Construction Of Cable Trench Construction Of Cable Trench For Sub-Station And Pcc Work Inside Compound Wall At Bilbera Near Old State Bank Under Govindpur Area, Govindpur Area-Jharkhand
TDR : 25024851
Tender Notice
BOQ
Expired
Govindpur Area
Jharkhand
Construction Of Cable Trench Construction Of Cable Trench For Sub-Station And Pcc Work Inside Compound Wall At Bilbera Near Old State Bank Under Govindpur Area
Name of Work: Construction of cable trench for sub-station & PCC work inside compound wall at Bilbera near old state bank under Govindpur Area
Sl.No.
Item Description
Item Code / Make
Quantity
Units
1
1
Earth work in excavation by mechanical means (Hydraulic excavator) /\nmanual means in foundation trenches or drains (not exceeding 1.5 m in\nwidth or 10 sqm on plan), including dressing of sides and ramming of\nbottoms, lift upto 1.5 m, including getting out the excavated soil and\ndisposal of surplus excavated soil as directed, within a lead of 50 m.\n All kinds of soil.
51.81
cum
2
2
Providing and laying in position cement concrete of specified grade\nexcluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4 fine sand : 8 graded stone aggregate 40 mm nominal size)
8.54
cum
3
3
Brick work with FPS bricks of class designation 50 in foundation and plinth using cement mortar 1:6 (1 cement : 6 fine sand).
22.67
cum
4
4
12 mm cement plaster finished with a floating coat of neat cement\nof mix : 1:4 (1 cement: 4 fine sand)
141.72
sqm
5
5
25 mm cement plaster finished with a floating coat of neat cement of mix 1:4.
42.51
sqm
6
6
Providing, hoisting and fixing up to floor five level precast reinforced cement\nconcrete work in string courses, bands, copings, bed plates, anchor\nblocks, plain window sills and the like, including the cost of required\ncentering, shuttering but excluding cost of reinforcement, with 1:2:4 (1\ncement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size).
6.47
cum
7
7
Steel reinforcement for R.C.C. work including straightening, cutting,\nbending, placing in position and binding all complete upto plinth level. Cold twisted bars
453
Kg
8
8
Dry brick on edge soling.
153.34
sqm
9
9
Providing and laying in position cement concrete of specified grade\nexcluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
7.47
cum
10
10
Centering and shuttering including strutting, propping etc. and removal\nof form for : Suspende.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.