper completion of the work. | BI01010001010000000000000515BI0100001118 | 127.23 | CUM |
|---|
| 8 | 8 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate\n12.5mm nominal size) | BI01010001010000000000000515BI0100001119 | 38.26 | SQM |
|---|
| 9 | 9 | Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil. | BI01010001010000000000000515BI0100001120 | 38.26 | SQM |
|---|
| 10 | 10 | Brick work in super-structure above plinth level up to floor two level (up to two storeys) including necessary cutting and moulding of bricks as required and also including honey comb brick work thickness of wall not to be less than 1.5 brick thick. (1:6 cement & coarse sand) | BI01010001010000000000000515BI0100001121 | | |
|---|
| 11 | 11 | Ground Floor | BI01010001010000000000000515BI0100001122 | 105.71 | CUM |
|---|
| 12 | 12 | First Floor | BI01010001010000000000000515BI0100001123 | 92.77 | CUM |
|---|
| 13 | 13 | Same as in item no. 9 but in 1:4 cement and coarse sand mortar in superstructure for wall thickness 12 cms & below brick work. | BI01010001010000000000000515BI0100001113 | | |
|---|
| 14 | 14 | Ground Floor | BI01010001010000000000000515BI0100001114 | 2.86 | CUM |
|---|
| 15 | 15 | First Floor | BI01010001010000000000000515BI0100001115 | 5.68 | CUM |
|---|
| 16 | 16 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3 in FOOTING excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. strength of the concrete shall not beless than M-20. | BI01010001010000000000000515BI0100001116 | 92.8 | CUM |
|---|
| 17 | 17 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3 in BEAM excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. strength of the concrete shall not beless than M-20. | BI01010001010000000000000515BI0100001117 | 46.2 | CUM |
|---|
| 18 | 18 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3 in lintels of doors and windows excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. strength of the concrete shall not beless than M-200. | BI01010001010000000000000515BI0100001118 | 6.51 | CUM |
|---|
| 19 | 19 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3 in COLUMN excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. strength of the concrete shall not beless than M-20. | BI01010001010000000000000515BI0100001119 | 57.3 | CUM |
|---|
| 20 | 20 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3 in SLAB excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. strength of the concrete shall not beless than M-20. | BI01010001010000000000000515BI0100001120 | 40.88 | CUM |
|---|
| 21 | 21 | P/F Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. | BI01010001010000000000000515BI0100001121 | 389.38 | QTL. |
|---|
| 22 | 22 | Plinth plaster 15 mm cement plaster on rough side of single or half brick wall of mix: (1 cement :4 coarse sand) | BI01010001010000000000000515BI0100001122 | 58.32 | SQM |
|---|
| 23 | 23 | 15 mm cement plaster (Interior surface) in single coat on rough side of single or half brick wall for interior plastering up to floor two level including internal rounded angles not exceeding 80 mm in girth and finshed even and smooth. (1) 1 cement : 6 fine sand | BI01010001010000000000000515BI0100001123 | | |
|---|
| 24 | 24 | Ground Floor | BI01010001010000000000000515BI0100001113 | 660.65 | SQM |
|---|
| 25 | 25 | 12mm cement plaster(outer side) in single coat on fair side of single or half brick wall for exterior plastering up to floor two level including internal rounded angles chamfers, and/or rounded angles not exceeding 80mm in girth and finished even and smooth no extra for mixing any additive. (1) 1 cement : 6 fine sand. (G.F.) | BI01010001010000000000000515BI0100001114 | 580.85 | SQM |
|---|
| 26 | 26 | Making grooves 10 to 12 X 12mm and upto 25 X 15 mm deep in plaster of the walls or in ceiling vertically or horizontally as required. (G.F.) | BI01010001010000000000000515BI0100001115 | 261.15 | RM |
