| 1 | 1 | Sensors | | | |
|---|
| 2 | 1.01 | Wind sensor for wind direction | | 78 | Nos |
|---|
| 3 | 1.02 | Wind sensor for wind speed | | 78 | Nos |
|---|
| 4 | 1.03 | Wind installation support accessories | | 78 | Nos |
|---|
| 5 | 1.04 | Temperature & Humidity sensor with radiation shield and installation support accessories | | 52 | Nos |
|---|
| 6 | 1.05 | High precision pressure transducers for reporting QFE/QNH values | | 52 | Nos |
|---|
| 7 | 1.06 | System for measurement of Visibility/MOR and Runway Visual Range as per ICAO requirements including Back ground Luminance Sensor | | 54 | Sets |
|---|
| 8 | 1.07 | Laser ceilometer as per specifications | | 26 | Nos |
|---|
| 9 | 1.08 | Present weather sensors | | 52 | Nos |
|---|
| 10 | 2 | Mast and accessories: | | | |
|---|
| 11 | 2.01 | 10m frangible wind mast (tiltable) | | 78 | Nos |
|---|
| 12 | 2.02 | Lightning arrestor | | 78 | Nos |
|---|
| 13 | 2.03 | Obstruction light | | 78 | Nos |
|---|
| 14 | 2.04 | Weatherproof termination boxes both for power supply and signal termination | | 78 | Nos |
|---|
| 15 | 2.05 | Weather proof termination box with battery & battery charger of suitable capacity for supply of power to Data logger, Wind, Temperature & humidity, pressure sensors and communication Modem for 24 hrs | | 78 | Nos |
|---|
| 16 | 3 | Data Acquisition System (DAS): | | | |
|---|
| 17 | 3.01 | DAS | | 78 | Nos |
|---|
| 18 | 3.02 | Battery back-up facility for DAS and all sensors (Except RVR) For 24hrs or better | | 78 | Sets |
|---|
| 19 | 3.03 | GPS receiver | | 36 | Nos |
|---|
| 20 | 3.04 | Comprehensive Surge protection Systems for protection of all AWOS sensors/ Units/ Sub units. | | 78 | Sets |
|---|
| 21 | 4 | Data processing & integration Unit (MBR Site): | | | |
|---|
| 22 | 4.01 | Rack mountable dual server computer | | 18 | Sets |
|---|
| 23 | 4.02 | Licensed Operating system | | 18 | Sets |
|---|
| 24 | 4.03 | Battery Powered Data processor & Integrator (BPDPI) | | 18 | Sets |
|---|
| 25 | 4.04 | Color display 21” Flat panel | | 18 | Sets |
|---|
| 26 | 4.05 | Over-voltage protection kit | | 18 | Sets |
|---|
| 27 | 4.06 | Mains Power distribution board | | 18 | Sets |
|---|
| 28 | 4.07 | Online UPS for both servers | | 18 | Sets |
|---|
| 29 | 5 | Workstations | | | |
|---|
| 30 | 5.01 | Workstations | | 72 | Nos |
|---|
| 31 | 5.02 | Colour display 24” LED type | | 72 | Nos |
|---|
| 32 | 5.03 | UPS | | 72 | Nos |
|---|
| 33 | 6 | Slave Display Units | | | |
|---|
| 34 | 6.01 | Wireless router for 300 mts with Battery backup for 30min. | | 90 | Nos |
|---|
| 35 | 6.02 | 10.1” or better touch screen Tablet PC with 30min battery backup facility | | 180 | Nos |
|---|
| 36 | 6.03 | 42-inch LED Display with zoom control facility for display of single or Multiple runway data as per user selection | | 72 | Nos |
|---|
| 37 | 6.04 | 42-inch Slave display for passenger lounge | | 36 | Nos |
|---|
| 38 | 7 | Central web server at Pune & Delhi with static IP and its software for viewing & downloading Air-port data from 18 airports. | | 2 | Nos |
|---|
| 39 | 8 | Multi-functional Device (MFD) | | | |
|---|
| 40 | 8.01 | Printer-Fax-Scanner | | 18 | Nos |
|---|
| 41 | 8.02 | Heavy duty black &white laser printer | | 18 | Nos |
|---|
| 42 | 9 | Licenses and Documentation | | | |
|---|
| 43 | 9.01 | All licensed (system and application) software with License Nos. and CD’s including web-based monitoring and remote maintenance and virus protection software | | 18 | Sets |
|---|
| 44 | 9.02 | Documentation (Installation, operation and maintenance manual) and softcopy for all the manuals | | 18 | Set Each |
|---|
| 45 | 10 | Communication | | | |
|---|
| 46 | 10.01 | Wireless modems (License free band) for data communication between AMI sites to ATC and MBR | | 78 | Pairs |
|---|
| 47 | 10.02 | Land Line Modems/ Suitable Media convertor for data communication through OFC between AMI sites to ATC and MBR | | 78 | Pairs |
|---|
| 48 | 10.03 | 24 port Ethernet Switch | | 18 | Pairs |
|---|
| 49 | 10.04 | LAN Extender | | 18 | Pairs |
|---|
| 50 | 11 | Services | | | |
|---|
| 51 | 11.01 | Construction of RCC platform on hard soil with foundation grouting of templates for erection of Frangible and foldable 10mts Wind mast as per standards and installation of wind mast. | | 78 | Sites |
|---|
| 52 | 11.02 | Installation of Comprehensive Lightning & Surge Protection Systems for protection of all AWOS sensors/Units and Sub systems at Two sites of Runway (as per Annexure-I of RFP). | | 78 | Sites |
|---|
| 53 | 11.03 | Installations of maintenance free Earth Pits (Signal, Power & Lightning) including all required copper cables for protection of complete field system from Lightning and Power Surges. | | 78 | Sites |
|---|
| 54 | 11.04 | Outdoor cabling for both AMI sites. Underground Armored Twisted pair cable is to be used for Integration of RVR with DAS | | 1800 | Airports |
|---|
| 55 | 11.05 | Indoor cabling works for the installation of communication systems, Servers, work stations, Wireless Router Etc. | | 1800 | Airports |
|---|
| 56 | 12 | Integration & Commissioning of total AWOS | | 18 | Airports |
|---|
| 57 | 12.01 | Project implementation cost for providing the turn key solution. | | 18 | Airports |
|---|
| 58 | 12.02 | Local transportation cost for delivering equipment at airport | | 18 | Airports |
|---|
| 59 | 12.03 | Onsite training of IMD officials at each airport as per Para 7.4. | | 18 | Airports |
|---|
| 60 | 12.04 | Site Acceptance Test (Para 7.5.2) | | 18 | Airports |
|---|
| 61 | 12.05 | All expenses for Factory Acceptance for 18 systems for Five officials at OEM place for 15 days including their Travel & per diem | | 1 | Item |
|---|
| 62 | 12.06 | Charges for Two Year extended Warranty (Normal one year + 2 Year extended) | | 18 | Airports |
|---|
| 63 | 13 | Comprehensive Annual Maintenance Contract | | | |
|---|
| 64 | 13.01 | Charges for 1st Year Comprehensive Annual Maintenance contract (CAMC) | | 18 | Airports |
|---|
| 65 | 13.02 | Charges for 2nd Year CAMC | | 18 | Airports |
|---|
| 66 | 13.03 | Charges for 3rd Year CAMC | | 18 | Airports |
|---|
| 67 | 13.04 | Charges for 4th Year CAMC | | 18 | Airports |
|---|
| 68 | 13.05 | Charges for 5th Year CAMC | | 18 | Airports |
|---|