| 1 | 1 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. | | 261 | CUM |
|---|
| 2 | 2 | Supplying trap/granite/quartzite /gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) \na)80 mm Metal, By breaking Boulders (Hand broken). | | 185.6 | CUM |
|---|
| 3 | 3 | Supplying trap/granite/quartzite /gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) \na)40 mm Metal, By breaking rubble obtained by blasting.(Hand broken). | | 87 | CUM |
|---|
| 4 | 4 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. | | 263.645 | CUM |
|---|
| 5 | 5 | Supplying soft murum/ kankar at the road site, including conveying and stacking complete. | | 28.971 | CUM |
|---|
| 6 | 6 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . | | 272.6 | SQM |
|---|
| 7 | 7 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete | | 292.16 | CUM |
|---|
| 8 | 8 | Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. | | 928 | SQM |
|---|
| 9 | 9 | Compacting the sub grade / gravel / size metal (100 mm loose) layers for all widths with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. | | 870 | SQM |
|---|
| 10 | 10 | Compacting the hard murum side widths including laying in layers on each side with power roller including artificial watering etc. complete. | | 1345.6 | SQM |
|---|
| 11 | 11 | Providing and fixing board displaying information, such as Name of work, Tender cost, Name of Contractor, Work completion and liability period etc., having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. | | 1 | NOS |
|---|
| 12 | 12 | ROYALTY CHARGES :- Supply of Rubble, Murum, Soil, 60mm./40mm. metal (Hand broken), royalty charges are not included in the rates.[As per Govt. of Maharashtra, Revenue and Forest Departments Gazette No.67 Dt.15 May,2015. States that the royalty charges of Rs.141.34/Cu.M. ) are considered. The surcharge levied on Royalty shall also be payable to the contractor. | | 565.216 | CUM |
|---|
| 13 | 13 | Laboratory testing charges are not considered in the Rate Abstracts. Where ever required separate item shall be taken in the estimate for material testing charges, on the basis of testing frequency and charges fixed by Vigilance & Quality Control Circle, for the current year and shall form part of tender. testing of material by Quality control and certified quality must be use by contractor. | | 0.01 | CUM |
|---|
| 14 | 14 | water absorption, Specific Gravity, Impact Value, crushing Value | | 1 | NOS |
|---|
| 15 | 15 | Sieve Analysis | | 1 | NOS |
|---|
| 16 | 16 | MURUM HARD Liquid Limit & Plastic Limit | | 1 | NOS |
|---|