|---|
| 27 | 27 | Mild steel or iron work of small sizes and sections such as holding down bolts, hold fast tierods,gratings etc. ( when not included in an over all rates) wrought to required from including supply of steel and its wastage including cost of bolts, nuts if required for and welding, grinding and making holes as required completion of work fabrication of holes doors, chaukhats nosing. | BI01010001010000000000000515BI0100001116 | | |
|---|
| 28 | 28 | Hold fast for chaukhats of doors/windows. | BI01010001010000000000000515BI0100001117 | 187.2 | KG |
|---|
| 29 | 29 | Door / windows & Staircase grill. | BI01010001010000000000000515BI0100001118 | 1303.95 | KG |
|---|
| 30 | 30 | Z-Section windows (Openable) | BI01010001010000000000000515BI0100001119 | 1629.95 | KG |
|---|
| 31 | 31 | Angle iron door chaukhat 40*40*5 | BI01010001010000000000000515BI0100001120 | 541.8 | KG |
|---|
| 32 | 32 | Fixing of Door, windows/ventilators chaukhats in position. | BI01010001010000000000000515BI0100001121 | | |
|---|
| 33 | 33 | (a) Door chaukhats | BI01010001010000000000000515BI0100001122 | 35 | NOS |
|---|
| 34 | 34 | (b) Window chaukhats | BI01010001010000000000000515BI0100001123 | 12 | NOS |
|---|
| 35 | 35 | (c) Ventilator chaukhats | BI01010001010000000000000515BI0100001113 | 27 | NOS |
|---|
| 36 | 36 | Boundary Wall (356.00 Mtr) | BI01010001010000000000000515BI0100001114 | | |
|---|
| 37 | 37 | Earth work in exacavation in trenches for foundations and for pipes cables etc. in ordinary soil(loam clay or sand)including lift upto 1.5 m and dressing of sides and ramming of bottom sand disposal of surplus excavated earth as directed by the Engineer i/c with in a lead of 50m. | BI01010001010000000000000515BI0100001115 | 252.05 | CUM |
|---|
| 38 | 38 | Providing and laying in cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) and curing complete,including cost of form-work,in foundation and floors. | BI01010001010000000000000515BI0100001116 | 32.75 | CUM |
|---|
| 39 | 39 | R.c.c. work with cement approved coarse sand and 2 cm. (3/4\") guage approved stone ballast in the proportion 1:1.5:3 in BEAM and windows excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc,required for proper completion of the works.strength of the concrete shall not be less than M-150. | BI01010001010000000000000515BI0100001117 | 33.46 | CUM |
|---|
| 40 | 40 | As in item 3 above but in R.C.C. columns in (Using 1:1.5:3 Mix concrete). | BI01010001010000000000000515BI0100001118 | 31.61 | CUM |
|---|
| 41 | 41 | R.c.c. work with cement approved coarse sand and 2 cm. (3/4\") guage approved stone ballast in the proportion 1:1.5:3 in foundation | BI01010001010000000000000515BI0100001119 | 42.29 | CUM |
|---|
| 42 | 42 | Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work bending for proper shap as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured. | BI01010001010000000000000515BI0100001120 | 147.81 | QTL. |
|---|
| 43 | 43 | M-150 Brick work inFoundation in 1:6 cement and coarse sand mortar necessary cutting & moulding of brick as required thickness of walls 115 mm thick. including supply of all material labour, Tools & Plants etc.required for proper completion of the work | BI01010001010000000000000515BI0100001121 | 55.82 | CUM |
|---|
| 44 | 44 | M-150 Brick work in Super Structure in 1:6 cement and coarse sand mortar necessary cutting & moulding of brick as required thickness of walls 115 mm thick. including supply of all material labour, Tools & Plants etc.required for proper completion of the work | BI01010001010000000000000515BI0100001122 | 63.23 | CUM |
|---|
