Housing Urban and Rular Development Government Departments Closing in 0 days TDR #25003807

Kiifb 2016-17 Additional Investigation Estimate For The Construction Ofkunduchira Bridge Connecting Thalassery Municipality And Kadirur Grama Panchayat In Kannur District Additional Investigation

Issued by Government Departments · Kadirur, Kerala
Tender Value
5.07 Lakhs
Estimated cost
Bid Submission
03 Aug 2020
0 days left
EMD
12700
Bank guarantee accepted
Document Fee
1125
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kadirur → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Kiifb 2016-17 Additional Investigation Estimate For The Construction Ofkunduchira Bridge Connecting Thalassery Municipality And Kadirur Grama Panchayat In Kannur District Additional Investigation

BOQ

Work Name: KIIFB 2016-17 Additional Investigation Estimate for the Construction of Kunduchira Bridge Connecting Thalassery Municipality & Kadirur Grama Panchayat in Kannur District
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Appendix ABI01010001010000000000000515BI0100001113
21.0156.13 : Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation,bridge and building sites at in accessible locations)Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation,bridge and building sites at in accessible locations)BI01010001010000000000000515BI01000011141.2Hecter
31.0256.12.a : Total station surveying and preparation of site plan for Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval.Total station surveying and preparation of site plan for Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval.BI01010001010000000000000515BI01000011151.2Hecter
41.0356.12.b : Total station surveying and preparation of site plan for plain built up area with hindrance to line of sight due to buildings/structures.Total station surveying and preparation of site plan for plain built up area with hindrance to line of sight due to buildings/structures.BI01010001010000000000000515BI01000011161.2Hecter
51.0456.17.1 : Providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing.Providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing.BI01010001010000000000000515BI0100001117180sqm
61.0556.1.a : Mobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the work<br>For machine boringMobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the workFor machine boringBI01010001010000000000000515BI01000011181set
71.0656.2.a : Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.<br>For machine boring.Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.For machine boring.BI01010001010000000000000515BI01000011199Nos hole
81.0756.9.1 : Erecting platform over 2 nos of 2nd Class Boat USING Mango wood planks of of not less than 30 mm thick, Mango wood joists of 100mm x 70mm at 60cm intervals including labour and hire of all materials and dismantling the platform after completion of work etc complete excluding hire of boats (A Platform of Minimum size 6.00m x 5.00m will be required)Erecting platform over 2 nos of 2nd Class Boat USING Mango wood planks of of not less than 30 mm thick, Mango wood joists of 100mm x 70mm at 60cm intervals including labour and hire of all materials and dismantling the platform after completion of work etc complete excluding hire of boats (A Platform of Minimum size 6.00m x 5.00m will be required)BI01010001010000000000000515BI010000112030sqm
91.0856.10 : Hire charges for providing 2 nos of 2nd Class boat with boatman for erecting the platform over which the boring plant is to be erected, and 1 no of 2nd Class boat with 1 boatman for conveying the departmental staff and labour engaged from the banks to platform and back etc.Hire charges for providing 2 nos of 2nd Class boat with boatman for erecting the platform over which the boring plant is to be erected, and 1 no of 2nd Class boat with 1 boatman for conveying the departmental staff and labour engaged from the banks to platform and back etc.BI01010001010000000000000515BI01000011213Day
101.0956.3.a.1 : Boring with rotary power drilling equipment's in\t\t\t\t\t\t\t\nall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For ordinary soil.Boring with rotary power drilling equipment's inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil.BI01010001010000000000000515BI010000112280metre
111.156.3.b.1 : Boring with rotary power drilling equipment in\t\t\t\t\t\t\t\n all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For ordinary soilBoring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soilBI01010001010000000000000515BI010000112380metre
121.1156.3.c.1 : Boring with rotary power drilling equipment in\t\t\t\t\t\t\t\nall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 20m upto 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.<br>For ordinary soil.Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 20m upto 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.For ordinary soil.BI01010001010000000000000515BI010000112440metre
131.1256.3.a.2 : Boring with rotary power drilling equipment in\t\t\t\t\t\t\t\nall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For under water.Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For under water.BI01010001010000000000000515BI010000112510metre
141.1356.3.b.2 : Boring with rotary power drilling equipment in\t\t\t\t\t\t\t\n all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For under water.Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For under water.BI01010001010000000000000515BI010000112610metre
151.1456.3.c.2 : Boring with rotary power drilling equipment in\t\t\t\t\t\t\t\nall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 20m upto 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.<br>For under water.Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 20m upto 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.For under water.BI01010001010000000000000515BI01000011275metre
161.1556.4 : Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under and banks of river.Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under and banks of river.BI01010001010000000000000515BI010000112818metre
171.1656.6 : Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.BI01010001010000000000000515BI010000112945each
181.1756.8 : Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.BI01010001010000000000000515BI010000113045each
191.1856.7 : Conducting standard penetration test in bore hole at any depth.Conducting standard penetration test in bore hole at any depth.BI01010001010000000000000515BI010000113145each
201.1956.11.a : Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)<br>Machine boring for 5 bore holes.Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)Machine boring for 5 bore holes.BI01010001010000000000000515BI01000011321set
211.256.11.c : Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate)<br>Additional set for machine boring(extra for bore holes exceeding 5 nos)Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate)Additional set for machine boring(extra for bore holes exceeding 5 nos)BI01010001010000000000000515BI01000011332set
221.2156.14.a : Cross section details:- River.Cross section details:- River.BI01010001010000000000000515BI0100001134600sqm
231.2256.15.a : Hydraulic Velocity Calculation:- River.Hydraulic Velocity Calculation:- River.BI01010001010000000000000515BI01000011351set
241.2356.16 : Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.BI01010001010000000000000515BI01000011361set

AI Tender Summary

OUR REF NO 25003807
AUTHORITY Government Departments
TENDER VALUE 5.07 Lakhs
LAST DATE 03-08-2020
Authority
Authority Name Public Works Department
Work Description Kiifb 2016-17 Additional Investigation Estimate For The Construction Ofkunduchira Bridge Connecting Thalassery Municipality And Kadirur Grama Panchayat In Kannur District Additional Investigation
Basic Detail
Tender No PWD/2020-2021/14675/BrSdnKNR
Bidding Type Tender
Location
City Kadirur
State Kerala
Key Dates
Publish Date 27 Jul 2020
Submission Date 03 Aug 2020
Open Date 06 Aug 2020
Finance
Tender Value 5.07 Lakhs
Tender Fee 1125
EMD 12700
Exemption Not Available
Document List
55AD23E9-6770-400C-9350-CB0829B50EBD.html
SBD.pdf
epay.pdf
Tendernotice_1.pdf
BOQ_529236.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 27, 2020
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 03, 2020
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Aug 06, 2020

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

55AD23E9-6770-400C-9350-CB0829B50EBD.html

pdf

SBD.pdf

pdf

epay.pdf

pdf

Tendernotice_1.pdf

xls

BOQ_529236.xls

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders