| 1 | 1 | Pipe Line Extension and FHTC Work | | | |
|---|
| 2 | 1.1 | Excavation of earth in ordinary soil (loam, clay or sand) for pipe line trenches including lift upto 1.50 m and lead upto 50 m and refilling watering, ramming of the excavated earth into the trench and also disposal of surplus earth upto 50m from the center of the trenches including supply of all material labour, T&P etc complete as per instructions of Engineer -in -charge. | BI01010001010000000000000515BI0100001130 | 2213.84 | Cum |
|---|
| 3 | 1.2 | Supply of following sizes DI K-7 pipe/ PVC Pipe of 6 kg/Sq.cm for distribution system conforming to latest/ relevant I.S. Specifications with all jointing materials and specials conforming to latest /relevant I.S. specifications including F.O.R. destination and all taxes and insurance etc. with loading, unloading and Carting up to site of work, also including specials for these pipes and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete (including testing of pipe lines and cutting of pipes for making up the length but excluding the cost of trenches) all complete as per instructions of Engineer -in -charge. | BI01010001010000000000000515BI0100001131 | | |
|---|
| 4 | 1.21 | 150 MM DIA DIK-7 PIPE | BI01010001010000000000000515BI0100001132 | 150 | Rmt |
|---|
| 5 | 1.22 | 90 MM DIA PVC PIPE 6kg/cm2 | BI01010001010000000000000515BI0100001133 | 350 | Rmt |
|---|
| 6 | 1.23 | 75 MM DIA PVC PIPE 6kg/cm2 | BI01010001010000000000000515BI0100001134 | 100 | Rmt |
|---|
| 7 | 1.24 | 63 MM DIA PVC PIPE 6kg/cm2 | BI01010001010000000000000515BI0100001135 | 2500 | Rmt |
|---|
| 8 | 1.3 | Supply and carting up to site of work of the following dia C.I. butterfly /sluice valves, scour valves class I, working pressure 10 Kg/cm2 confirming to IS: 780/1969 or its latest amendments, F.O.R. destination, and lowering them into the already prepared trenches, fixing in position and jointing them with pipelines and testing etc. complete and also including supply of jointing materials etc. complete .including all taxes and insurance, as per instructions of Engineer -in -charge. | BI01010001010000000000000515BI0100001136 | | |
|---|
| 9 | 1.31 | SLUICE VALVE- 150 MM DIA | BI01010001010000000000000515BI0100001137 | 1 | Nos |
|---|
| 10 | 1.32 | SLUICE VALVE- 80 MM DIA | BI01010001010000000000000515BI0100001138 | 1 | Nos |
|---|
| 11 | 1.33 | SLUICE VALVE- 50 MM DIA | BI01010001010000000000000515BI0100001139 | 3 | Nos |
|---|
| 12 | 1.4 | Supply of under ground sluice value type fire hydrant consisting of 80 mm dia sluice valve,80mm dia tail pieces, 80mm dia duck foot bend and 63 mm dia standard makes iron coupling with cap and etc. complete conforming to latest/relevent I.S.specifications including all taxes and insurance up to site of work and lowering them into the trenches, fixing in position and jointing them with pipelines and testing etc. complete (including supply of jointing materials etc. complete as per instructions of Engineer -in -charge. | BI01010001010000000000000515BI0100001140 | 1 | Nos |
|---|
| 13 | 1.5 | Construction of following type chambers as per department type design and drawing including Heavy duty M.S. Manhole Cover and all materials, labour, T&P etc complete for proper completion of work as per instructions of Engineer -in -charge. | BI01010001010000000000000515BI0100001141 | | |
|---|
| 14 | 1.51 | Sluice valve chamber (masonry Type) | BI01010001010000000000000515BI0100001142 | 1 | Nos |
|---|
| 15 | 1.52 | Sluice valve chamber (surface box Type) | BI01010001010000000000000515BI0100001143 | 4 | Nos |
|---|
| 16 | 1.53 | Fire Hydrant chamber | BI01010001010000000000000515BI0100001144 | 1 | Nos |
|---|
| 17 | 1.6 | Dismantling of Following type of surfaces including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto a distance of 50m as per instructions of Engineer -in -charge. | BI01010001010000000000000515BI0100001145 | | |
|---|
| 18 | 1.61 | Bituminous surface | BI01010001010000000000000515BI0100001146 | 248 | Sqm |
|---|
| 19 | 1.62 | C.C. surface | BI01010001010000000000000515BI0100001147 | 680 | Sqm |
|---|
| 20 | 1.63 | B.O.E. surface | BI01010001010000000000000515BI0100001148 | 528 | Sqm |
|---|
| 21 | 1.64 | Interlocking Roads | BI01010001010000000000000515BI0100001149 | 229 | Sqm |
|---|
| 22 | 1.7 | Reinstatement of the following type of road surface with old and new materials including supply of all materials, labour, T&P etc. required for proper completion of the work as per instructions of Engineer -in -charge. | BI01010001010000000000000515BI0100001150 | | |
|---|
| 23 | 1.71 | Bituminous surface | BI01010001010000000000000515BI0100001151 | 248 | Sqm |
|---|
| 24 | 1.72 | C.C.. Surface (10cm thick P.C.C.1:2:4 with cement, course sand, 20mm stone ballast over 7.5cm thick 1:4:8 PCC cement, local sand & 40mm brick ballast) | BI01010001010000000000000515BI0100001152 | 680 | Sqm |
|---|
| 25 | 1.73 | B.O.E. surface | BI01010001010000000000000515BI0100001153 | 528 | Sqm |
|---|
| 26 | 1.74 | Interlocing Roads (including 1:6:12 base concrete 75mm thick) | BI01010001010000000000000515BI0100001154 | 229 | Sqm |
|---|
| 27 | 1.8 | Provision for following types of Culvert crossing / trench less road crossing as per departmental type design and drawing including shifting of telephone cables etc. along the alignment of pipe line including supply of D.I. / MS /GI casing pipes and specials, and their laying and jointing testing etc. complete as per instructions of Engineer -in -charge. | BI01010001010000000000000515BI0100001155 | | |
|---|
| 28 | 1.81 | Road crossing | BI01010001010000000000000515BI0100001156 | 60 | mtr |
|---|
| 29 | 1.82 | Culvert crossing | BI01010001010000000000000515BI0100001157 | 20 | mtr |
|---|
| 30 | 1.83 | Inter-connection in proposed new pipeline with existing pipe including excavation of trenches, supply of all materials, specials, labour T&P bailing out of water etc complete. | BI01010001010000000000000515BI0100001158 | 6 | Job |
|---|
| 31 | 1.84 | Repairing of leakage in existing pipe line including excavation of trenches, bailing out of water, refilling of the excavated earth into the trenches watering ramming dressing- leveling including supply of all materials, specials, labour T&P etc complete for proper complition of work. | BI01010001010000000000000515BI0100001159 | | |
|---|
| 32 | 1.85 | In 63mm to 90mm dia pipe line | BI01010001010000000000000515BI0100001160 | 25 | Nos |
|---|
| 33 | 1.86 | In 110mm to 200 mm dia pipe line | BI01010001010000000000000515BI0100001161 | 10 | Nos |
|---|
| 34 | 1.9 | House Connection work\nMaking house connection with 20 MM (O.D.) HPDE pipe (PE-80) (average length will be 10m) in existing PVC/HDPE/AC/DI distribution line including cost of Brass ferrule, saddle, wheel valve and 15 mm dia medium class G.I. Pipe ( 1.35 meter ) including all G.I. specials as nipple, socket, elbow etc. with heavy duty C.I.Bib Cock with brass spindle including fixing on wall with bracket/fixing with concrete block 20cmX20cmX40cm in M-20 grade incuding all Labour, T&P etc. complete as per departmental type drawing and design ( drawing D-12 attached ). | BI01010001010000000000000515BI0100001162 | | |
|---|
| 35 | 1.91 | In 63mm to 140mm dia pipe line | BI01010001010000000000000515BI0100001163 | 742 | Nos |
|---|
| 36 | 1.92 | In 160mm to 300 mm dia pipe line | BI01010001010000000000000515BI0100001164 | 150 | Nos |
|---|
| 37 | 1.94 | Construction of single tap pillar type stand post as per type design as per instructions of Engineer -in -charge , the work also includes painting of the post with blue colour oil paint with numbering of the standpost. (For Water Works campus only) | BI01010001010000000000000515BI0100001165 | 1 | Nos |
|---|
| 38 | 1.95 | Painting of the single tap pillar type stand post with blue colour oil paint with numbering of the standpost as per instructions of Engineer -in -charge including all labour, material T&P etc Complete. | BI01010001010000000000000515BI0100001166 | 10 | Nos |
|---|
| 39 | 1.96 | Repairing of single tap pillar type stand post as per instructions of Engineer -in -charge including repairing of platform, piller, C.I. bibcock, all labour, material T&P etc Complete, the work also includes painting of the post with blue colour oil paint with numbering of the standpost. | BI01010001010000000000000515BI0100001167 | 15 | Nos |
|---|
| 40 | 2 | Renovation of OHT | BI01010001010000000000000515BI0100001168 | | |
|---|
| 41 | 2.1 | Painting of all concrete surface and steel pipe works with three coats of asian brand Apex paint and anticorrosive paints as per specifications given in the bid document of 250kl/12m OHT, including scraching the old paint, rapairing & painting G.I. railing, railing post, Repairing or fixing of Lighiting conducter, repairing/ replacment of M.S. ladder, supply & fixing of new autumatic water lavel indicator, ventilater mess, including supply of all material, labour and T&P etc complete including necessary treatment of water container for dampness, Cleaning and washing work innner side of OHT, repairing of sluice valve chmaber and its R.C.C. cover including of labour and T&P etc required for proper completion of the work. | BI01010001010000000000000515BI0100001169 | 1 | Job |
|---|
| 42 | 2.2 | Supply and fixing of 14 mm gauge M.S. sheet door at the first flight of stair case of 2.00 height with cage inculding all necessary fitting, all material T&P etc complete for proper completion of work as per direction of engineer incharge. | BI01010001010000000000000515BI0100001170 | 105 | kg |
|---|
| 43 | 2.3 | 40 mm thick 1:2:4 plain cement concrete floor with cement coarse sand and 20mm gauge stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio 1:5 as specified over and removing any overlapping or motar at the joints of panels if any and giving them uniform finish including supply of all materials labour and T&P etc required for proper completion of the work.(with repairing of base concrete) | BI01010001010000000000000515BI0100001171 | 25 | m2 |
|---|
| 44 | 2.4 | 40 mm thick 1:2:4 plain cement concrete floor with cement coarse sand and 20mm gauge stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio 1:5 as specified over including 75mm thick base concrete consisting of cement, local sand and 1st class brick ballast 40mm gauge in the proportion of 1:4:8 and removing any overlapping or mortar at joints of panels any and giving them uniform finish including supply of all materials labour and T&P etc. Required for proper completion of the work. (For 1.00m wide appron) | BI01010001010000000000000515BI0100001172 | 40 | m2 |
|---|
| 45 | 3 | Renovation of Pump House | BI01010001010000000000000515BI0100001173 | | |
|---|
| 46 | 3.1 | 25mm thick 1:2:4 plain cement concrete floor with cement coarse sand and 20mm gauge stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio 1:5 as specified over . (for floor & appron with repairing of base concrete) | BI01010001010000000000000515BI0100001174 | 12 | m2 |
|---|
| 47 | 3.2 | Painting or varnishing on new/ old iron work in small or old wood work with one coat priming and two coat of approved paint or varnish Including scratching of old paint, including supply of all materials, labour and T&P etc. Required for proper completion of the work | BI01010001010000000000000515BI0100001175 | 28 | m2 |
|---|
| 48 | 3.21 | Finishing wall with apex weather proof emulsion of approved make and quality ( Asian brand ) over one priming coat on new work with two coats to give an even shade. Including repairing of plaster (approx 70% in 1:4 cement & local sand), scraping of old paint/ surface, preparation of surface with Birla wall putty including supply of all materials , labour T&P etc required for proper completion of the work as per direction of Engineer In-Charge. | BI01010001010000000000000515BI0100001176 | 115 | m2 |
|---|
| 49 | 3.22 | Finishing interior wall with oil bound distemper of approved make and quality ( Asian brand) over one priming coat on new work with two other coats to give an even shade. Including repairing of plaster (approx 70% in 1:4 cement & local sand), scraping of old paint/ surface, preparation of surface with Birla putty including supply of all materials , labour T&P etc required for proper completion of the work as per direction of Engineer In-Charge. . | BI01010001010000000000000515BI0100001177 | 100 | m2 |
|---|
| 50 | 3.3 | Provide and fix 100mm dia PVC Rain Water pipe complete with bends fixed to walls with suitable clamps. | BI01010001010000000000000515BI0100001178 | 7 | Rmt |
|---|
| 51 | 3.4 | Repairing window & door shutter, M.S. Grill in pumphouse and its other miscellaneous work including supply of all labour, materials, T&P etc complete. | BI01010001010000000000000515BI0100001179 | 1 | Job |
|---|
| 52 | 3.41 | Supply and fix 35 mm thick Plywood door shutters including fixing of handle, bolt, locks, hings, springs & other fittings but excluding painting and supply of fittings. | BI01010001010000000000000515BI0100001180 | 1.9 | m2 |
|---|
| 53 | 3.5 | Maintenance of Roof with 50mm thick R.C.C. 1:1.5:3 cement, course sand, 20mm gauge stone grit including M.S. murga jali (50mm*40mm) of 3mm dia after filling of crack by bituminious filler including dismentling of surface, supply of all labour, materials, T&P etc complete as per direction of Engineer In-charge | BI01010001010000000000000515BI0100001181 | 17.5 | m2 |
|---|
| 54 | 3.61 | Repairing of plaster of drain with 1:4 cement & local sand mortar including 3mm neat cement coart including supply of all material, labour T&P etc complete | BI01010001010000000000000515BI0100001182 | 30 | Rmt |
|---|
| 55 | 3.7 | Concealed wiring for internal electrification by cutting of groove in masonry, laying of heavy quality conduit pipe in wall & ceiling, fixing of clamps where as necessary. Fixing of junction box, ceiling roses and M.S./Wooden boards as required shape and sizes.Laying of I.S.I. Marked (Finolex, R.R.Cable or equivalent brand ) copper cable of required gauge. Fixing of ON/OFF switches, Angle holder, 5 amp -5 pin plug, power lug,ceiling rose for fan & tube light and indicator of Anchor or Equivalent Brand. Including supply of all material required for completion of internal wiring , Labour , T&P etc. complete. as per instruction of engineer in charge.\n | BI01010001010000000000000515BI0100001183 | 8 | no |
|---|
| 56 | 3.8 | Supply and fixing of ISI marked of approved make and quality of 100 Amp Kit- kat set and plywood pannel board including all labour, T&P etc complete as per direction of Engineer In-Charge. | BI01010001010000000000000515BI0100001184 | 1 | Job |
|---|
| 57 | 4 | Renovation of Boundry wall & Gate | BI01010001010000000000000515BI0100001185 | | |
|---|
| 58 | 4.1 | Supply andf fixing of new M.S. Gate fabricated with M.S work in small size and section for gate including drilling holes riveting ort welding including labour T&P etc. required for proper completion of work.( Main Gate ) and ( wicket gate ) as per direction of Engineer In-Charge. | BI01010001010000000000000515BI0100001186 | 200 | Kg |
|---|
| 59 | 4.2 | Finishing wall with apex weather proof emulsion of approved make and quality ( Asian brand ) over one priming coat on new work with two coats to give an even shade. Including repairing of plaster (approx 25% in 1:4 cement & local sand), scraping of old paint/ surface, preparation of surface with Birla wall putty including supply of all materials , labour T&P etc required for proper completion of the work as per direction of Engineer In-Charge. | BI01010001010000000000000515BI0100001187 | 340 | m2 |
|---|
| 60 | 4.3 | Earth filling in plinth including supply of necessary quantity of earth from a distance not exceeding 10 km from the site of work including watering , dressing etc rate to include the cost of all materials , labour T&P etc required for proper completion of the work. | BI01010001010000000000000515BI0100001188 | 45 | m3 |
|---|
| 61 | 4.4 | Construction of Brick on edge pavement for approach to water works, as per departmental type design and drawing and as per specifications laid down in the bid document, including supply of all materials , labour, T&P etc.required for proper completion of work as per instructions of Engineer -in -charge. | BI01010001010000000000000515BI0100001189 | 120 | M2 |
|---|
| 62 | 4.5 | Brick edging for arboriculture work including supply of all materials , labour, T&P etc.required for proper completion of work as per instructions of Engineer -in -charge. | BI01010001010000000000000515BI0100001190 | 115 | Rmt |
|---|
| 63 | 5 | Construction of NEW STAFF QUARTER | BI01010001010000000000000515BI0100001191 | | |
|---|
| 64 | 5.1 | STAFF QUARTER Half Set\nProvide all materials labour, T&P etc. complete and construction of one half set staff quarter at water works ite identified by the Engineer (in-charge) as per department type design and drawing and specifications of civil works laid down in the bid document, including all material labour, T&P etc complete for proper completion of work as per instructions of Engineer -in -charge.\n( payment will be made of as per detailed measurement, schedule G-5 annexed) | BI01010001010000000000000515BI0100001192 | 1 | Set |
|---|
| 65 | 6 | Construction of NEW PUMP HOUSE | BI01010001010000000000000515BI0100001193 | | |
|---|
| 66 | 6.1 | PUMP HOUSE\nProvide all materials, labour, T&P etc. complete and construct pump house(3.60x3.00x3.00) cum - chlorinating room (1.80x1.20x3.00) as per departmental type design and drawing and as per the specifications for civil work given in the bid document, including supply of all material, labour and T&P etc complete as per instructions of Engineer -in -charge. ( payment will be made of as per detailed measurement, schedule G-3 annexed) | BI01010001010000000000000515BI0100001205 | 1 | Set |