| 45 | 45 | 12 mm cement plaster in single coat on fair side of single or half brick wall for interior plastering up to floor two level including internal rounded angles not exceeding 80 mm in girth and finshed even and smooth. (1)1 cement:6 fine sand 1.25 F.M. | BI01010001010000000000000515BI0100001123 | 1363.48 | SQM |
|---|
| 46 | 46 | Finishing walls with water-proofing on cement paint of approved make such as super snowcem,durrocem,robiacem,guttucem supercem quality and of required shade on undecorated wall surfaces (two coat) overone and including one coat white after thoroughly brushing the surface to powdered materials including curing and cost of all materials. | BI01010001010000000000000515BI0100001113 | 1441.8 | SQM |
|---|
| 47 | 47 | Mild steel or iron work in heavy sizes such as trusses built up gates, door frames, record racks, roof work gates etc. wrought to required from including supply of steel and its wastage including cost of bolts, nuts if required for and welding, grinding and making holes as required completion of work fabrication of holes doors, chaukhats nosing. | BI01010001010000000000000515BI0100001114 | 4363.85 | KG |
|---|
| 48 | 48 | Painting two coat over priming coat (but including cost of priming coat) on steel and other metal surfaces up to 10 cm. width or girth or small articles not exceeding 0.10sqm in area white superior synthetic enamel such as LUXOL3,Hi-gloss apcolite superlac, DULUX specified brushing to give an even shade and including cleaning the surface of all dirt,dust and other foreign matter sand papering and stoping including cost of all materials, labour tools and plants etc. required for proper completion of the work. | BI01010001010000000000000515BI0100001115 | 145.53 | SQM |
|---|
| 49 | 49 | M.S. Gate 6.00 Mtr Wide | BI01010001010000000000000515BI0100001116 | | |
|---|
| 50 | 50 | Earth work in exacavation in trenches for foundations and for pipes cables etc. in ordinary soil(loam clay or sand)including lift upto 1.5 m and dressing of sides and ramming of bottom sand disposal of surplus excavated earth as directed by the Engineer i/c with in a lead of 50m. | BI01010001010000000000000515BI0100001117 | 3.888 | CUM |
|---|
| 51 | 51 | Providing and laying in cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) and curing complete,including cost of form-work,in foundation and floors. | BI01010001010000000000000515BI0100001118 | 0.324 | CUM |
|---|
| 52 | 52 | R.c.c. work with cement approved coarse sand and 2 cm. (3/4\") guage approved stone ballast in the proportion 1:1.5:3 in BEAM and windows excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc,required for proper completion of the works.strength of the concrete shall not be less than M-150. | BI01010001010000000000000515BI0100001119 | 1.863 | CUM |
|---|
| 53 | 53 | As in item 3 above but in R.C.C. columns in (Using 1:1.5:3 Mix concrete). | BI01010001010000000000000515BI0100001120 | 1.62 | CUM |
|---|
| 54 | 54 | R.c.c. work with cement approved coarse sand and 2 cm. (3/4\") guage approved stone ballast in the proportion 1:1.5:3 in foundation | BI01010001010000000000000515BI0100001121 | 1.037 | CUM |
|---|
| 55 | 55 | Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work bending for proper shap as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured. | BI01010001010000000000000515BI0100001122 | 7.968 | QTL. |
|---|
| 56 | 56 | Mild steel or iron work in heavy sizes such as trusses built up gates, door frames, record racks, roof work gates etc. wrought to required from including supply of steel and its wastage including cost of bolts, nuts if required for and welding, grinding and making holes as required completion of work fabrication of holes doors, chaukhats nosing. | BI01010001010000000000000515BI0100001123 | 945 | KG |
|---|
| 57 | 57 | Painting two coat over priming coat (but including cost of priming coat) on steel and other metal surfaces up to 10 cm. width or girth or small articles not exceeding 0.10sqm in area white superior synthetic enamel such as LUXOL3,Hi-gloss apcolite superlac, DULUX specified brushing to give an even shade and including cleaning the surface of all dirt,dust and other foreign matter sand papering and stoping including cost of all materials, labour tools and plants etc. required for proper completion of the work. | BI01010001010000000000000515BI0100001113 | 25.2 | SQM |
|---|
| 58 | 58 | 12 mm cement plaster in single coat on fair side of single or half brick wall for interior plastering up to floor two level including internal rounded angles not exceeding 80 mm in girth and finshed even and smooth. (1)1 cement:6 fine sand 1.25 F.M. | BI01010001010000000000000515BI0100001114 | 29.85 | SQM |
|---|
| 59 | 59 | Finishing walls with water-proofing on cement paint of approved make such as super snowcem,durrocem,robiacem,guttucem supercem quality and of required shade on undecorated wall surfaces (two coat) overone and including one coat white after thoroughly brushing the surface to powdered materials including curing and cost of all materials. | BI01010001010000000000000515BI0100001115 | 29.85 | SQM |
|---|
| 60 | 60 | CONSTRUCTION OF TUBE WELL | BI01010001010000000000000515BI0100001116 | | |
|---|
| 61 | 61 | Drilling of 200 mm dia bore hole. | BI01010001010000000000000515BI0100001117 | 50 | metre |
|---|
| 62 | 62 | Supply of 125 mm dia MS pipe as per IS1239 | BI01010001010000000000000515BI0100001118 | 40 | metre |
|---|
| 63 | 63 | Supply of 125 mm dia slotted MS pipe | BI01010001010000000000000515BI0100001119 | 10 | metre |
|---|
| 64 | 64 | Supply and fixing of nylon jali around the slotted pipes complete as required. | BI01010001010000000000000515BI0100001120 | 1 | Job |
|---|
| 65 | 65 | Providing and packing of coarse sand / pea gravel around the pipe | BI01010001010000000000000515BI0100001121 | 1 | job |
|---|
| 66 | 66 | Transport of boring tools other required equipements and installation at site. | BI01010001010000000000000515BI0100001122 | 1 | Job |
|---|
| 67 | 67 | Supply of submersible pump of make KSB (Cora) for 200 lit/min | BI01010001010000000000000515BI0100001123 | 1 | Set |
|---|
| 68 | 68 | Providing 3 core PVC insulated submersible cable. (from pump panel to submersible pump) | BI01010001010000000000000515BI0100001113 | 40 | metre |
|---|
| 69 | 69 | Providing and fixing 65 mm dia. G.I. pipe complete with fittings and clamps including cutting and making good the wall etc. (from submersible pump to ground level) | BI01010001010000000000000515BI0100001114 | 40 | metre |
|---|
| 70 | 70 | Providing and fixing 65 mm dia. brass gate valve with CI wheel of approved quality. | BI01010001010000000000000515BI0100001115 | 1 | No |
|---|
| 71 | 71 | Lowering of 125 mm dia MS pipe in bore hole including cutting, jointing etc complete. | BI01010001010000000000000515BI0100001116 | 50 | metre |
|---|
| 72 | 72 | Supply and fixing of tube well accessories i.e. well cap, clips, clamps, etc. to complete the job in all respect. | BI01010001010000000000000515BI0100001117 | 1 | Job |
|---|
| 73 | 73 | Fixing, testing and commissioning for erection and lowering of submersible pump, 65 mm dia GI column pipe, 3 core submersible copper cable upto the control panel, supporting clamps, cable clips, pressure gauge, connection line and all other accessories required for the proper completion of the works | BI01010001010000000000000515BI0100001118 | 1 | Job |
|---|
| 74 | 74 | Testing and development of tube well. | BI01010001010000000000000515BI0100001119 | 1 | Job |
|---|
| 75 | 75 | Testing and development of tube well. | BI01010001010000000000000515BI0100001120 | 1 | Nos |
|---|
| 76 | 76 | G.S.T. will be paid extra as per applicable against G.S.T. notification. | BI01010001010000000000000515BI0100001129 | | |
|---|