|---|
| 67 | 6.2 | BOUNDRY WALL\nConstruction of 1.2 m high and 115mm thick boundary wall with 230 mmx230 mm thick pillar made in Brick masonry in 1 cement and 4 course sand mortar, the spacing between two pillar should not be more than 2.0 m c/c and the depth of foundation should not be less than 0.60m, at the site of water works as per departmental type design and drawing, and, as per specifications given in the bid document including supply of all materials, labour T&P etc.for proper completion of work as per instructions of Engineer -in -charge. ( payment will be made of as per detailed measurement, schedule G-1 annexed) | BI01010001010000000000000515BI0100001206 | 40 | Rmt |
|---|
| 68 | 6.3 | Supply and fixing of new M.S. Gate fabricated with M.S work in small size and section for gate including drilling holes riveting ort welding including labour T&P etc. required for proper completion of work as per direction of Engineer In-Charge. | BI01010001010000000000000515BI0100001207 | 100 | Kg |
|---|
| 69 | 7 | Construction of TUBE WELL | BI01010001010000000000000515BI0100001195 | | |
|---|
| 70 | 7.1 | Construction of 1 Nos tube well of 1100 lpm discharge of 145 meter depth , Supply and Installation of Pump set 17.50 HP & 42 meter Head, Switch Gear, Main Piping and Valves Gauges, Tools and Spanners, Painting, Internal Electrification of pump house , Provision of soalr panell and LED light, Electromagnatic Type Chlorinator, 25 KVA Voltage Stablizer and Transmission Line complete. including supply of all material, Labour, T&P etc complete.\n( complete work for 1 nos tube well , details as per Schedule G-6 ) | BI01010001010000000000000515BI0100001196 | 1 | Job |
|---|
| 71 | 8 | Missilianeous Work (As per Direction Of Engineer In-Charge) | BI01010001010000000000000515BI0100001197 | | |
|---|
| 72 | 8.1 | 1st class brick work in 1:6 cement and coarse sand mortar in superstructure including necessary cutting and moldings of bricks as required and also including honey comb brick work of wall not to be less than 1 brick. including supply of all materials labour , T&P etc. required for proper completion of the work. | BI01010001010000000000000515BI0100001198 | 6 | M3 |
|---|
| 73 | 8.2 | As in item no.3 in 1:4 superstructure including necessary cutting and moudling of bricks as required and also including honey comb brick work thickness of wall not to be less than 1/2 brick hall. | BI01010001010000000000000515BI0100001199 | 2 | M3 |
|---|
| 74 | 8.3 | 12 mm thick plaster in 1:4 with cement and local sand mortar over brick work minimum thickness not to be less than 10 mm, including supply of all materials, labour, T&P etc Required for proper completion of the work. | BI01010001010000000000000515BI0100001200 | 40 | M2 |
|---|
| 75 | 8.4 | Finishing wall with apex weather proof emulsion of approved make and quality ( Asian brand ) over one priming coat on new work with two coats to give an even shade. Including repairing of plaster (approx 25% in 1:4 cement & local sand), preparation of surface with Birla wall putty including supply of all materials , labour T&P etc required for proper completion of the work as per direction of Engineer In-Charge. | BI01010001010000000000000515BI0100001201 | 40 | m2 |
|---|
| 76 | 8.5 | R.C.C work with cement , coarse sand 20mm gauge approved stone ballast in proportion 1:1.5:3 including supply of reinforcement (1%), its bending, fixing and binding the same with 0.50mm thick binding wire (to be supplied by the contractor) and including centering and shuttering , supply of all materials labour T&P etc required for proper completion of the work | BI01010001010000000000000515BI0100001202 | 1 | M3 |
|---|
| 77 | 8.6 | Supply and fixing of areal light at water works campus inculding all necessary fitting, all material T&P etc complete for proper completion of work as per direction of engineer incharge | BI01010001010000000000000515BI0100001203 | 2 | no |
|---|
| 78 | 9 | Provision of manpower for the operation of the Pumping plant during 3 month of retrofitting work and next 3 month of maintience period to run the scheme properly | BI01010001010000000000000515BI0100001204 | 1 | Job |
|---|